Staff Report
ITEM # 14
Page 1 of 2
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
BLP E Belt Line Road Development Addition, Minor Plat, Lot 1, Block A
P&Z HEARING DATE: August 18, 2022
STAFF REP.: Mary Paron-Boswell, Sr. Planner
LOCATION: North side of E. Belt Line Road, approximately 1,500-feet east of S. Denton Tap
Road
SIZE OF AREA: 10.519 acres of property
CURRENT ZONING: Light Industrial (LI)
REQUEST: To create a single lot, with associated easements, and fire lane for the construction
of two office-warehouse buildings.
APPLICANT: Owner: Surveyor:
Connor Tamlyn Grayson Cabellos
Bridge Investment Group Windrose Services
2000 McKinney, Suite 2075 1955 Lakeway Dr.
Dallas, TX 75201 Lewisville, Texas 75057
713-927-0152 214-217-2544
Connor.Tamlyn@bridgeig.com grayson.ceballos@windroseservices.com
HISTORY: This property has never been platted. It has been zoned Light Industrial for over
30 years.
HISTORIC COMMENT: There is no historical significance attached to this property.
TRANSPORTATION: East Belt Line Road is a six-lane divided thoroughfare built within a 110-foot
right-of-way.
SURROUNDING LAND USE & ZONING:
North – DART Rail Line & Single-Family Residential (SF-9)
South – Cypress Watters (City of Dallas)
East - Office Warehouse; Light Industrial (LI)
West – Office Warehouse: Planned Development (PD-218-LI)
COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, indicates this property as
Urban Residential Neighborhood.
ITEM # 14
Page 2 of 2
DISCUSSION: This is a simple replat request. This is a companion item to BLP E Belt Line Road
Development, where they are proposing two office warehouse buildings. This plat
will create one lot and dedicate associated easements and fire lanes on the property.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending approval of BLP E Belt Line Road Development Addition, Lot 1, Block A, Minor Plat
subject to the following conditions:
1. Additional comments may be generated upon detail engineering permit reviews.
ALTERNATIVES:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
ATTACHMENTS:
1. Minor Plat