Staff Report.BLPITEM 13
Page 1 of 3
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
BLP E Belt Line, Site Plan
P&Z HEARING DATE: August 18, 2022
STAFF REP.: Mary Paron-Boswell, Sr. Planner
LOCATION: North side of East Belt Line Road approximately 1,500 feet east of S. Denton Tap
Road
SIZE OF AREA: 10.519 acres of property
CURRENT ZONING: LI (Light Industrial)
REQUEST: Site plan approval for two office/warehouse buildings
APPLICANT: Owner: Engineer:
Connor Tamlyn Sony David
Bridge Investment Group Langan
2000 McKinney, Suite 2075 8951 Cypress Waters Blvd, Ste 150
Dallas, TX 75201 Dallas, Texas 75019
713-927-0152 817-328-3207
Connor.Tamlyn@bridgeig.com sdavid@langan.com
HISTORY: This property has been Light Industrial (LI) for over 30 years. It is still in abstract,
which will require that the property be platted.
TRANSPORTATION: East Belt Line Road is a six-lane divided thoroughfare built within a 110-foot right-
of-way.
SURROUNDING LAND USE & ZONING:
North – DART Rail Line & Single-Family Residential (SF-9)
South – Cypress Watters (City of Dallas)
East - Office Warehouse; Light Industrial (LI)
West – Office Warehouse: Planned Development (PD-218-LI)
COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, indicates this property as
Urban Residential Neighborhood.
DISCUSSION: Site Plan
ITEM 13
Page 2 of 3
The site is rectangular in shape, roughly 320-ft wide by 1,470-ft deep and
is zoned Light Industrial (LI) with other LI zoned properties to the east and
west, and the DART rail line to the north. Two office warehouse buildings
are proposed to be constructed on this site, one behind the other, with the
entrance on E. Belt Line Road. The first building closest to the street is
proposed to be 51,576-sf, while the second building will be located behind
the first and is proposed to be 74,568-sf., with the truck docks located on
the east side of the buildings. A detention basin is proposed to be located
at the northern end of the property adjacent to the DART tracks. The site
will have 163 parking spots for cars in addition to truck dock space and a
fire lane loops the site.
Landscape Plan/Tree Survey
All existing trees are proposed to be removed and mitigated with new
plantings. As designed, the Landscape Plan is compliant with the
regulations of the Landscape Ordinance. This site is exceeding the
minimum and is providing approximately 29% of the site in landscaped
areas and 230 trees. In addition, all proposed trees will be upgraded to a 4”
caliper. Overstory trees are being provided adjacent along the entire
perimeter of this site, in addition to adding extra trees along the rear of the
property. The eastern perimeter trees will aid in screening the truck docks.
The perimeter trees will screen not only the DART line from the site, but
also the residential located north of the DART line. Additional trees are also
being provided in the parking island in between the two buildings.
Building Elevations, Lighting & Signage
The buildings are approximately 32-ft in height with a parapet bringing it
up to 37-ft. The buildings will be made of tilt wall and will have a storefront
front façade with an awning separating the top and bottom windows. A
small section of the front entry will have an accent wall with a light wood
trim. The eastern and western facades of the building have windows to
break up the length as well as additional articulation, meeting the ordinance
requirements.
In reviewing the Photometric Study submitted, it appears that the ordinance
provisions will be achieved along the northern property line. All lighting
will need to be shielded and downward facing and will be reviewed at the
time of Building Permit. Signage for the site will need to meet ordinance
requirements.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of BLP E Belt Line Road Development Site Plan, subject to the
following conditions:
1. There may be additional comments at the time of Detail Engineering Review and Building Permit.
2. Signage shall comply with the sign ordinance and be generally consistent in terms of style,
placement and size.
3. Submission of the location and type of the lighting facilities, security lighting, screening and glare
shades will be required at the time of Building Permit, to ensure compliance with glare and lighting
ordinance.
ITEM 13
Page 3 of 3
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
4. Take under advisement for reconsideration at a later date
ATTACHMENTS:
1. Site Plan
2. Landscape Plan & Tree Preservation
3. Building Elevations & Rendering
4. Photometric Study (Electrical Site Plan)