PZ Staff ReportITEM # 6
Page 1 of 2
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
PD-280R-R, Coppell Sandy Lake Lift Station
P&Z HEARING DATE: March18, 2021
C.C. HEARING DATE: April 13, 2021
STAFF REP.: Mary Paron-Boswell, Sr. Planner
LOCATION: South side of Sandy Lake Road, approximately 1,100-feet east of MacArthur Blvd
SIZE OF AREA: 0.756 acres of property (0.725 ac. after 0.031ac. ROW dedication)
CURRENT ZONING: PD-280-R (Planned Development 280- Retail)
REQUEST: PD-280-R (Planned Development-280- Retail) to PD-280R-R (Planned
Development–280 Revised- Retail) to approve a Detail Site Plan for an improved
Lift Station.
APPLICANT: Owner: Engineer:
Michael Garza Adrian Dongell
City of Coppell Plummer Associates, Inc.
255 E Parkway Blvd 14755 Preston Road, Suite 420
Coppell, TX 75019 Dallas, TX 75254
HISTORY: This property has had a lift station on it for over 50 years. In 2015, a Planned
Development was approved to allow for a cell tower to be placed on the site. Just
after the approval, the site was impacted by a severe flood and the cell tower was
never constructed.
HISTORIC COMMENT: There is no historic significance other than a lift station has been on this site for over
50 years.
TRANSPORTATION: Sandy Lake Road is a four-lane divided concrete road contained within an
approximate 110-foot right-of-way.
SURROUNDING LAND USE & ZONING:
North: non-conforming plant nursery; R-Retail
South: Universal Academy Charter School; Planned Development-97R4-R
East: St. Joseph’s Retirement Village; Planned Development 114R-SF-7
West: Universal Academy Charter School; Planned Development-97R4-R
ITEM # 6
Page 2 of 2
COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, shows this land as appropriate for
Neighborhood Center Retail.
DISCUSSION: The lift station is nestled in between the Universal Academy and St. Joseph’s Retirement
Village. The sanitary sewer lift station was originally constructed on this property in 1975
and was modified in 2004. This is a dry-pit lift site which pumps wastewater from a lower
elevation to a higher elevation through a 20-inch force main. This process will improve
the site and provide a new lift station. These improvements include a new lift station, new
concrete pavement, an odor control system, yard piping, emergency generator, and
electrical control building. The existing lift station will be demolished and abandoned in
place once the new lift station is online. The lift station will have a firm capacity of
6.9MGD and this lift station provides service to approximately 23% of the city. Estimated
construction cost is about $5M.
Site Plan
This request has the existing 50+ year old lift station being replaced with an upgraded
system. The existing station will be demolished once the new station is online. The site is
accessed from Sandy Lake Road from a mutual access easement with Universal Academy.
The existing gravel along the driveway and remainder of the site will be upgraded to
concrete. The existing chain link fence at the entrance of the site will be replaced with an
eight-foot wrought iron fence with swinging gates. The upgraded lift station will include
a new electrical building, emergency generator and odor control system positioned along
the southwest side of the site and will be screened from view both from the existing
screening wall and the Universal Academy building. The odor control system is proposed
to have a shelter to protect it from the elements. The new lift station will be positioned
along the southern portion of the site. There are no proposed landscaping changes to the
property, other than replacing grass that may be disturbed during construction.
Elevations
The new lift station building will be a prefabricated building with a split-face block relief
textured pattern and sandy beige in color. The building is approximately 12 feet in height
and 11-ft 6-in by 25-ft 6-in. The shade structure over the odor control system will be made
of metal, protecting the equipment.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of PD-280R-R, subject to the following conditions:
1. There may be additional comments at the time of Building Permit and Detail Engineering Review.
ALTERNATIVES:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
ATTACHMENTS:
1. Site Plan
2. Building Elevations
3. Landscape Plans
4. Fencing Plans
5. Demolition Plans