Loading...
City Council Memo1 MEMORANDUM To: Mayor and City Council From: Mindi Hurley, Director of Community Development Date: April 13, 2021 Reference: Public Hearing: Consider approval of a zoning change request from PD-280-R (Planned Development-280- Retail) to PD-280R-R (Planned Development–280 Revised- Retail) to approve a Detail Site Plan for an improved Lift Station on 0.725 acres of land located on the south side of Sandy Lake Road, approximately 1,100 ft east of MacArthur Boulevard.. 2040: Foundation of Sustainable Government Executive Summary: The property improvements include a new lift station, new concrete pavement, an odor control system, yard piping, emergency generator, and electrical control building. The existing lift station will be demolished and abandoned in place once the new lift station is online. The lift station will have a firm capacity of 6.9MGD and this lift station provides service to approximately 23% of the city. Estimated construction cost is about $5M. The property will be platted in conjunction with this upgrade. Introduction: The lift station is nestled in between the Universal Academy and St. Joseph’s Retirement Village on Sandy Lake Road. The existing sanitary sewer lift station is approximately 50-years old and was modified in 2004. This is a dry-pit lift site which pumps wastewater from a lower elevation to a higher elevation through a 20-inch force main. This process will improve the site and provide a new lift station. The site is and will continue to be accessed from Sandy Lake Road from a mutual access easement with Universal Academy. The existing gravel along the driveway and remainder of the site will be upgraded to concrete. The existing chain link fence at the entrance of the site will be replaced with an eight-foot wrought iron fence with swinging gates. The upgraded lift station will include a new electrical building, emergency generator and odor control system positioned along the southwest side of the site and will be screened from view both from the existing screening wall and the Universal Academy building. The odor control system is proposed to have a shelter to protect it from the elements. The new lift station will be positioned along the southern portion of the site. There are no proposed landscaping changes to the property, other than replacing grass that may be disturbed during construction. On March 18, 2021, the Planning and Zoning Commission unanimously recommended APPROVAL (7-0) of PD- 280R-R, subject to the following condition: 1. There may be additional comments at the time of Building Permit and Detail Engineering Review. Legal Review: This did not require city attorney review. Fiscal Impact: None 2 Recommendation: The Planning and Zoning Commission recommended APPROVAL of the PD request subject to staff conditions listed above. Attachments: 1. PZ Staff Report 2. Site Plan 3. Building Elevations 4. Landscape Plans 5. Fencing Plans 6. Demolition Plans