Loading...
B-100-BUILDING PLAN AND DETAILS10'-0"11'-6"24'-0" 25'-6" NOTES BY SYMBOL 1.FIRE EXTINGUISHER ON BRACKET MOUNTED AT 3'-6" ABOVE FINISH FLOOR TO HANDLE. 2.PRECAST BUILDING ROOF LINE ABOVE, EXTENDS 3" BEYOND WALLS. 3.PRECAST BUILDING WALLS, MANUFACTURERS' STANDARD WALL THICKNESS TO PROVIDE STRUCTURAL STRENGTH AND SPECIFIED THERMAL VALUE. SHOWN AND DIMENSIONED AS 9" FOR REFERENCE PROPOSES. INTERIOR DIMENSIONS SHALL REMAIN FIRM. 4.GYPSUM BOARD CEILING AT 8'-0" AFF. 5.2X4 METAL STUDS WITH 1 LAYER 5/8" GYP. BD. ON EACH SIDE. EXTEND STUDS FROM SLAB TO 9'-0" AFF. 2 AC UNIT AC2 DOOR, REFER TO SPECIFICATION 11'-6"# 3 3 3 3 DOOR D1 1 AC UNIT AC1 11'-6"PRECAST CONCRETE WALL RIGID INSULATION 0.030" HDPE OVERLAY ON 3/4" PLYWOOD PRECAST CONCRETE WALL RIGID INSULATION, SANDWICH CONSTRUCTION SPLIT FACE BLOCK RELIEF PATTERN PRECAST CONCRETE ROOF PANEL RIGID INSULATION0.030" HDPE OVERLAY ON 3/4" PLYWOOD LIGHT GAUGE STEEL FRAMING LIGHT GAUGE STEEL FRAMING THE CITY OF COPPELL, TEXASSANDY LAKE LIFT STATION AND SYSTEM IMPROVEMENTSTHE CITY OFCOPPELL,TEXASTHESE DOCUMENTS ARE FOR INTERIM REVIEW AND ARE NOT INTENDED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES. PATRICK N. MOSELEY TEXAS P.E. NO. 72794 DATE: 3/4/2021 14755 PRESTON ROAD, STE 420 | DALLAS, TX 75254214.631.6100 | TBPE REGISTERED FIRM NUMBER F-13B-100 BUILDING PLAN AND DETAILSELECTRICALDOOR D2 5'-0"5'-0"4 5 AC UNIT, VERIFY OPENING SIZES DURING SUBMITTAL PROCESS SPLIT FACE BLOCK RELIEF PATTERN BATHROOM EXHAUST FAN VENT PLAN SCALE: 3/8" = 1'-0" EAST ELEVATION SCALE: 3/8" = 1'-0" NORTH ELEVATION SCALE: 3/8" = 1'-0" SOUTH ELEVATION SCALE: 3/8" = 1'-0" TYPE "A" WALL SECTION NTS TYPE "B" WALL SECTION NTS ROOF/CEILING SECTION NTS WEST ELEVATION SCALE: 3/8" = 1'-0" SPLIT FACE BLOCK RELIEF PATTERNAC UNIT, VERIFY OPENINGSIZES DURING SUBMITTALPROCESSPRECAST CONCRETE WALL CONNECTION DETAIL NTS STEEL ANGLE STEEL PLATE CONCRETE SLAB WELD