Staff ReportITEM # 6
Page 1 of 4
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE No.: PD-217R4-C, Coppel Chess Club (Formerly Doggie’s Wonderland)
P&Z HEARING DATE: August 19, 2021
C.C. HEARING DATE: September 14, 2021
STAFF REP.: Mary Paron-Boswell, AICP, Sr. Planner
LOCATION: South side of Vanbebber Drive and north side of Bethel School Road,
approximately 300’ east of Denton Tap Road
SIZE OF AREA: 1.13 acres
CURRENT ZONING: PD-217R3-C (Planned Development District-217 Revision 3 - Commercial)
REQUEST: A zoning change request from PD-217R3-C (Planned Development -217 Revision
3- Commercial) to PD-217R4-C (Planned Development-217 Revision 4-
Commercial) to approve a Conceptual Site Plan for the vacant Lot 5R and a Detail
Site Plan for the conversion of the existing Doggie Wonderland into a Chess Club
and learning center with additional parking spaces proposed.
APPLICANT: OWNER (Lot 4R) OWNER (LOT 5)
Coppell Realty Investment, LLC Ganesan, LLC
Christopher Lu Suresh Suruliraj
2008 E Peters Colony Rd 7268 Ridgepoint Dr.
Carrollton, TX. 75007 Irving , TX 75063
(214) 641-6450 (469) 235-2108
suresh.ganesan@gmail.com
CONSULTANT
DP Designs & Development, LLC
PO Box 681
Cedar Hill, TX 75106
(214) 675-9175
daniel@dp-designs.co
HISTORY: This property was originally constructed for La Petite Daycare in August 1984. In
January 1999, the ownership changed to the Sterling Academy Daycare and
operations ceased in July 2004. In 2007, PD-217-C (Planned Development-217-
Commercial) was approved to allow for the conversion to a pet day
care/boarding/spa on 0.637 acres. The plat for Lot 4 was approved on July 10, 2007.
Subsequently, the site was renovated and reopened operations. In 2009,
redevelopment plans requested an 11,688-square-foot expansion to the pet care
ITEM # 6
Page 2 of 4
outdoor play area, located on the vacant property to the north fronting Vanbebber
Drive (Lot 5). This proposed expansion of the outdoor play area did not occur. In
February of 2018, Council approved a PD amendment to allow a new building that
would have a kennel area, pet wash and bakery on the current Lot 5. Lot six had a
conceptual site plan attached. Later that year, the request was again modified to
construct a new Doggie Wonderland on Lot 5 and convert the existing Doggie
Wonderland into the rescue kennel and self-serve pet wash. This plan was not acted
upon.
HISTORIC COMMENT: This property has no historical significance.
TRANSPORTATION: Bethel School Road is designated on the Thoroughfare Plan as a two-lane collector
street, built within a 60-foot right-of-way. Vanbebber is a two-lane residential street
within a 50-foot right-of-way.
SURROUNDING LAND USE & ZONING:
North: Credit Union (PD-257R-C); Residential (SF-7)
South: Post Office (C)
East: Church (SF-7)
West: Convenience Store & Gas Station (C); Retail with Drive-Thru (PD-268-C)
COMPREHENSIVE PLAN:
Coppell 2030, A Comprehensive Master Plan, shows this property as appropriate
for Neighborhood Center Retail. These areas would provide for retail, restaurants,
office, civic and institutional primarily intended to serve nearby neighborhoods.
DISCUSSION: Site Plan & Parking
The plans approved in 2018 to build a new Doggie’s Wonderland and convert the
existing Doggie’s Wonderland into a rescue kennel and pet wash facility did not
materialize. The property has since undergone new ownership. With this request,
the existing Doggie Wonderland is proposed to be converted into a chess club and
learning center, offering tutoring for children. This change in use requires
additional parking. Nine additional parking spaces are proposed to be constructed
north of the existing building. The existing parking spaces are proposed to remain
and a variance was granted with the previous PD to allow the existing configuration
(8’6”x18’). A variance was also granted for the side yard setback for the existing
building. Nothing is currently proposed for Lot 5, but the lot lines for Lot 4R and
5, will be amended to reflect the change in property lines due to the need to provide
additional parking for Lot 4R. A concept plan is shown for Lot 5 to illustrate the
possible construction and parking layout in the future. A Detail Site Plan will be
required for the development of this lot, including any required screening between
Lot 5 and the adjacent properties.
This new use and site layout for Lot 4R will also see the removal of much of the
existing fencing and dog playground equipment. This area will be reorganized to
ITEM # 6
Page 3 of 4
include the additional parking spaces as well as additional trees and landscaping.
The applicant is requesting to leave the existing basketball court in place, which is
located at the northeast corner of the site. This is currently not reflected in the plans
but based on preliminary observation, the basketball court appears to be located
outside of the proposed parking area. Staff will require the plans to be updated to
reflect this change and recalculate the overall landscape area, which currently is
approximately 42% of the site.
Replatting & Documents:
The property is required to replatted to create the lot configuration as illustrated on
the Site Plan. The previous PD indicated that Lots 4R, 5 and 6 would share a
dumpster. This is still the plan and the draft agreement will need to be reviewed by
staff and filed at the County at the time of the replat. The plan will need to reflect
an access point or pedestrian gate for Lots 5 and 6 to access the dumpster as there
is currently a screening wall separating the different lots. The previous plan also
allowed for shared parking, this is no longer required with this configuration. Each
lot will stand alone in terms of parking.
Landscaping:
The area to the north of the building, outside of the additional parking area, will
have grass and additional trees planted. More trees are proposed along the eastern
perimeter and at the end of the parking islands. All of the existing trees (8 overstory
trees and 6 Crepe Myrtles) on site are proposed to remain. In all, the site is proposed
to be 42% landscaped, exceeding the 30% required by ordinance. Even with the
most recent proposed change to the site plan to have the basketball court area
remain (not currently shown), the site will be heavily landscaped. Staff will require
that the landscape plan and calculations be updated.
Screening, Elevations & Signage:
An existing masonry wall screens the eastern perimeter. This screening wall wraps
around the northern portion of Lot 4R to the western border. Shrubs line the
western perimeter. The concept plan needs to be updated to show a required
screening wall along Lot 5R for any future development.
The applicant is not proposing to make any changes to the existing building besides
signage. Staff recommends that any proposed signage meet city ordinance
requirements.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of the request subject to the following PD conditions:
1. A replat will be required to subdivide the lots and to provide any necessary easements.
2. Submit draft dumpster agreement for City Attorney review. This shall be filed with the plat.
3. All proposed signage shall comply with ordinance requirements.
4. Revise all plans to reflect the basketball court remaining and update the landscape calculations
accordingly.
5. Revise the plans to show access to the dumpster for the adjoining lots.
6. Revise the landscape plans to add a note that all required landscaping shall be irrigated.
ITEM # 6
Page 4 of 4
ALTERNATIVES:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
4. Take under advisement for reconsideration at a later date
ATTACHMENTS:
1. Site Plan
2. Landscape Plan & Tree Survey
3. Photos