City Council Memo1
MEMORANDUM
To: Mayor and City Council
From: Mindi Hurley, Director of Community Development
Date: November 9, 2021
Reference: Public Hearing: Consider approval of PD-307-LI, Maple Mart Expansion, Valley Ranch Center,
Lot A-R1, Block 1, a zoning change request from LI (SUP) to PD-307-LI (Planned Development-
307- Light Industrial), to approve a Detail Site Plan for a new convenience store building with
restaurant, approximately 4,504-sf in size with additional fuel pumps on 0.919 acres of land
located on the southeast corner of S. MacArthur Blvd. and E. Belt Line Road at 1301 E. Belt Line
Road at the request of Trinity Line Investment, LLC. being represented Mohammad Mozharul
Islam, P.E., Civil Urban Associates, Inc
2040: Create Business & Innovation Nodes
Executive Summary:
This site is located at the southeast corner of E. Belt Line Road and MacArthur Blvd. It is just under an acre in
size and abuts developed property. The request is to redevelop the site and build a new 4,500 square foot
convenience store with a portion of the new building containing a restaurant component. The existing gas canopy
will remain in place and two additional fuel pumps will be added under the existing canopy for a total of eight
pumps.
Introduction:
This property was originally platted and developed in 1987. Several SUP’s were approved allowing for the
development of a convenience store with fuel pumps and a car wash. The new convenience store is to be located
in the southern portion of the site where a car wash currently exists. The existi ng car wash will be demolished to
make room for the new store. The existing driveways will be modified to conform to today’s standards. The
existing gas canopy columns will be clad in a stone veneer to match the proposed building exterior. The site is
providing the 27 required parking spaces, which does not include the spaces adjacent to the pumps. The sidewalk
on the western portion of the building, the parking spaces in front of the building and the sidewalk in front of the
building will all be of stamped concrete. The landscaping requirement has been met and $1800 in tree mitigation
fees will be paid with this project. A curvilinear parking area along the street frontage will have hedges planted to
screen the headlights. Additional shrubs are proposed to be planted along MacArthur Blvd., E. Belt Line Road
and a portion of the southern and eastern perimeter. A total of three trees will be removed from the site, while 24
trees (4” cal. Cedar Elm and Cypress Pond) will be planted on-site. The building will be a tan Coronado stone
building, with stone accents and a metal canopy over the front door and sides of the building. At this time there is
no signage proposed for the building. If they decide to add signage, they will be required to adhere to City
ordinances. The canopy will be a neutral (gray) metal. No signage is proposed on the gas canopy, but there will
be signage on the gas pumps as shown in the elevations. The existing monument sign located at the northwest
corner of E. Belt Line and MacArthur Blvd is proposed to remain as is.
2
Analysis:
The applicant has included a PD Condition specifying that no outside storage, ice machines, vending machines or
sales of any kind are allowed outside of the building. The redevelopment of this site will positively impact the
aesthetics of this intersection.
On October 21, 2021, the Planning and Zoning Commission unanimously recommended APPROVAL (7-0) of
PD-307-LI, subject to the following conditions:
1. Additional engineering comments will be generated upon detail engineering plan review.
2. A tree removal permit is required prior to construction.
3. This property shall be replatted prior to the issuance of any engineering or building permits.
4. No outside storage, ice machines, vending machines or sales of any kind are allowed outside of the
building
Legal Review:
N/A
Fiscal Impact:
None
Recommendation:
The Planning and Zoning Commission recommended APPROVAL of the PD request subject to staff conditions
listed above.
Attachments:
1. PZ Staff Report
2. Site Plan
3. Landscape Plan & Tree Survey
4. Building Elevations
5. Photo of Existing Monument Sign