Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
construction documents.ADMAPP
<<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.G-001SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:TITLE SHEET0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211LOCATION MAPVICINITY MAPCOMPLIANCE CODEPROJECT SUMMARYPROJECT DESCRIPTIONUTILITY COMPANIESSHEET INDEXSHEETNO:DESCRIPTION:REV:DATE:BY:G-001TITLE SHEET109/08/21LRG-002GENERAL NOTES008/27/21CWV-101EXISTING SURVEY109/08/21LRC-101DETAILED SITE PLAN008/27/21CWC-102DETAILED SITE PLAN008/27/21CWC-201TOWER ELEVATION109/08/21LRC-401ANTENNA INFORMATION & SCHEDULE109/08/21LRC-501CONSTRUCTION DETAILS109/08/21LRE-501GROUNDING DEATILS109/08/21LRR-601SUPPLEMENTALR-602SUPPLEMENTALR-603SUPPLEMENTALPOWER COMPANY: TXUPHONE: (800) 242-9113TELEPHONE COMPANY: SBCPHONE: (800) 559-7928ALL WORK SHALL BE PERFORMED AND MATERIALS INSTALLEDIN ACCORDANCE WITH THE CURRENT EDITIONS OF THEFOLLOWING CODES AS ADOPTED BY THE LOCALGOVERNMENT AUTHORITIES. NOTHING IN THESE PLANS ISTO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TOTHESE CODES.1.INTERNATIONAL BUILDING CODE (IBC)2.NATIONAL ELECTRIC CODE (NEC)3.LOCAL BUILDING CODE4.CITY/COUNTY ORDINANCESSITE LOCATIONVERIZONANTENNA AMENDMENT DRAWINGSPROJECT TEAMAPPLICANT:VERIZON WIRELESSTOWER OWNER:AMERICAN TOWER10 PRESIDENTIAL WAYWOBURN, MA 01801ENGINEER:ATC TOWER SERVICES, LLC3500 REGENCY PKWY STE 100CARY, NC 27518SITE ADDRESS:636 SANDY LAKE ROADCOPPELL, TX 75019COUNTY: DALLASGEOGRAPHIC COORDINATES:LATITUDE: 32.97108056LONGITUDE: -96.97425833GROUND ELEVATION: 483' AMSLE SANDY LAKE RDPROJECT NOTESTHE PROPOSED PROJECT INCLUDES MODIFYING GROUND BASEDAND TOWER MOUNTED EQUIPMENT AS INDICATED PER BELOW:TOWER WORK:REMOVE (6) ANTENNA(s), (3) RRH(s), AND (6) 1-5/8" COAX CABLE(s),INSTALL (9) ANTENNA(s), (6) RRH(s), (1) OVP(s) AND(1) 1-1/4" HYBRID CABLE(s)EXISTING (3) ANTENNA(s), (1) OVP(s), (6) 1-5/8" COAX CABLE(s), AND(1) 1-1/4" HYBRID CABLE(s) TO REMAINGROUND WORK:INSTALL (1) OVPEXISTING (1) OVP TO REMAIN1.THE FACILITY IS UNMANNED.2.A TECHNICIAN WILL VISIT THE SITE APPROXIMATELY ONCE AMONTH FOR ROUTINE INSPECTION AND MAINTENANCE.3.THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT LANDDISTURBANCE OR EFFECT OF STORM WATER DRAINAGE.4.NO SANITARY SEWER, POTABLE WATER OR TRASH DISPOSALIS REQUIRED.5.HANDICAP ACCESS IS NOT REQUIRED.6.THE PROJECT DEPICTED IN THESE PLANS QUALIFIES AS ANELIGIBLE FACILITIES REQUEST ENTITLED TO EXPEDITEDREVIEW UNDER 47 U.S.C. § 1455(A) AS A MODIFICATION OF ANEXISTING WIRELESS TOWER THAT INVOLVES THECOLLOCATION, REMOVAL, AND/OR REPLACEMENT OFTRANSMISSION EQUIPMENT THAT IS NOT A SUBSTANTIALCHANGE UNDER CFR § 1.61000 (B)(7).PROJECT LOCATION DIRECTIONSFROM I-35 & SANDY LAKE ROAD GO WEST ON SANDY LAKEROAD 4 MILES, TOWER ON NORTH SIDE IF ROADPROPERTY OWNER:UNITED PARCEL SERVICE636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NAME: COPPELL #2 (CO-LOCATE)ATC SITE NUMBER: 309374VERIZON SITE NAME: COPPELL_EASTVERIZON SITE NUMBER:108080SITE ADDRESS:636 SANDY LAKE ROADCOPPELL, TX 75019N MOORE RDSAMUEL BLVDRAVEN LN <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.G-002SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:GENERAL NOTES0FOR CONSTRUCTIONCW08/27/210GENERAL CONSTRUCTION NOTES:1.OWNER FURNISHED MATERIALS, VERIZON "THE COMPANY" WILL PROVIDE AND THECONTRACTOR WILL INSTALLA.BTS EQUIPMENT FRAME (PLATFORM) AND ICEBRIDGE SHELTER (GROUNDBUILD/CO-LOCATE ONLY)B.AC/TELCO INTERFACE BOX (PPC)C.ICE BRIDGE (CABLE TRAY WITH COVER) (GROUND BUILD/CO-LOCATE ONLY, GCTO FURNISH AND INSTALL FOR ROOFTOP INSTALLATION)D.TOWERS, MONOPOLESE.TOWER LIGHTINGF.GENERATORS & LIQUID PROPANE TANKG.ANTENNA STANDARD BRACKETS, FRAMES AND PIPES FOR MOUNTINGH.ANTENNAS (INSTALLED BY OTHERS)I.TRANSMISSION LINEJ.TRANSMISSION LINE JUMPERSK.TRANSMISSION LINE CONNECTORS WITH WEATHERPROOFING KITSL.TRANSMISSION LINE GROUND KITSM.HANGERSN.HOISTING GRIPSO.BTS EQUIPMENT2.THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL OTHER MATERIALS FOR THECOMPLETE INSTALLATION OF THE SITE INCLUDING, BUT NOT LIMITED TO, SUCHMATERIALS AS FENCING, STRUCTURAL STEEL SUPPORTING SUB-FRAME FOR PLATFORM,ROOFING LABOR AND MATERIALS, GROUNDING RINGS, GROUNDING WIRES,COPPER-CLAD OR XIT CHEMICAL GROUND ROD(S), BUSS BARS, TRANSFORMERS ANDDISCONNECT SWITCHES WHERE APPLICABLE, TEMPORARY ELECTRICAL POWER,CONDUIT, LANDSCAPING COMPOUND STONE, CRANES, CORE DRILLING, SLEEPERS ANDRUBBER MATTING, REBAR, CONCRETE CAISSONS, PADS AND/OR AUGER MOUNTS,MISCELLANEOUS FASTENERS, CABLE TRAYS, NON-STANDARD ANTENNA FRAMES ANDALL OTHER MATERIAL AND LABOR REQUIRED TO COMPLETE THE JOB ACCORDING TOTHE DRAWINGS AND SPECIFICATIONS. IT IS THE POSITION OF VERIZON TO APPLY FORPERMITTING AND CONTRACTOR RESPONSIBLE FOR PICKUP AND PAYMENT OF REQUIREDPERMITS.3.ALL WORK SHALL CONFORM TO ALL CURRENT APPLICABLE FEDERAL, STATE, AND LOCALCODES, INCLUDING ANSI/EIA/TIA-222, AND COMPLY WITH ATC CONSTRUCTIONSPECIFICATIONS.4.CONTRACTOR SHALL CONTACT LOCAL 811 FOR IDENTIFICATION OF UNDERGROUNDUTILITIES PRIOR TO START OF CONSTRUCTION.5.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIREDINSPECTIONS.6.ALL DIMENSIONS TO, OF, AND ON EXISTING BUILDINGS, DRAINAGE STRUCTURES, ANDSITE IMPROVEMENTS SHALL BE VERIFIED IN FIELD BY CONTRACTOR WITH ALLDISCREPANCIES REPORTED TO THE ENGINEER.7.DO NOT CHANGE SIZE OR SPACING OF STRUCTURAL ELEMENTS.8.DETAILS SHOWN ARE TYPICAL; SIMILAR DETAILS APPLY TO SIMILAR CONDITIONS UNLESSOTHERWISE NOTED.9.THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTIONSAFETY WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.10.CONTRACTOR SHALL BRACE STRUCTURES UNTIL ALL STRUCTURAL ELEMENTS NEEDEDFOR STABILITY ARE INSTALLED. THESE ELEMENTS ARE AS FOLLOWS: LATERAL BRACING,ANCHOR BOLTS, ETC.11.CONTRACTOR SHALL DETERMINE EXACT LOCATION OF EXISTING UTILITIES, GROUNDSDRAINS, DRAIN PIPES, VENTS, ETC. BEFORE COMMENCING WORK.12.INCORRECTLY FABRICATED, DAMAGED, OR OTHERWISE MISFITTING ORNONCONFORMING MATERIALS OR CONDITIONS SHALL BE REPORTED TO THE VERIZONREP PRIOR TO REMEDIAL OR CORRECTIVE ACTION. ANY SUCH REMEDIAL ACTION SHALLREQUIRE WRITTEN APPROVAL BY THE VERIZON REP PRIOR TO PROCEEDING.13.EACH CONTRACTOR SHALL COOPERATE WITH THE VERIZON REP, AND COORDINATE HISWORK WITH THE WORK OF OTHERS.14.CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED BY CONSTRUCTION OF THISPROJECT TO MATCH EXISTING PRE-CONSTRUCTION CONDITIONS TO THE SATISFACTIONOF THE VERIZON CONSTRUCTION MANAGER.15.ALL CABLE/CONDUIT ENTRY/EXIT PORTS SHALL BE WEATHERPROOFED DURINGINSTALLATION USING A SILICONE SEALANT.16.WHERE EXISTING CONDITIONS DO NOT MATCH THOSE SHOWN IN THIS PLAN SET,CONTRACTOR SHALL NOTIFY THE VERIZON REP AND ENGINEER OF RECORDIMMEDIATELY.17.CONTRACTOR SHALL ENSURE ALL SUBCONTRACTORS ARE PROVIDED WITH A COMPLETEAND CURRENT SET OF DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT.18.CONTRACTOR SHALL REMOVE ALL RUBBISH AND DEBRIS FROM THE SITE AT THE END OFEACH DAY.19.CONTRACTOR SHALL COORDINATE WORK SCHEDULE WITH AMERICAN TOWERCORPORATION (ATC) AND TAKE PRECAUTIONS TO MINIMIZE IMPACT AND DISRUPTION OFOTHER OCCUPANTS OF THE FACILITY.20.CONTRACTOR SHALL FURNISH VERIZON AND AMERICAN TOWER CORPORATION (ATC)WITH A PDF MARKED UP AS-BUILT SET OF DRAWINGS UPON COMPLETION OF WORK.21.PRIOR TO SUBMISSION OF BID, CONTRACTOR SHALL COORDINATE WITH VERIZON REPTO DETERMINE WHAT, IF ANY, ITEMS WILL BE PROVIDED. ALL ITEMS NOT PROVIDEDSHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. CONTRACTOR WILL INSTALLALL ITEMS PROVIDED.22.PRIOR TO SUBMISSION OF BID, CONTRACTOR SHALL COORDINATE WITH VERIZON REPTO DETERMINE IF ANY PERMITS WILL BE OBTAINED BY CONTRACTOR. ALL REQUIREDPERMITS NOT OBTAINED BY VERIZON MUST BE OBTAINED, AND PAID FOR, BY THECONTRACTOR.23.CONTRACTOR SHALL INSTALL ALL SITE SIGNAGE IN ACCORDANCE WITH VERIZONSPECIFICATIONS AND REQUIREMENTS.24.CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO VERIZON FOR REVIEW ANDAPPROVAL PRIOR TO FABRICATION.25.ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO MANUFACTURER'SSPECIFICATIONS AND LOCATED ACCORDING TO VERIZON SPECIFICATIONS, AND ASSHOWN IN THESE PLANS.26.THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED HEREIN.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL THE CONSTRUCTIONMEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FORCOORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT.27.CONTRACTOR SHALL NOTIFY VERIZON REP A MINIMUM OF 48 HOURS IN ADVANCE OFPOURING CONCRETE OR BACKFILLING ANY UNDERGROUND UTILITIES, FOUNDATIONS ORSEALING ANY WALL, FLOOR OR ROOF PENETRATIONS FOR ENGINEERING REVIEW ANDAPPROVAL.28.CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY INCLUDING COMPLIANCE WITHALL APPLICABLE OSHA STANDARDS AND RECOMMENDATIONS AND SHALL PROVIDE ALLNECESSARY SAFETY DEVICES INCLUDING PPE AND PPM AND CONSTRUCTION DEVICESSUCH AS WELDING AND FIRE PREVENTION, TEMPORARY SHORING, SCAFFOLDING,TRENCH BOXES/SLOPING, BARRIERS, ETC.29.THE CONTRACTOR SHALL PROTECT AT HIS OWN EXPENSE, ALL EXISTING FACILITIES ANDSUCH OF HIS NEW WORK LIABLE TO INJURY DURING THE CONSTRUCTION PERIOD. ANYDAMAGE CAUSED BY NEGLECT ON THE PART OF THIS CONTRACTOR OR HISREPRESENTATIVES, OR BY THE ELEMENTS DUE TO NEGLECT ON THE PART OF THISCONTRACTOR OR HIS REPRESENTATIVES, EITHER TO THE EXISTING WORK, OR TO HISWORK OR THE WORK OF ANY OTHER CONTRACTOR, SHALL BE REPAIRED AT HISEXPENSE TO THE OWNER'S SATISFACTION.30.ALL WORK SHALL BE INSTALLED IN A FIRST CLASS, NEAT AND WORKMANLIKE MANNERBY MECHANICS SKILLED IN THE TRADE INVOLVED. THE QUALITY OF WORKMANSHIPSHALL BE SUBJECT TO THE APPROVAL OF THE VERIZON REP. ANY WORK FOUND BYTHE VERIZON REP TO BE OF INFERIOR QUALITY AND/OR WORKMANSHIP SHALL BEREPLACED AND/OR REWORKED AT CONTRACTOR EXPENSE UNTIL APPROVAL ISOBTAINED.31.IN ORDER TO ESTABLISH STANDARDS OF QUALITY AND PERFORMANCE, ALL TYPES OFMATERIALS LISTED HEREINAFTER BY MANUFACTURER’S NAMES AND/ORMANUFACTURER’S CATALOG NUMBER SHALL BE PROVIDED BY THESE MANUFACTURERSAS SPECIFIED.32.VERIZON FURNISHED EQUIPMENT SHALL BE PICKED-UP AT THE VERIZON WAREHOUSE,NO LATER THAN 48HR AFTER BEING NOTIFIED INSURED, STORED, UNCRATE, PROTECTEDAND INSTALLED BY THE CONTRACTOR WITH ALL APPURTENANCES REQUIRED TO PLACETHE EQUIPMENT IN OPERATION, READY FOR USE. THE CONTRACTOR SHALL BERESPONSIBLE FOR THE EQUIPMENT AFTER PICKING IT UP.33.VERIZON OR HIS ARCHITECT/ENGINEER RESERVES THE RIGHT TO REJECT ANYEQUIPMENT OR MATERIALS WHICH, IN HIS OWN OPINION ARE NOT IN COMPLIANCE WITHTHE CONTRACT DOCUMENTS, EITHER BEFORE OR AFTER INSTALLATION AND THEEQUIPMENT SHALL BE REPLACED WITH EQUIPMENT CONFORMING TO THEREQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE CONTRACTOR AT NO COST TOVERIZON OR THEIR ARCHITECT/ENGINEER.SPECIAL CONSTRUCTIONANTENNA INSTALLATION NOTES:1.WORK INCLUDED:A.ANTENNA AND COAXIAL CABLES ARE FURNISHED BY VERIZON UNDER ASEPARATE CONTRACT. THE CONTRACTOR SHALL ASSIST ANTENNAINSTALLATION CONTRACTOR IN TERMS OD COORDINATION AND SITE ACCESS.ERECTION SUBCONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OFPERSONNEL ANDB.INSTALL ANTENNA AS INDICATE ON DRAWINGS AND VERIZON SPECIFICATIONS.C.INSTALL GALVANIZED STEEL ANTENNA MOUNTS AS INDICATED ON DRAWINGSD.INSTALL FURNISHED GALVANIZED STEEL OR ALUMINUM WAVEGUIDE.E.CONTRACTOR SHALL PROVIDE FOUR (4) SETS OF SWEEP TESTS USINGANRITZU-PACKARD 8713B RF SCALAR NETWORK ANALYZER. SUBMIT FREQUENCYDOMAIN REFLECTOMETER(FDR) TESTS RESULTS TO THE PROJECT MANAGER.SWEEP TESTS SHALL BE AS PER ATTACHED RFS "MINIMUM FIELD TESTINGRECOMMENDED FOR ANTENNA AND HELIAX COAXIAL CABLE SYSTEMS" DATED10/5/93. TESTING SHALL BE PERFORMED BY AN INDEPENDENT TESTING SERVICEAND BE BOUND AND SUBMITTED WITHIN ONE WEEK OF WORK COMPLETION.F.INSTALL COAXIAL CABLES AND TERMINATING BETWEEN ANTENNAS ANDEQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. WEATHERPROOF ALLCONNECTIONS BETWEEN THE ANTENNA AND EQUIPMENT PER MANUFACTURER'SREQUIREMENTS. TERMINATE ALL COAXIAL CABLE THREE (3) FEET IN EXCESS OFENTRY PORT LOCATION UNLESS OTHERWISE STATED.G.ANTENNA AND COAXIAL CABLE GROUNDING:2.ALL EXTERIOR #6 GREED GROUND WIRE "DAISY CHAIN" CONNECTIONS ARE TO BEWEATHER SEALED WITH RFS CONNECTORS/SPLICE WEATHERPROOFING KIT #221213 OREQUAL.3.ALL COAXIAL CABLE GROUNDING KITS ARE TO BE INSTALLED ON STRAIGHT RUNS OFCOAXIAL CABLE (NOT WITHIN BENDS)ALL DISCREPANCIES FROM WHAT IS SHOWN ON THESECONSTRUCTION DRAWINGS SHALL BE COMMUNICATED TO ATCENGINEERING IMMEDIATELY FOR CORRECTION OR RE-DESIGN. FAILURE TO COMMUNICATE DIRECTLY WITH ATC ENGINEERING ORANY CHANGES FROM THE DESIGN CONDUCTED WITHOUT PRIORAPPROVAL FROM ATC ENGINEERING SHALL BE THE SOLERESPONSIBILITY OF THE GENERAL CONTRACTOR. <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.C-101SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:DETAILED SITE PLAN0FOR CONSTRUCTIONCW08/27/2101DETAILED SITE PLANSITE PLAN NOTES:1.THIS SITE PLAN REPRESENTS THE BEST PRESENT KNOWLEDGE AVAILABLE TO THE ENGINEER AT THE TIME OF THIS DESIGN. THE CONTRACTOR SHALL VISIT THE SITEPRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING CONDITIONS RELATED TO THE SCOPE OF WORK FOR THIS PROJECT.2.ICE BRIDGE, CABLE LADDER, COAX PORT, AND COAX CABLE ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL CONFIRM THE EXACT LOCATION OF ALLPROPOSED AND EXISTING EQUIPMENT AND STRUCTURES DEPICTED ON THIS PLAN. BEFORE UTILIZING EXISTING CABLE SUPPORTS, COAX PORTS, INSTALLING NEWPORTS OR ANY OTHER EQUIPMENT, CONTRACTOR SHALL VERIFY ALL ASPECTS OF THE COMPONENTS MEET THE ATC SPECIFICATIONS.3.NO ELECTRICAL SCOPE IS INCLUDED IN THIS PROJECT. LEGENDAUTOMATIC TRANSFER SWITCHATSDISCONNECTDELECTRICALEFIBERFBOLLARDBGENERATOR RECEPTACALGHAND HOLE, VAULTHH, VICE BRIDGEIBKENTROX BOXKGENERATORGENMETERMLIGHTING CONTROLLCPULL BOXPBPOWER POLEPPTELCOTTRANSFORMERTRNXCHAINLINK FENCEGROUNDING TEST WELLCELL SITE CABINETCSCPROPOSED CABLE LENGTH:1.ESTIMATED LENGTH OF PROPOSED CABLE IS 135'.ESTIMATED LENGTH OF CABLE WAS PROVIDED BYCUSTOMER OR CALCULATED BY ADDING THE RADCENTER AND THE DISTANCE FROM THE SHELTERENTRY PLATE TO THE TOWER (ALONG THE ICEBRIDGE) AND A SAFETY FACTOR MEASUREMENT OF15% (OF THE TWO PREVIOUS VALUES), CDS DEFERTO GREATEST CABLE LENGTH.2.ROUTE PROPOSED CABLES ALONG SAME PATH ASEXISTING CABLES AND IN ACCORDANCE WITHSTRUCTURAL ANALYSIS. IF ADEQUATE SPACEEXISTS, ROUTE CABLES THROUGH ENTRY PORTHOLE, UP INSIDE OF MONOPOLE, AND THROUGH EXITPORT HOLE. IF ROUTING OUTSIDE THE MONOPOLE,ATTACH CABLES USING STAND-OFF ADAPTERSMOUNTED TO TOWER USING STAINLESS STEELBANDING. ADEQUATELY SECURE CABLES USINGEITHER APPROPRIATELY SIZED STAINLESS STEELSNAP-INS OR MOUNTING HARDWARE AND BRACKETSAS SPECIFIED BY CABLE MANUFACTURER.GRAPHIC SCALE( IN FEET )1 UNIT = 5 FEET5305PROPOSED (1) 1-1/4" HYBRID CABLE(ROUTED PER PROPOSED CABLE LENGTH NOTE 2)(REFER TO PROPOSED CABLE LENGTH NOTE ONTHIS PAGE)(6) 1-5/8" COAX CABLES (TO BE REMOVED) <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.C-102SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:DETAILED SITE PLAN0FOR CONSTRUCTIONCW08/27/2101GROUND SPACE PLANPROPOSED (1) 1-1/4" HYBRID CABLE(ROUTED PER PROPOSED CABLE LENGTH NOTE 2)(REFER TO PROPOSED CABLE LENGTH NOTE ONTHIS PAGE)(6) 1-5/8" COAX CABLES (TO BE REMOVED)PROPOSED VERIZON WIRELESS(1) RAYCAP OVP12 OVP(s) (TO BE INSTALLED)GRAPHIC SCALE( IN FEET )1 UNIT = 3 FEET31.503 <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.C-201SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:TOWER ELEVATION0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211ATC HAS NOT ANALYZED THE EXISTING ANTENNAMOUNT(S) TO DETERMINE ADEQUATESTRUCTURAL CAPACITY FOR PROPOSEDCARRIER LOADING.1TOWER ELEVATIONSCALE: N.T.S.2C-401PROPOSED VERIZONEQUIPMENT1C-401TOWER NOTE:1.IT IS THE CONTRACTOR'S RESPONSIBILITY TOCONFIRM WITH THE PROJECT MANAGER THATTHEY HAVE THE MOST RECENT VERSION OF THESTRUCTURAL ANALYSIS BEFORE COMMENCINGWORK. EXISTING AND PROPOSED TOWERAPPURTENANCES, MOUNTS, AND ANTENNAS ARESHOWN BASED ON THE STRUCTURAL ANALYSIS.2.WHERE APPLICABLE, ALL NEW ANTENNAS,EQUIPMENT, MOUNTS, CABLING, ETC. SHALL BEPAINTED/SOCKED TO MATCH EXISTING EQUIPMENTIN ACCORDANCE WITH FAA, JURISDICTION, AND/OROTHER LOCAL REQUIREMENTS.3.ROUTE PROPOSED CABLES ALONG SAME PATH ASEXISTING CABLES AND IN ACCORDANCE WITHSTRUCTURAL ANALYSIS. IF ADEQUATE SPACEEXISTS, ROUTE CABLES THROUGH ENTRY PORTHOLE, UP INSIDE OF MONOPOLE, AND THROUGHEXIT PORT HOLE. IF ROUTING OUTSIDE THEMONOPOLE, ATTACH CABLES USING STAND-OFFADAPTERS MOUNTED TO TOWER USING STAINLESSSTEEL BANDING. ADEQUATELY SECURE CABLESUSING EITHER APPROPRIATELY SIZED STAINLESSSTEEL SNAP-INS OR MOUNTING HARDWARE ANDBRACKETS AS SPECIFIED BY CABLEMANUFACTURER.4.TOWER ELEVATIONS ARE MEASURED FROM TOPOF BASE PLATE TO MATCH STRUCTURALANALYSIS. ELEVATIONS DO NOT REFLECT TRUEABOVE GROUND LEVEL (A.G.L.)5. TOWER ELEVATION DEPICTION MAY NOT REFLECTALL EQUIPMENT INCLUDED IN STRUCTURALANALYSIS. REFER TO STRUCTURAL ANALYSIS FORFULL TOWER LOADING.EXISTING VERIZONRAD CENTER @100' <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.C-401SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:ANTENNA INFORMATION& SCHEDULE0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211ATC HAS NOT ANALYZED THE EXISTING ANTENNAMOUNT(S) TO DETERMINE ADEQUATESTRUCTURAL CAPACITY FOR PROPOSEDCARRIER LOADING.1EXISTING ANTENNA PLANSCALE: N.T.S.2FINAL ANTENNA PLANSCALE: N.T.S.3EQUIPMENT SCHEDULESFINAL FIBER DISTRIBUTION / OVP BOXFINAL CABLING SUMMARYMODEL NUMBERSTATUSCOAXHYBRIDSTATUSRCMDC-6627-PF-48ADD-(1) 1-1/4"ADDEXISTING FIBER DISTRIBUTION/OVP BOXEXISTING CABLING SUMMARYMODEL NUMBERSTATUSCOAXHYBRIDSTATUSRMVCABLE LENGTHS FOR JUMPERSJUNCTION BOX TO RRU: 15'RRU TO ANTENNA: 10'1.CONFIRM WITH VERIZON REPFOR APPLICABLEUPDATES/REVISIONS ANDMOST RECENT RFDS FOR NSNCONFIGURATION (CONFIG). GCTO CAP ALL UNUSED PORTS.2.CONFIRM SPACING OFPROPOSED EQUIP DOES NOTCAUSE TOWER CONFLICTSNOR IMPEDE TOWER CLIMBINGPEGS.NOTESSTATUS ABBREVIATIONSRMV: TO BE REMOVED: TO REMAINREL: TO BE RELOCATEDADD: TO BE ADDEDFINAL ANTENNA SCHEDULELOCATIONANTENNA SUMMARYNON ANTENNA SUMMARYSECTORRADAZPOSANTENNABANDMECH/ELECD-TILTSTATUSADDITIONAL TOWERMOUNTED EQUIPMENTSTATUSALPHA100'0°A1(2) NHH-65C-R2B700/1900/AWS/AWS3LTE & 1900 5G-ADD--A2B2/B66A RRH-BR049B5/B13 RRH-BR04CADDADDA3MT6407-77AL-SUB6 5G-ADD--BETA100'120°B1(2) NHH-65C-R2B700/1900/AWS/AWS3LTE & 1900 5G-ADD--B2B2/B66A RRH-BR049B5/B13 RRH-BR04CADDADDB3MT6407-77AL-SUB6 5G-ADD--GAMMA100'240°C1(2) NHH-65C-R2B700/1900/AWS/AWS3LTE & 1900 5G-ADD--C2B2/B66A RRH-BR049B5/B13 RRH-BR04CADDADDC3MT6407-77AL-SUB6 5G-ADD--EXISTING ANTENNA SCHEDULELOCATIONANTENNA SUMMARYNON ANTENNA SUMMARYSECTORRADAZPOSANTENNABANDMECH/ELECD-TILTSTATUSADDITIONAL TOWERMOUNTED EQUIPMENTSTATUSRMVRMVRMVRMVRMVRMVRMVRMVRMVRMVRMVRMVA1A3B1B3C1C3AZ.= ALPHA 0° AZ.= ALPHA 0°AZ.=GAMMA240°AZ.=GAMMA240°AZ.=BETA120°AZ.=BETA120°PROPOSED ANTENNA (TYP.)(REFER TO CHART FORDETAILED INFORMATION)2C-501PROPOSED RRU (TYP.)(REFER TO CHART FORDETAILED INFORMATION)3C-501PROPOSED OVP BOX(REFER TO CHART FORDETAILED INFORMATION)4C-501PROPOSED SIDE BY SIDEANTENNA MOUNT (TYP. 3)(COMMSCOPE P/N:BSAMNT-SBS-1-2)FOR MOUNTING (2) 11.9" WIDTHANTENNAS1C-501 <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.C-501SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:CONSTRUCTIONDETAILS0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211PROPOSED RRU (OPTION 2)(MOUNT PER MANUFACTURER'S SPECS)(ENSURE THAT BRACKET DOES NOT CONFLICT WITHEXISTING OR PROPOSED EQUIPMENT)PROPOSED RRU (OPTION 1)(MOUNT PER MANUFACTURER'S SPECS)(ENSURE THAT BRACKET DOES NOT CONFLICT WITHEXISTING OR PROPOSED EQUIPMENT)3PROPOSED RRU MOUNTING DETAIL - TYPICALSCALE: N.T.S.TO BE REPLACED WITH PROPOSED 2-3/8" O.D. X 96" LONGIF REQUIRED TO ACCOMMODATE PROPOSED MOUNTING BRACKETPROPOSED SIDE BY SIDE ANTENNA MOUNT(COMMSCOPE P/N: BSAMNT-SBS-1-2)PROPOSED ANTENNA (TYP. 2)MOUNTED TO SIDE-BY-SIDE MOUNTPROFILE VIEWISOMETRIC VIEW (BY MANUFACTURER)1PROPOSED SIDE-BY-SIDE MOUNTSCALE: NOT TO SCALEPROPOSED OVP TO BE MOUNTED TO THETOWER USING STAINLESS STEEL BANDING(MOUNT PER MANUFACTURER'S SPECS)(ENSURE THAT BRACKET DOES NOT CONFLICTWITH EXISTING OR PROPOSED EQUIPMENT)PROPOSED OVP MOUNTING4SCALE: N.T.S.PROPOSED 2-3/8" O.D. X 96" LONGPROPOSED ANTENNA2PROPOSED 5G ANTENNA MOUNTING DETAIL - TYPICALSCALE: N.T.S. <<w=175; h=175; n=BLANK - SIG; a=11>>SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.E-501SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:GROUNDING DEATILS0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211NOTES:1.THIS DETAIL IS INTENDED TO SHOW THE GENERAL GROUNDING REQUIREMENTS. SLIGHTADJUSTMENTS MAY BE REQUIRED BASED ON EXISTING SITE CONDITIONS. THECONTRACTOR SHALL MAKE FIELD ADJUSTMENTS AS NEEDED AND INFORM THECONSTRUCTION MANAGER OF ANY CONFLICTS.2.SITE GROUNDING SHALL COMPLY WITH VERIZON GROUNDING STANDARDS, LATESTEDITION, AND COMPLY WITH VERIZON GROUNDING CHECKLIST, LATEST VERSION. WHENNATIONAL AND LOCAL GROUNDING CODES ARE MORE STRINGENT THEY SHALL GOVERN.PROPOSED CONNECTOR ANDWEATHERPROOFING KIT1TYPICAL ANTENNA GROUNDING DIAGRAMSCALE: N.T.S.PROPOSED ANTENNAPROPOSED JUMPERPROPOSED WEATHERPROOFING KIT2E-5013E-501GROUND BAR MOUNTEDNEAR/BELOW ANTENNA(TO BE INSTALLED IFREQUIRED)#6 AWG STRANDED CUWIRE WITH GREEN, 600V,THWN INSULATIONANTENNA CABLE TOCABINET (TYP.)PROPOSED CABLEGROUND KITPROPOSED #6 AWGSTRANDED CUWIRE WITH GREEN, 600V,THWN INSULATION TO PROPOSED RRUGROUND LUG (TYP.)PROPOSED #6 AWGSTRANDED CUWIRE WITH GREEN, 600V,THWN INSULATION TO PROPOSED OVP BOXDO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS DIRECTGROUND WIRE DOWN TO GROUND BAR.CONTRACTOR SHALL PROVIDE WEATHERPROOFING KIT (ANDREW PARTNUMBER 221213) AND INSTALL/TAPE PER MANUFACTURER'S SPECIFICATIONS.2CABLE GROUND KIT CONNECTION DETAILSCALE: N.T.S.TO ANTENNATO EQUIPMENTTO GROUND BARANTENNA CABLE 2 1/2"Ø MAXGROUNDING KIT PER CABLEMANUFACTURER'S RECOMMENDATIONS(ANDREW OR APPROVED EQUAL)#6 AWG STRANDED COPPER GROUNDWIRE (GROUNDED TO GROUND BAR)GROUND KIT NOTES:1.2.1/4" X 4" X 6" GROUND BAR(ERICO P/N: EGBA14406CC OR EQUAL)3TOWER GROUND BAR DETAILSCALE: N.T.S.GROUND BAR NOTES:1.GROUND BAR KITS COME WITH ALL HARDWARE, NUTS, BOLTS,WASHERS, ETC. EXCEPT THE STRUCTURAL MOUNTING MEMBER(S).2.GROUND BAR TO BE BONDED DIRECTLY TO TOWER.3/8" SS LOCK WASHER(EACH SIDE)TWO-HOLE LUG, TO BE USEDWITH #2 AWG BCW(LOWER TOWER GROUNDBAR ONLY)3/8" X 1-1/2" SS BOLT(EACH SIDE) SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.R-601SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:1ADD DETAILS/SPECSCW08/27/211LR09/08/211SUPPLEMENTAL1EQUIPMENT SPECIFICATIONSSCALE: N.T.S.NOTE: THIS SHEET CREATED BY OTHERS AND PROVIDEDBY REQUEST OF CUSTOMER WITHOUT EDIT. SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.R-602SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211SUPPLEMENTAL1RFDS EQUIPMENT SUMMARYNOTE: THIS SHEET WAS CREATED BY OTHERSAND PROVIDED AT THE REQUEST OF THECUSTOMER WITHOUT EDIT. GENERALCONTRACTOR IS TO CHECK WITH THEVERIZON CM TO ENSURE THIS IS THE MOSTRECENT VERISON OF THE RFDS. SHEET NUMBER:REVISION:Copyright © 2021 ATC IP LLC, All Rights Reserved.R-603SEAL:DESCRIPTIONREV.DATEBYATC TOWER SERVICES, LLC3500 REGENCY PARKWAYSUITE 100CARY, NC 27518PHONE: (919) 468-0112COA: F-6274THE USE AND PUBLICATION OF THESE DRAWINGSSHALL BE RESTRICTED TO THE ORIGINAL SITE FORWHICH THEY ARE PREPARED. ANY USE ORDISCLOSURE OTHER THAN THAT WHICH RELATESTO AMERICAN TOWER OR THE SPECIFIED CARRIERIS STRICTLY PROHIBITED. NEITHER THE ARCHITECTNOR THE ENGINEER WILL BE PROVIDING ON-SITECONSTRUCTION REVIEW OF THIS PROJECT.CONTRACTOR(S) MUST VERIFY ALL DIMENSIONSAND ADVISE AMERICAN TOWER OR THE SPECIFIEDCARRIER OF ANY DISCREPANCIES. ANY PRIORISSUANCE OF THIS DRAWING IS SUPERSEDED BYTHE LATEST VERSION.DATE DRAWN:08/27/21ATC JOB NO:COPPELL_EASTCUSTOMER ID:13685523_D1108080CUSTOMER #:309374ATC SITE NAME:COPPELL #2 (CO-LOCATE)COPPELL_EAST636 SANDY LAKE ROADCOPPELL, TX 75019ATC SITE NUMBER:SITE ADDRESS:VERIZON SITE NAME:0FOR CONSTRUCTIONCW08/27/211ADD DETAILS/SPECSLR09/08/211SUPPLEMENTAL1RFDS PLUMBING DIAGRAMPLUMBING DIAGRAM NOT PROVIDED WITH RFDSNOTE: THIS SHEET WAS CREATED BY OTHERSAND PROVIDED AT THE REQUEST OF THECUSTOMER WITHOUT EDIT. GENERALCONTRACTOR IS TO CHECK WITH THEVERIZON CM TO ENSURE THIS IS THE MOSTRECENT VERSION OF THE RFDS.