Staff Report
ITEM 6
Page 1 of 3
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
Seefried Development, Site Plan
P&Z HEARING DATE: October 20, 2022
STAFF REP.: Mary Paron-Boswell, Sr. Planner
LOCATION: Northeast corner of South Royal Lane and Gateway Boulevard
SIZE OF AREA: 16.071 acres of property
CURRENT ZONING: LI (Light Industrial)
REQUEST: Site plan approval for two office/warehouse buildings
APPLICANT: Developer: Engineer: Owner:
Seefried Industrial Nick Hobbs PFN-Dallas, LLC
3030 LBJ Freeway BGE, Inc. 2060 Mt. Paran Rd. N.W.
Suite 1650 2595 Dallas Parkway Ste. 211
Dallas, TX 75234 Suite 101 Atlanta, GA 30327
214-393-6065 Frisco, Texas 75034 404-240-6270
469-644-1664 awildman@noromgt.com
nhobbs@bgeinc.com
HISTORY: This property is zoned Light Industrial (LI) and has been used as a Park’n Fly
location since 1995.
TRANSPORTATION: South Royal Lane is a four-lane divided thoroughfare built within a 110-foot
right-of-way. South of the property Gateway Boulevard is a two-lane undivided
thoroughfare built within a 70-foot right-of-way at this segment.
SURROUNDING LAND USE & ZONING:
North – DART Rail Line & Light Industrial (LI)
South – LBJ Freeway
East - Office Warehouse; Light Industrial (LI)
West – Vacant Land (LI)
COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, indicates this property as
Freeway Special District.
ITEM 6
Page 2 of 3
DISCUSSION: Site Plan
The site is currently being used as a Park’n Fly location and has several
buildings in addition to car canopy areas that will all be removed to allow
for this new construction. The site is zoned Light Industrial (LI) and is
surrounded by other LI properties. It is bounded by Royal Lane to the west,
Gateway Boulevard to the south, DART rail line to the north and another
office-warehouse site to the east. Two office warehouse buildings are
proposed to be constructed on this site, side by side, with the truck courts
facing one another. There is an entrance proposed on Gateway Boulevard
which will bring trucks straight into the truck court area. Two other
entrances will be located on Royal Lane. Building 1 which is closest to
Royal Lane is proposed to be 120,120-sf, while Building 2 which is located
on the eastern portion of the site is proposed to be 161,720-sf. The site will
have 360 parking spaces for cars in addition to truck dock space. A fire lane
loops the site and bisects the truck court area.
Landscape Plan/Tree Survey
The existing site has trees planted around the perimeter of the site. Interior
to the site exists some landscape islands which contain grass. The vast
majority of existing trees on-site will be preserved. There are
approximately seven Live Oak trees that will be removed along with some
Crepe Myrtles, the majority of which are located at the existing entrance to
the facility. Trees proposed to be removed will be mitigated with 113 new
tree plantings. As designed, the Landscape Plan is compliant with the
regulations of the Landscape Ordinance and exceeds the amount to total
landscape area. The landscape buffer along Royal Lane, along the DART
perimeter to the north and segments of Gateway Boulevard are greater than
the minimum. The perimeter trees will serve to buffer the DART line from
the site.
Building Elevations, Lighting & Signage
The buildings are approximately 40-42-ft in height with the parapet. The
buildings will be made of tilt wall and will have a storefront front façade
with an awning separating the top and bottom windows. The corners of the
buildings have been dressed up and provide glass, decorative reveals. The
truck court side of the buildings will also have decorative reveals to break
up the length as well as additional articulation, meeting the ordinance
requirements.
All lighting will need to be shielded and downward facing and will be
reviewed at the time of Building Permit. Signage for the site will need to
meet ordinance requirements. Two existing billboard signs located on the
property will be removed with this development.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
ITEM 6
Page 3 of 3
Staff is recommending APPROVAL of Seefried Development Site Plan, subject to the following
conditions:
1. There may be additional comments at the time of Detail Engineering Review and Building Permit.
2. Signage shall comply with the sign ordinance and be generally consistent in terms of style,
placement and size.
3. Submission of the location and type of the lighting facilities, security lighting, screening and glare
shades will be required at the time of Building Permit, to ensure compliance with glare and lighting
ordinance.
4. A tree removal permit shall be required.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
4. Take under advisement for reconsideration at a later date
ATTACHMENTS:
1. Site Plan
2. Landscape Plan & Tree Preservation
3. Building Elevations