Loading...
Building Elevationsd O CD z C.� w 0 cn 0 O Of d w O z O V) w n z w w 0 w 0 O n m n m w _ O Z Q ry O w H Q d Z 0 w J O z 0 w N w m 0 0 z Lv U w cn J Q z O V) N w w O rK n w O z w w cn z z Q N Q c� z d D O C� z c� w 0 N 0 m d w O H ch w a 0 m d w cn z Q w rK z w w w 0 w z Q z 0 0 z c? w 0 w 0 z Q z w O 0 Ln 0 N (i) 2 3 4 5 6 7 8 9 10 11 12 DECORAVE DECORAVE REVEALS r REVEALS �4 �4 DECORAVE CONCRETE TILT -WALL REVEALS PANEL, PAINTED OA O o O N CONCRETE TILT -WALL PANEL, PAINTED I p A o O N CONCRETE TILT -WALL DECORAVE PANEL, PAINTED REVEALS C O O CONCRETE TILT -WALL o PANEL, FAINTED O N O - U CONCRETE TILT -WALL DECORAVE O A PANEL, PAINOTED REVEALS O N O N N O O N N O _ _ O N N O N O C9 N O C9 0 AO I IJ o 0 No COMPOSITE METAL J I " INSULATED GLASS IN -V PANEL CANOPY ALUMINUM STOREFRONT PERSONNEL DOOR, PTD O I " INSULATED GLASS IN -V ALUMINUM STOREFRONT MATERIAL CALCULATIONS - WEST ELEVATION TOTAL FACADE 23,586 SF 100% CONCRETE TILT -WALL PANEL 20,377 SF 86.3% DOORS / WINDOWS / LOUVERS 2,483 SF 10.5% FACTORY FINISHED METAL PANELS 726 SF 3.2% MATERIAL CALCULATIONS - SOUTH ELEVATION TOTAL FACADE 9,670 SF 100% CONCRETE TILT -WALL PANEL 8,560 SF 88.5% DOORS / WINDOWS / LOUVERS 904 SF 9.4% FACTORY FINISHED METAL PANELS 206 SF 2.1% C COMPOSITE METAL PANEL CANOPY PERSONNEL DOOR, PTD O E! I " INSULATED GLASS IN ` COMPOSITE METAL ALUMINUM STOREFRONT PANEL CANOPY BUILDING 1 WEST ELEVATION SCALE: 1 "=20'-0" BUILDING 1 3 SOUTH ELEVATION SCALE: 1 "=20'-0" n12 ng 4 n8 n7 6 n5 n4 n3 n2 in, no 'N A4.0 I n in 25'- 1 1 3/4 " 1 04'-4 3/8 " 20-0" 1 01'-4" 52'-0" 1 04-O" 20-8" 1 03'-8" 25'- 1 1 3/4 " CONC. SCREEN WALL, PTD. OB CONCRETE TILT -WALL PANEL, PAINTED O CONTINUOUS METAL RECESSED DOWN O MATCH O GUTTER AND POUT PTD. TO BUILDING TYP. 14' CONC. SCREEN WALLS DECORAVE REVEALS I WALLPACK, TYP. CONTINUOUS RECESSED DOWNSPOUT MATCH BUILDI VETAL GUTTER AND PTD. TO CONCRETE TILT -WALL G TYP. O PANEL, PAINTED O O m r O O 75'-0" g g cn m g O N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0/ IL 14 L MmL__ / \ —A p Mir CONC. SCREEN WALL, PTD. O O AS�SPEC'D PP AS TO MATCH BUILDING, TYP. 3'-4" x 7-2" OPENING ON SCREEN WALL WALL LOUVER —� U TYP. HOLLOW METAL DOOR WI—J STEEL GALV. METAL TRANSOM PLATE PTD. STAIRS, TYP. TO MATCH BUILDING TYP. 2' X 2' WALL STEEL GALV. LOUVER STAIRS, TYP. METAL WALL LOUVER MILL FINISH MATERIAL CALCULATIONS - EAST ELEVATION TOTAL FACADE 22,647 SF 100% CONCRETE TILT -WALL PANEL 18,758 SF 82.8% DOORS / WINDOWS / LOUVERS 3,889 SF 17.2% PAINT SCHEDULE A BASE PAINT COLOR - SW 7656 RHINESTONE Og ACCENT COLOR - SW 7668 MARCH WIND JQL ACCENT COLOR - SW 7674 PEPPERCORN MATERIAL CALCULATIONS - NORTH ELEVATION TOTAL FACADE 8,770 SF 100% CONCRETE TILT -WALL PANEL 7,663 SF 87.4% DOORS / WINDOWS / LOUVERS 904 SF 10.3% FACTORY FINISHED METAL PANELS 206 SF 2.3% STEEL GALV. HOLLOW METAL DOOR W/ U 9' x 1 O' PREFINISHED AS SPEC'D PREFINISHED STAIRS, TYP. METAL TRANSOM PLATE PTD. �/ OVERHEAD DOOR, TYP. TO MATCH BUILDING, TYP. TO MATCH BUILDING TYP. BUILDING 1 2 EAST ELEVATION SCALE: 1 "=20'-0" 1 BUILDING 1 NORTH ELEVATION 9ETAL v c 0 L. W -0 0 a)N � _Y N UOf NN �w++ci z000 Uof U, W nNN.r W CL (L 0 uJI Fe LL W tA PRELIMINARY NOT FOR REGUALTORY APPROVAL, PERMIT OR CONSTRUCTION job no 2206 sheet A3.0 0 co Lrnrn N VI j N _ 0 W I N N i N � 00 L � QLO SCALE: 1 "=20'-0" n D O 0 z 0 Ln w 0 07 L 0 m n I O z O V) 7 w z w I LLJ _ D 0 _ I 3i LLJ O n n m LLJ _ O r Z Q m O w Q d z 0 III 0 z 0 w D LLJ m 0 0 z U) Lv u m w V) J Q z O U) cn LLJ I O d w O H Z LLJ D V) z z Q a U Z d D O CD z 0 w 0 Ln 0 ry d I O r ry III a 0 m m LLJ cn z Q w Z LLJ w w 2 I 0 w z Q I Z O U N Z w 0 w 0 z Q Z w O 0 CD COMPOSITE METAL PANEL CANOPY „J ALUMINUM STOREFRONT BUILDING 2 POND ELEVATION SCALE: 1 "=20'-0" MATERIAL CALCULATIONS - POND ELEVATION TOTAL FACADE 2,731 SF 100% CONCRETE TILT -WALL PANEL 2,653SF 97.1% DOORS / WINDOWS / LOUVERS 74 SF 2.7% FACTORY FINISHED METAL PANELS 4 SF .2% COM F PAINT SCHEDULE A BASE PAINT COLOR - SW 7656 RHINESTONE OB ACCENT COLOR - SW 7668 MARCH WIND C ACCENT COLOR - SW 7674 PEPPERCORN MATERIAL CALCULATIONS - WEST ELEVATION TOTAL FACADE 25,870 SF 100% CONCRETE TILT -WALL PANEL 20,368 SF 78.7% DOORS / WINDOWS / LOUVERS 5,092 SF 19.7% FACTORY FINISHED METAL PANELS 410 SF 1.6% 0 1 03'4 1 /4 " 10 20-8" 11 DECORAVE WALLPACK, TYP. REVEALS CONTINUOUS RECESSED DOWNSPOUT MATCH BUILDING METAL GUTTER AND PTD. TO TYP. (D O m m 0 0 0 0 0 0 0 0 0 HOLLOW METAL DOOR W/ STEEL GALV. METAL TRANSOM PLATE PTD. B METAL WALL LOUVER — STAIRS, TYP. MILL FINISH TO MATCH BUILDING TYP. MATERIAL CALCULATIONS - NORTH ELEVATION TOTAL FACADE 11,861 SF 100% CONCRETE TILT -WALL PANEL 10,727 SF 90.4% DOORS / WINDOWS / LOUVERS 928 SF 7.8% FACTORY FINISHED METAL PANELS 206 SF 1.8% METAL TRANSOM PLATE PTD. TO MATCH BUILDING TYP. db O 1 29'-7 3/4 " CONCRETE TILT -WALL PANEL, PAINTED O ;Z :J 'U BUILDING 2 :2 PARTIAL WEST ELEVATION SCALE: 1 "=20'-0" 12) (13) (14 ab CONCRETE TILT -WALL PANEL, PAINTED 0 c� �0 — 9' x 10' PREFINISHED STEEL DRIVE-IN DOOR OVERHEAD DOOR, TYP. AS SPEC'D BUILDING, TYP. TO MATCH BUILDING, TYP. M ' Q 0 DECORAVE REVEALS O a 0 0 N O I" INSULATED GLASS IN ` COMPOSITE METAL ALUMINUM STOREFRONT PANEL CANOPY BUILDING 2 2 PARTIAL WEST ELEVATION SCALE: 1 "=20'-0" BUILDING 2 NORTH ELEVATION SCALE: 1 "=20'-0" U) W UO C � ., CV 3 Uo ° v Lu .1 _cO °o UQ�U� Lu Lu CL O w a 0 LLJ ,LL LL! LLJ PRELIMINARY NOT FOR REGUALTORY APPROVAL, PERMIT OR CONSTRUCTION job no 2206 sheet A3.1 H 1 7� m V N n D 0 m CD z c.� w 0 cn 0 m n W O z 0 w n Z W W _ O _ w 0 O d d w w _ 0 Z Q W O W H Q d Z O w J O z 0 W W m 0 O z w U_ LI..I cn J Q Z 0 V) 0 w W O w d W 0 H Z w w cn z z Q N Q U Z d D 0 C� Z U W 0 N 0 m d W O ry w a 0 m m W cn z Q w rK z w w w 0 W z Q H z 0 0 z c? w 0 W _ 0 z Q z W O 0 Ln 0 N I MATERIAL CALCULATIONS - EAST ELEVATION TOTAL FACADE 27,040 SF 100% CONCRETE TILT -WALL PANEL 26,872 SF 99.3% DOORS / WINDOWS / LOUVERS 168 SF .7% rL n13 n12 n,o 0 0 Off '-0" 2 0-0" 1 30'-0" 2 0-0" CONCRETE TILTWALLROOF PANEL, PAINTED OREVEALS LINE WALLPACK, TYP. DECOR AVE ■ ■ ■ ------------------k ------------------------ ----------------------------------------------- --------------------------------------------- ---------------------------------------------- ---------------------------------------------- ---------------------------------------------- ---------------------------------------------- -------------------------------------------- ------------------------------- ----------- ---------------------------------------------- ---------------------------------------------- ---------------------------------------------- ----------- _ _ _ _ _ B - ■ n 0 PER50NNEL DOOR, PTD O n 0 :N :M ■Q ■ :N :W �Z ■ ;J :U .Q : BUILDING 2 PARTIAL EAST ELEVATION v SCALE: 1 "=30'-0" n ■ ■ 20-0" 1 30'-0" 20-0" 1 04'-0" DECORAVE REVEALS WALLPACK, TYP. ROOF LINE CONCRETE TILT -WALL PANEL, PAINTED O _ _ _ _ _ _ B O O ■ PAINT SCHEDULE A BASE PAINT COLOR - SW 7656 RHINESTONE OB ACCENT COLOR - SW 7668 MARCH WIND ACCENT COLOR - SW 7674 PEPPERCORN MATERIAL CALCULATIONS - SOUTH ELEVATION TOTAL FACADE 11,861 SF 100% CONCRETE TILT -WALL PANEL 10,727 SF 90.4% DOORS / WINDOWS / LOUVERS 928 SF 7.8% FACTORY FINISHED METAL PANELS 206 SF 1.8% `PERSONNEL DOOR, PTD (D BUILDING 2 � PARTIAL EAST ELEVATION L SCALE: 1 "=30'-0" F E D C B A Rn'_rz I ni' - - VLl. _)1111V L REVEAL5 DECORAVE CONCRETE TILT-WALLO REVEALS PANEL, PAINTED B o A o O ' O I CONCRETE TILTWALL= PANEL, PAINTED € R o O OF LINE - WALLPACK, TYP. ------------------------------------ -------------------------------------------- --------------------------------------------- --------------- N o 0 B O N Fill ir COMPOSITE METAL —V I " INSULATED GLA55 IN --V U PANEL CANOPY ALUMINUM STOREFRONT `PERSONNEL DOOR, PTD O BUILDING 2 SOUTH ELEVATION SCALE: 1 "=30'-0" W -0 0 C `1 N 3 UN 0 NW+'M LO 0 0 L U(if -0� W W CL 0 w 0 LLJ �c LL W W tA PRELIMINARY NOT FOR REGUALTORY APPROVAL, PERMIT OR CONSTRUCTION job no 2206 sheet A3.2 0 00 Lrnrn � VI j N 0 0 W I U) N o= ^L^ 0 L1. co