Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2023 CISD Playground Town Center Elem.ADM APP.062024
TOWN CENTERELEMENTARYREMOVE ALL CONCRETEPLAYGROUND CURBS ANDSIDEWALKS IN ENTIRETY.REMOVE ALL PLAYGROUNDEQUIPMENT IN ITS ENTIRETY.POSTS AND FOUNDATIONS.REMOVE ALL CONCRETEPLAYGROUND CURBS ANDSIDEWALKS IN ENTIRETY.REMOVE ALL PLAYGROUNDEQUIPMENT IN ITS ENTIRETY.POSTS AND FOUNDATIONS.EXISTING PLAYGROUNDEXISTING PLAYGROUNDEXISTINGCONCRETESIDEWALK(TO REMAIN)EXISTINGCANOPY TOREMAINEXISTINGCANOPY TOREMAINEXISTINGCONCRETESIDEWALK(TO REMAIN)EXISTINGGAGA PIT TOREMAINEXISTINGWALKINGTRACK TOREMAINTOWN CENTER ELEMENTARY 185 N. HEARTZ ROADSITE PLANNFILE LOCATION: R:\COPPELL2\ELEM. PLAYGROUNDS\2023 CISD Playgrounds PAVING.DWG SAVED: 1/20/2024 2:30 PM PLOTTED:1/20/2024 3:06 PM ADDRESS: 200 S. DENTON TAP RD. COPPELL, TX 75019 Attn: CONTACT: The seal appearing on this document was authorized by Mike Glenn, P.E. 35059, on JANUARY 19, 2024C-9DSLENO DOLLCA-PREBOEFY O U 1-800-245-4545STXET AS N!GI .CIME,TSYLACPLAY GROUND EQUIPMENT NOTE:GENERAL SITE NOTES1.PRIOR TO ANY CONSTRUCTION THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE CONTRACTDOCUMENTS AND SPECIFICATIONS, THE PLANS INCLUDING ALL NOTES, THE CITY OF COPPELL SPECIFICATIONSAND ANY OTHER APPLICABLE STANDARDS OR SPECIFICATIONS RELEVANT TO THE PROPER COMPLETION OF THEWORK SPECIFIED. FAILURE ON THE PART OF THE CONTRACTOR TO FAMILIARIZE HIMSELF WITH ALL STANDARDSOR SPECIFICATIONS PERTAINING TO THIS WORK SHALL IN NO WAY RELIEVE THE CONTRACTOR OFRESPONSIBILITY FOR PERFORMING THE WORK IN ACCORDANCE WITH ALL SUCH APPLICABLE STANDARDS ANDSPECIFICATIONS.2.CONTRACTOR SHALL HAVE IN HIS POSSESSION, PRIOR TO CONSTRUCTION, ALL NECESSARY PERMITS, LICENSES,ETC. CONTRACTOR SHALL HAVE AT LEAST ONE SET OF APPROVED ENGINEERING PLANS AND SPECIFICATIONSON-SITE AT ALL TIMES.3.ALL WORK SHALL CONFORM TO THE CITY OF COPPELL SPECIFICATIONS, STANDARDS, AND DETAILS.4.IF UNFORESEEN PROBLEMS OR CONFLICTS ARE ENCOUNTERED IN THE CONSTRUCTION, FOR WHICH ANIMMEDIATE SOLUTION IS NOT APPARENT, THE ENGINEER AND OWNER SHALL BE NOTIFIED IMMEDIATELY.5.IT WILL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO PROTECT ALL EXISTING PUBLIC AND PRIVATEUTILITIES THROUGHOUT THE CONSTRUCTION OF THIS PROJECT. CONTRACTOR SHALL CONTACT THEAPPROPRIATE UTILITY COMPANIES FOR LINE LOCATIONS, PRIOR TO COMMENCEMENT OF CONSTRUCTION ANDSHALL ASSUME FULL LIABILITY TO THOSE COMPANIES FOR ANY DAMAGES CAUSED TO THEIR FACILITIES.6.CONTRACTORS SHALL BE RESPONSIBLE FOR FIELD LOCATING EXISTING UTILITIES AND IMPROVEMENTS PRIOR TOCONSTRUCTION.GENERAL DEMOLITION NOTESNOTE:CONTRACTOR SHALL RESTORE ANYDAMAGE TO THE SITE BACK TO ITSORIGINAL CONDITION.GENERAL IRRAGATION NOTES1.CONTRACTOR SHALL BE RESPONSIBLE FOR CAPPING ALL IRRIGATION LATERAL LINES IN THE AREA OF THE NEWPLAYGROUND SLAB. CONTRACTOR SHALL WORK WITH THE SCHOOL DISTRICT PERSONAL FOR ANY MAIN LINERELOCATIONS THAT WOULD NEED TO OCCUR.2.CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY OTHER SPRINKLER LINES LINES DAMAGED DURINGCONSTRUCTION.3.IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE EROSION CONTROL DURING CONSTRUCTION UNTIL SOD ISINSTALLED .4.CONTRACTOR SHALL REMOVE ALL SPRINKLER HEADS AND EQUIPMENT IN THE AREAS OCCUPIED BY THECONSTRUCTION AND STAGING AREAS. TERMINATE/CAP OFF ALL LINES AS REQUIRED. ALL SPRINKLER HEADSAND EQUIPMENT SHALL BE GIVEN TO THE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALLNECESSARY CHANGES TO THE IRRIGATION SYSTEM THAT ARE REQUIRED TO KEEP THE REMAINING AREASOUTSIDE THE CONSTRUCTION AREAS IN WORKING ORDER. THIS INCLUDES RELOCATION OF ANY VALVES, PIPING,CONTROLS, ETC., TO OPERATE THE SYSTEM.5. AT THE COMPLETION OF THE CONSTRUCTION PROJECT, THIS CONTRACTOR IS RESPONSIBLE FORINSTALLATION OF AN IRRIGATION SYSTEM THROUGHOUT THE AREAS THAT WERE INVOLVED IN THE CONSTRUCTION.EQUIPMENT INSTALLED SHALL BE THE SAME AS THAT WHICH WAS REMOVED. OWNER WILL PROVIDE THE EQUIPMENTTHAT WAS REMOVED BACK TO THE CONTRACTOR. ANY ADDITIONAL EQUIPMENT REQUIRED WILL BE BY THECONTRACTOR.1. CONTRACTOR SHALL CONSULT ALL UTILITY COMPANIES AND VERIFY LOCATION OF ALLUNDERGROUND UTILITIES PRIOR TO DEMOLITION. REMOVAL AND RELOCATION OF ALL UTILITY LINES,METERS, VALVES, ETC. SHALL BE PERFORMED PER REQUIREMENTS OF THE CITY OF COPPELL &UTILITY COMPANIES. ANY DAMAGE TO PUBLIC UTILITIES SHALL BE THE GENERAL CONTRACTOR'SRESPONSIBILITY TO CORRECT.2. ALL DEMOLITION AND CONSTRUCTION TO BE KEPT WITHIN THE BOUNDARIES OF THE SITE OR ASDESIGNATED BY CONSTRUCTION ENGINEER. ANY DAMAGE BY CONTRACTOR TO ADJOININGPROPERTIES OR ITEMS NOT IN THE DESIGNATED DEMOLITION AREA SHALL BE THE GENERALCONTRACTOR'S RESPONSIBILITY TO CORRECT.3. REMOVE SURFACE PAVING AS NEEDED TO COMPLETE THE NEW PLAYGROUND.4. REMOVE EXISTING PLAYGROUND EQUIPMENT INCLUDING POSTS AND FOUNDATIONS, BARK AND EDGING.5. REMOVE ANY OTHER ITEMS NOT INDICATED ABOVE BUT WHICH MUST BE DEMOLISHED TO COMPLETENEW PLAYGROUND.6. REMOVE ALL EXCESS PEA GRAVEL NOT USED UNDER PLAYGROUND SLABS.DEMOLITION CONTRACTOR TO CONSULT WITH ENGINEER OROWNER ON SALVAGING AND RELOCATING PLAYGROUNDEQUIPMENT PRIOR TO REMOVING ITEM FROM THE SITE. TOWN CENTERELEMENTARY67'36'35'-6"45'-6"65'-6"37'EXISTINGCONCRETESIDEWALK(TO REMAIN)PROVIDE DURAPLAY RUBBER SURFACEOR APPROVED EQUAL ON ALL 3 SLABS.RUBBER SURFACE THICKNESSSHALL MEET OR EXCEED REQUIREDFALL ZONE PROTECTION.(BY OTHERS)ALL IRRIGATION REPAIRSWILL BE PROVIDE BY THESCHOOL DISTRICT.GAGA PIT TO BE RELOCATED BY THESCHOOL DISTRICT.PROVIDE NEW ADA COMPLIANT2 - 5 PLAYGROUND SLABPER SHEET C13SHADE STRUCTURE( BY OTHERS ) ANCORBOLTS SET BY CONCRETECONTRACTOR.EXISTINGCANOPY TOREMAINEXISTINGCANOPY TOREMAINEXISTINGCONCRETESIDEWALK(TO REMAIN)EXISTINGGAGA PIT TOREMAIN5.0'EXISTINGWALKINGTRACK TOREMAINSOD ALLDISTURB AREASMATCH FLUSHSOD ALLDISTURB AREASNEW CONCRETE SLABNEW CONCRETE SLAB59 LF OF 5' SIDEWALKADAACCESSIBLE ROUTETAPER RUBBERSURFACE TO BE ADACOMPLIANT. TAPER RUBBERSURFACE TO BE ADACOMPLIANT.34'-4"15.0'25.0'15' BUILDING SETBACK25' DRAINAGE AND UTILITY EASEMENTPROPERTY LINE EXISTING BENCHAND COVER(TO REMAIN)NEW CONCRETE SLABSOD ALLDISTURB AREAS26'-2"TOWN CENTER ELEMENTARY 185 N. HEARTZ ROADSITE PLANN PLAYGROUND EQUIPTMENT AND INSTALLATION NOTES1.PLAYGROUND EQUIPMENT INSTALLER WILL COORDINATE WITH CONCRETE SLAB CONTRACTOR ON SCHEDULE2.OF COMPLETION FOR INSTALLATION. PENDING WEATHER THE FIRST 2 PLAYGROUNDS WILL BE READY FOREQUIPMENT INSTALLATION 20 DAYS AFTER THE NOTICE TO PROCEED FOR BOTH PROJECTS.3.FURNISH AND INSTALL NEW TYPICAL ADA 2-5 PLAYGROUND EQUIPMENT PER BASIS OF DESIGN. .4.CONTRACTOR TO VERIFY EXISTING PAVEMENT ELEVATIONS PRIOR TO CONSTRUCTION.5.PROVIDE A ADA RAMP OR RUBBER RAMP TO TOP OF NEW RUBBER SURFACE.6.PROVIDE NEW RUBBER SURFACE PER SPECIFICATIONS. RUBBER SURFACE SHALL MEET ALL FALL ZONEREQUIREMENTS AND BE A MINIMUM OF 2" THICK.7.PLAYGROUND INSTALLER SHALL RESTORE ALL DAMAGED AREAS TO THE SITE BACK TO ITS ORIGINAL CONDITION.FILE LOCATION: D:\Public\Bob's Projects\COPPELL2\ELEM. PLAYGROUNDS\2023 CISD Playgrounds PAVING.DWG SAVED: 6/19/2024 8:28 PM PLOTTED:6/19/2024 10:41 PM ADDRESS: 200 S. DENTON TAP RD. COPPELL, TX 75019 Attn: CONTACT: The seal appearing on this document was authorized by Mike Glenn, P.E. 35059, on JANUARY 19, 2024C-9SGENERAL SITE NOTES1.PRIOR TO ANY CONSTRUCTION THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE CONTRACTDOCUMENTS AND SPECIFICATIONS, THE PLANS INCLUDING ALL NOTES, THE CITY OF COPPELL SPECIFICATIONSAND ANY OTHER APPLICABLE STANDARDS OR SPECIFICATIONS RELEVANT TO THE PROPER COMPLETION OF THEWORK SPECIFIED. FAILURE ON THE PART OF THE CONTRACTOR TO FAMILIARIZE HIMSELF WITH ALL STANDARDSOR SPECIFICATIONS PERTAINING TO THIS WORK SHALL IN NO WAY RELIEVE THE CONTRACTOR OFRESPONSIBILITY FOR PERFORMING THE WORK IN ACCORDANCE WITH ALL SUCH APPLICABLE STANDARDS ANDSPECIFICATIONS.2.CONTRACTOR SHALL HAVE IN HIS POSSESSION, PRIOR TO CONSTRUCTION, ALL NECESSARY PERMITS, LICENSES,ETC. CONTRACTOR SHALL HAVE AT LEAST ONE SET OF APPROVED ENGINEERING PLANS AND SPECIFICATIONSON-SITE AT ALL TIMES.3.ALL WORK SHALL CONFORM TO THE CITY OF COPPELL SPECIFICATIONS, STANDARDS, AND DETAILS.4.IF UNFORESEEN PROBLEMS OR CONFLICTS ARE ENCOUNTERED IN THE CONSTRUCTION, FOR WHICH ANIMMEDIATE SOLUTION IS NOT APPARENT, THE ENGINEER AND OWNER SHALL BE NOTIFIED IMMEDIATELY.5.IT WILL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO PROTECT ALL EXISTING PUBLIC AND PRIVATEUTILITIES THROUGHOUT THE CONSTRUCTION OF THIS PROJECT. CONTRACTOR SHALL CONTACT THEAPPROPRIATE UTILITY COMPANIES FOR LINE LOCATIONS, PRIOR TO COMMENCEMENT OF CONSTRUCTION ANDSHALL ASSUME FULL LIABILITY TO THOSE COMPANIES FOR ANY DAMAGES CAUSED TO THEIR FACILITIES.6.CONTRACTORS SHALL BE RESPONSIBLE FOR FIELD LOCATING EXISTING UTILITIES AND IMPROVEMENTS PRIOR TOCONSTRUCTION.GENERAL PAVING NOTES1.ALL SIDEWALKS SHALL BE 4-INCH REINFORCED CONCRETE W/ #3 BARS 16" O.C.E.W. AS PER DETAIL. ALL BARLAPS SHALL BE A THIRTY DIAMETER MINIMUM.2.ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF COPPELL STANDARD DETAILSAND SPECIFICATIONS.3.CONTRACTOR TO VERIFY EXISTING PAVEMENT ELEVATIONS PRIOR TO CONSTRUCTION.4.NEW PAVING INSTALLED SHALL "FLUSH-OUT" AT ANY JUNCTURE WITH EXISTING PAVING.5.BARRIER FREE RAMPS SHALL BE SUPPLIED BY PLAYGROUND MANUFACTURE.GENERAL GRADING AND DRAINAGE NOTES1.NEW CONCRETE PLAYGROUND SLABS SHALL BE INSTALL DEAD FLAT .2.CONTRACTOR SHALL BE RESPONSABLE FOR OBTAINING EXISTING TOPO, ALL EXISTING GRADES, SLOPES ANDELEVATIONS PRIOR TO CONSTRUCTION.3.CONTRACTOR SHALL PROVIDE DETAILED GRADING FOR EACH SITE. CONTRACTOR SHALL WORK WITH ENGINEERTO ESTABLISH POSITIVE GRADING AWAY FROM EACH NEW PLAYGROUND SLAB.4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND/OR ESTABLISH A BENCHMARK PRIOR TOCONSTRUCTION.5.NO GRADING SHALL BE PERFORMED IN AREAS WITH EXISTING TREES. CONTRACTOR TO MARK ALL EXISTINGTREES AND FENCE AREA SO THAT THEY CAN BE PROTECTED.6.ALL GRADING SHALL BE PER DETAIL BELOW.NOTE:CONTRACTOR SHALL RESTORE ANYDAMAGE TO THE SITE BACK TO ITSORIGINAL CONDITION.PAVING LEGENDPROPOSED 4" REINFORCED CONCRETE SIDEWALK,WITH #3 REBARS ON 14" CENTERS EACH WAY(NO SAND PERMITTED). ON 6" OF SUBGRADE COMPACTED TO A MINIMUMOF 95% OF IT'S MAXIMUM DRY DENSITY (STANDARD PROCTOR), AT A MOISTURE CONTENT OF AT LEAST+3 PERCENTAGE POINTS ABOVE OPTIMUM4000 psi MIN. COMPRESSIVE STRENGTH PLAYGROUND DETAILS ON-SITE SIDEWALKS CONCRETE SIDEWALKS SHALL BE A WIDTH AS DESIGNATED ON SITE PLAN AND A MINIMUM OF 4 INCHESTHICK, CONSTRUCTED OF 3,600 PSI, IN 28 DAYS CONCRETE WITH 4-6% ENTRAINED AIR AND REINFORCED WITH #4BARS AT 18" O.C.E.W. SUPPORTED WITH PROPER SUPPORT CHAIRS. EXPANSION JOINTS SHALL BE AT 60' MAXIMUMO.C. AND SAWCUT CONTRACTION JOINTS AT MAXIMUM 15' O.C.. ALL JOINTS TO BE CLEANED AND FILLED WITHHOT POURED RUBBER (GRAY) WITH #4 BARS AT 18" O.C.E.W. TOOLED CONSTRUCTION JOINTS SHALL BE 5'-0"O.C. ONE-HALF INCH EXPANSION JOINT SHALL BE PLACED EVERY 60 FEET AND WHERE NEW WORK ISCONSTRUCTED ADJACENT TO OTHER CONCRETE WORK (WALLS, FOUNDATION, CURB, ETC.). THE JOINTS SHALL BE FILLEDWITH 1/2-INCH PRE MOLDED GRAY BITUMINOUS EXPANSION JOINT FILLER AND SHALL EXTEND THE ENTIRE DEPTHAND WIDTH OF THE CONCRETE SECTION. FINISH OF SIDEWALKS SHALL BE WITH A BROOM FINISH PER ENGINEER. WALKS SHALL HAVE TOOLED CURBEDGES & TOOLED JOINTS. WALKS SHALL BE SAW CUT WITH ROUNDED.FINISHING FOR SLAB THE EXPOSED SURFACES OF SLAB SHALL HAVE A MONOLITHIC FINISH BY FLOATINGWITH A WOODEN FLAT UNTIL A SLIGHT EXCESS OF SAND APPEARS ON THE SURFACES. IN NO CASE SHALL THESURFACE BE LEFT SLICK OR WITH A GLOSSY FINISH. EXPOSED SURFACES OF SIDEWALKS SHALL HAVE AMONOLITHIC FINISH BY TRAWLING WITH A STEEL TROWEL AND BRUSHED LIGHTLY WITH AN APPROVED BROOM. THEEDGE OF ALL CONCRETE SHALL BE NEATLY ROUNDED TO THE REQUIRED RADII WITH AN EDGING TOOL.N.T.S.HARD SURFACE PLAY - PLAN VIEW#4 BARS @ 18" O.C.E.W.8"PLAYGROUND SLAB - DIMENSIONS VARYN.T.S.HARD SURFACE PLAY - SECTION VIEWRUBBER INFILL (BY OTHERS) EXISTING GROUNDEXISTING GROUND5" SLAB6" GRAVELCOMPACTED SUBGRADE8"1' - 0" 1' - 0"RUBBER INFILLGRADE SHALL BE 2" BELOW TOP OF PAVEMENT ( TYP )1.0'PAVEMENT SUB GRADE BELOW: THE SUBGRADE SHOULD THEN BE UNIFORMLY COMPACTED TO A MINIMUM OF 95 PERCENT OF ASTM D698 BETWEEN +1 TO +4PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT DETERMINED BY THAT TEST. IT SHOULD THEN BE PROTECTEDAND MAINTAINED IN A MOIST CONDITION UNTIL THE PAVEMENT IS PLACED. PAVEMENT SUBGRADES SHOULD BE GRADED TOPREVENT PONDING AND INFILTRATION OF EXCESSIVE MOISTURE ON OR ADJACENT TO THE PAVEMENT SUBGRADE SURFACE.DEAD LEVELNOTE: CONCRETE CONTRACTOR TOPROVIDE 250 LF OF 5' WIDE, 4" THICKCONCRETE SIDEWALK TO BEINSTALLED BY THE DIRECTION OFOWNER / ENGINEER.NOTES:1. ALL CONCRETE SLABS SHALL HAVE AMINIMUM COMPRESSIVE STRENGTH OF4000 PSI , 6.5 SACK AT 28 DAYS.2. ALL REINFORCING STEEL SHALLCONFORM TO ASTM A615, GRADE 60.3. GRAVEL BASE SHALL BE FLEX BASETxDOT ITEM 247, RECONSTITUTEDCONCRETE OR APPROVED EQUAL.GEOTEXTILE FABRIC - MIRAFI RS580i(OR APPROVED EQUAL)ROUNDED EDGE ( BY OTHERS)NOTE: CONCRETE CONTRACTOR SHALLHAVE 2 SLABS COMPLETE AND READYFOR PLAYGROUND INSTALLER 20 DAYSAFTER NOTICE TO PROCEED.NOTE:CONTRACTOR SHALL RESTORE ANYDAMAGE TO THE SITE BACK TO ITSORIGINAL CONDITION.FILE LOCATION: R:\COPPELL2\ELEM. PLAYGROUNDS\2023 CISD Playgrounds PAVING Details Sheets.DWG SAVED: 1/19/2024 1:38 PM PLOTTED:1/19/2024 2:57 PM ADDRESS: 200 S. DENTON TAP RD. COPPELL, TX 75019 Attn: CONTACT: The seal appearing on this document was authorized by Mike Glenn, P.E. 35059, on JANUARY 19, 2024C-133 6 . 0 ' - SW I N G S36.5' - K - 137.0' - 2 - 667.0' - SWINGS45.5' - K - 165.5' - 2 - 6 PAVING DETAILS FIRST POURSECOND POURT/2 T 1" 1"2"MIN.2"MIN.14" MIN.16" DOWEL COATING24" NO. 6 SMOOTH DOWELT/2 TNOTE:1.DOWELS AND REINFORCINGBARS SHALL BE SUPPORTEDBY AN APPROVED DEVICET/2 T T/4 CONSTRUCTION JOINT DETAIL (L)EXPANSION JOINT DETAILMAXIMUM SPACING = 60 FEETSAWED DUMMY JOINT DETAIL (T)MAXIMUM SPACING = 15 FEETVERTICAL SAWCUT18" TO 316" WIDE112" DEEP KEYWAYLAP BARS 30 DIA.AND TIEHOT POURED RUBBERJOINT SEALING COMPOUNDDOWEL SLEEVE (CLOSED END)TO FIT DOWEL AND BE SECUREDTO BE INSTALLED 2' C.-C.6" THICKNESS - #3 BARS ON 18" CTRS. BOTH WAYS7" & 8" THICKNESS - #3 BARS ON 16" CTRS. BOTH WAYS6" THICKNESS - #3 BARS ON 18"CTRS. BOTH WAYS7" & 8" THICKNESS - #3 BARS ON 16"CTRS. BOTH WAYSHOT POUREDRUBBER JOINTSEALINGCOMPOUND12" REDWOODLUMBERVERTICAL SAWCUT18" TO 316" WIDEHOT POURED RUBBERJOINT SEALING COMPOUND6" THICKNESS - #3 BARS ON 18" CTRS. BOTH WAYS7" & 8" THICKNESS - #3 BARS ON 16" CTRS. BOTH WAYSSUBBASE4"4"4"6"TOOL RADIUSALL EDGES#3 BARS @16" O.C.E.W.#3 BARS @ 18"SIDEWALK PLAN(RE: ALL NEW SIDEWEALKS)NTSPAVING SECTIONNTS1.AT MARKINGS THE CONCRETE SHALL BE CUT 34" DEEP, FOLLOWEDBY GROOVING TOOL. STRENGTH SHALL BE 3,600 p.s.i. WITH #3BARS @ 16" O.C.E.W.2.SIDEWALKS ADJACENT TO BUILDING TO BE PLACED ON 6"COMPACTED SUBGRADE THE SAME AS PAVING.RE: PAVING PLAN FOR PAVEMENTTHICKNESS (T)5'-0"VARIABLE5'-0"5'-0"50'-0" MAX. BETWEENEXPANSION JOINTSMARKST/2TRE: COMPACTED 95% FOR SUBGRADE TREATMENTAND THICKNESS3,600 PSI CONCRETE PAVINGWITH #3 BARS AT 16" O.C.E.W.JOINTS IN CONCRETE PAVINGSHALL NOT EXCEED 15 FT.B1A1A2PLAYGROUND SLAB TO SIDEWALK TYP. SECTION(RE: ADA ACCESS SIDEWALK CONNECTION) NTSB2NOTUSEDNTSPAVEMENT JOINT DETAILSNTSB3PLAYGROUND SLABFILE LOCATION: R:\COPPELL2\ELEM. PLAYGROUNDS\2023 CISD Playgrounds PAVING Details Sheets.DWG SAVED: 1/19/2024 1:38 PM PLOTTED:1/19/2024 2:57 PM ADDRESS: 200 S. DENTON TAP RD. COPPELL, TX 75019 Attn: CONTACT: The seal appearing on this document was authorized by Mike Glenn, P.E. 35059, on JANUARY 19, 2024C-14 SLAB DETAILS FILE LOCATION: R:\COPPELL2\ELEM. PLAYGROUNDS\2023 CISD Playgrounds PAVING Details Sheets.DWG SAVED: 1/19/2024 1:38 PM PLOTTED:1/19/2024 2:57 PM ADDRESS: 200 S. DENTON TAP RD. COPPELL, TX 75019 Attn: CONTACT: The seal appearing on this document was authorized by Mike Glenn, P.E. 35059, on JANUARY 19, 2024C-1565'-6"37'PROVIDE A 5.5' X 5.5' X 3' DEEPCONCRETE PAD AT EACH CANOPYCOLUMN W/ DBL. LAYER OF REINFORCING.(6, 2-6 SLAB, 4, PRE-K,TYPICAL)2-6 PLAYGROUNDSWINGSINSTALLANCHOR BOLTSFOR CANOPY(SUPPLIED BYOTHERS)TYP (4)PRE-K - 1PLAYGROUNDNOTE:REF. LEA PARK AND PLAYDRAWINGS FOR EXACTINTERIOR LEAVE-OUTSDIMENSIONS, SIZE, ETC.AND USA SHADEDRAWINGS FOR SHADEFOOTING DIMENSIONSAND LOCATION35'-6"45'-6"67'36'PROVIDE A 5.5' X 5.5' X 3' DEEPCONCRETE PAD AT EACH CANOPYCOLUMN W/ DBL. LAYER OF REINFORCING.(6, 2-6 SLAB, 4, PRE-K,TYPICAL)INSTALLANCHOR BOLTSFOR CANOPY(SUPPLIED BYOTHERS)TYP (4) 65' 37' 42'-1" 33' 36' 67' 13'-7" 13'-5" 62'-5" 35'-9" 32' 65'-1 1/2" 39'-9 1/2" 32'-1" POST PLAYERS DBLBELLS PTMT F/PB200203879 HARNESS 912358 QUANTUM II SPIRAL200203153 CLIMBER INV.AR. 200054572 NU-EDGE BIRCH CLIMBER 48”200203771 QUANTUM II SLIDE 200203308 GEAR PANEL200115331 6 ' BENCH W/ BACK INGROUND DIAMONDLTSG303D 6 ' BENCH W/ BACKINGROUND DIAMONDLTSG303D DBL WIDEPLASTIC SLIDE 200006977 ARCHED BRIDGEW/SAFETY RAILS 200201042 ARCHED BRIDGEW/SAFETY RAILS 200201042 ROCKY RAMBLER200200784 PODCLIMBER 200202438 LOOPCLIMBER 200061703 TRANSFERSTATION 200200767 FINGERMAZE PANEL 200054648 STEEL MELODYMAKER 200200150 TILTED ROCKWALL 200203061 SNAKE POLE200054585 HANGOUT200203187 POST WHEEL PLASTIC200203578 PB STEEL COUNTER PANEL200127049 LEG LIFT BAR200201312 3.5" 2 SEAT ARCH SWING W/AWLT0942 3.5" 2 SEAT ARCH SWING ADD-A-BAY W/AWLT0944 BELT SEAT200202835 BELT SEAT 200202835 BELT SEAT200202835 BELT SEAT 200202835 SOLO SPIN200201870 HIP30X40X10 PIH PSH049 JOINED HIP30X60X12 PIH PSH113 TRANSFER STATION200200767 SGL PLASTICWAVE SLIDE 200201026 PB TRAIL CLIMBER 56"200203462 WINDOW PANEL200054613 STEPPING STONES 200092985STEPPING STONES200092985SOLO POD200202887 2 UP HUB200202989 2 UP HUB 200202989 SOLO POD200202887 STEPPING STONES200092985 INFINITY HI-CLIMB200202302 POD CLIMBER200202607 HOOP ALLEY200202885 FLOATING POMMELS200202893 HOOP ALLEY200202885 FREESTANDINGSTEPLADDER 200202342 RISK MANAGEMENT SIGN ENGLISH787 3.5" 1 SEAT ARCH SWING ADD-A-BAY W/AWLT0948 3.5" 2 SEAT ARCH SWINGADD-A-BAY W/AW LT0944 3.5" 2 SEAT ARCH SWING ADD-A-BAY W/AWLT0944 BELT SEAT200202835 BELT SEAT200202835 BELT SEAT200202835 BELT SEAT200202835 INCLUSIVESEAT 200203433 114 114 130130 138 138 146 154 154 186 178 13.75 13.75 130 138 138 130 114 114 130 130138 130 122 130 130 186 178 130 146 130 146 138 130 130 AREA: PERIMETER: The information provided is for estimation purposes only. 205 ft 2413 ft² AREA: PERIMETER: The information provided is for estimation purposes only. 149 ft 1386 ft² AREA: PERIMETER: The information provided is for estimation purposes only. 203 ft 2404 ft² 12 12 12 168 16840 40 40 Req'd levelSitdown Area 4848 4848 56 72 96 This playground design meets the final Access Board Regulations.Compliance: Playground Layout Playground Safety CPSC Handbook for Public ASTM F1487 - Playground Equipment for Public Use. to the requirements of ASTM F1487.layout of these components conformplan are IPEMA certified.The use and The play components identified in this Drawn by: Date: DWG Name: LTCPS - Farmington 878 East Highway 60 Monett, Missouri 65708 Voice: 1-800-325-8828 Fax: 417-354-2273 Project: LTCPS rep: LEED points forthis structure Ground Space: Protective Area: lengths, i.e. 96 represents a 96 inch post.All post lengths are identified by text showing the post tripping or collision hazards (i.e. roots, rocks, borderplaystructure is shown. This zone is to be free of allThe minimum recommended fall zone around the entirearound all play equipment.Fall absorbing ground cover is required under andAll deck heights are measured from top of ground cover.existing play components.playground may be in compliance when consideringappropriate number of ground level events, the actualthe proposed Access Board Regulations in regards to theAlthough a particular playground design may not meetaccessible surfacing must be utilized in applicable areas.For playground equipment to be considered accessible,counsel to determine if the ADA applies to you.when viewed in its entirety. Please consult your legalthat you make your park and/or playground accessibleThe Americans with Disabilities Act (ADA) may require Supervision is required.Not all equipment may be appropriate for all children.8. 7. 6. 5. material, etc.). 4. 3. 2. 1. Age Group General Notes: 2-5yrs 2-12yrs5-12 yrs 13+ yrs 88'-6" x 76'-6" 106'-0" x 80'-0" Michael Perez (800) 237-7473 Lea Park & Play, Inc. Coppell, TX Standard Structure R0306_45272659847 Michael Perez 12/12/2023 1 Scale:1/10"=1'-0" 2' 1' 7' 4'10' 20' ELEVATED PLAY ACTIVITIES - TOTAL: ELEVATED PLAY ACTIVITIES ACCESIBLE BY TRANSFER: ELEVATED PLAY ACTIVITIES ACCESIBLE BY RAMP: GROUND LEVEL ACTIVITY TYPE: GROUND LEVEL QUANTITY: REQ'D REQ'D REQ'D REQ'D AGE GROUP:2-5 5 3 7 0 14 5 5 0 14 ELEVATED PLAY ACTIVITIES - TOTAL: ELEVATED PLAY ACTIVITIES ACCESIBLE BY TRANSFER: ELEVATED PLAY ACTIVITIES ACCESIBLE BY RAMP: GROUND LEVEL ACTIVITY TYPE: GROUND LEVEL QUANTITY: REQ'D REQ'D REQ'D REQ'D AGE GROUP:5-12 2 2 3 0 6 17 5 0 4 FABRIC www.usa-shade.com Copyright © 2019 by Shade Structures, Inc. All rights reserved Corporate Headquarters DFW International Commerce Park 2580 Esters Blvd, Suite 100 DFW Airport, Texas 75261 PH: 214.905.9500 TF: 800.966.5005 West Coast Office PH: 714.427.6981 Southeast Office PH: 214.905.9500 SHADESURE Our fabrics carry a 10-year limited manufacturer’s warranty from the date of installation against failure from significant fading, deterioration, breakdown, mildew, outdoor heat, cold, or discoloration, with the exceptions of Sunflower Yellow, Atomic Orange, Red, Mulberry, Electric Purple, Zesty Lime, Cinnamon, Olive, and Chocolate which carry a 5-year pro-rated warranty. Coolbrella shade structure fabrics carry a 3-year warranty. Should the fabric need to be replaced under the warranty, USA SHADE will manufacture and ship a new replacement fabric at no charge for the first six years, thereafter pro‐rated at 20% per year over the last four years. * Shadesure TM Red does not pass CPSC-CH-E1002-08.1. Contact your rep for more details. Lead & Phthalate Free* ATOMIC ORANGE SHADE 82%UV 94% RED SHADE 91%UV 92% MULBERRY SHADE 90% UV 91% ELECTRIC PURPLE SHADE 84% UV 90% ZESTY LIME SHADE 83%UV 92% CINNAMON SHADE 88%UV 93% OLIVE SHADE 93%UV 97% CHOCOLATE SHADE 92% UV 93% BLACK SHADE 95% UV 96% ARIZONA SHADE 86% UV 91% TERRACOTTA SHADE 84%UV 90% SUNFLOWER YELLOW SHADE 70% UV 94% NAVY BLUESHADE 90% UV 94% TURQUOISE SHADE 83% UV 92% RAINFOREST SHADE 89% UV 96% DESERT SAND SHADE 80% UV 92% LAGUNA BLUE SHADE 92%UV 96% ROYAL BLUE SHADE 86% UV 94% WHITE SHADE 57% UV 86% SILVER SHADE 88%UV 93% NFPA 701 Test Method 1 Test Method 2 ASTM E84 HEATPROTECTION UVPROTECTION HAILPROTECTION