Loading...
Phasing Plan with RedlinesRetail/ Rest. 2,100 sf 1.07 ac QSR 2,200 sf 0.80 AC QSR 1,800 sf 0.84 AC RETAIL 3,000 sf 0.64 AC FIRELANEFIRELANEFIRELANEFIRELANE FIRELANE FIRELANE FIRELANE FIRELANEFIRELANEF IRE LAN E ONEWAY DRIVETHRU DRIVETHRUONEWAYONEWAYFIRELANEFIRELANE FIRELANE FIRELANE FIRELANEFIRELANEFIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEDRIVETHRUFIRELANEFIRELANEFIRELANE FIRELANE FIRELANE FIRELANE FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEONEWAYDRIVETHRU DRIVETHRU DRIVETHRUONEWAYONEWAYRetail/ Restaurant 9,095 sf 1.70 ac Retail / Restaurant 16,780 sf 2.24 ac Retail/ Restaurant 16,510 sf 2.17 ac QSR 1,000 sf 0.99 ac 140 ROOMS 18,150 sf 2.96 acRetail/Restaurant 1 STORY 12,600 sf 1.89 ac Retail/Restaurant 8,400 sf 1.46 ac HOTEL PROPOSED BUILDING 1 18,167 SF LOT 8, BLOCK AFIRELANEFIRELANE FIRELANELPTPEDRIM=536.1'SDRIM=525.9'SDRIM=527.9'SDRIM=526.7'SDRIM=529.5'SDRIM=528.5'RIM=522.5'CONC. MONUMENTSSFL BOX" =517.7'SDRIM=525.9'SDRIM=527.9'SDRIM=526.7'SDRIM=529.5'SDRIM=528.5'RIM=522.5'SDRIM=533.7'SDRIM=529.1'ONLYONLYONLYONLYONLYONLYONLYONLYHACKBERRY ROAD(VARIABLE WIDTH ROW)BELTLINE ROAD (120' ROW, VOL. 4499, PAGE 159, D.R.D.C.T.)EAST DIVIDEND DRIVE(90' ROW, DOC.# 200900100537, O.P.R.D.C.T.)LOT 6, BLOCK A LOT 7, BLOCK A LOT 8, BLOCK A LOT 1, BLOCK A LOT 2, BLOCK A LOT 3, BLOCK A LOT 4, BLOCK A LOT 5, BLOCK A LOT 9, BLOCK A LOT 11, BLOCK A LOT 10, BLOCK A PHASE 2 PHASE 1 PHASE 2 PHASE 2 PHASE 1PHASE 1 1 OF 1 FILENAME: PHASING PLAN_VIC20008_Coppell.dwgPLOTTED BY: Ricky CarrenoFULL PATH: K:\Jobs\VIC20008_Coppell\Drawings\03 - Production - NEWK:\Jobs\VIC20008_Coppell\Drawings\03 - Production - NEW\PHASING PLAN_VIC20008_CoppellPLOTTED DATE: 9/16/20242911 TURTLE CREEK BLVD, STE 700 DALLAS, TX 75219 972-707-9555 SHEET:REV:DATE:DESCRIPTION:LOT 1-10, BLOCK ACITY OF COPPELLDALLAS COUNTY, TEXASKIRKMAN ENGINEERING, LLC 5200 STATE HIGHWAY 121 COLLEYVILLE, TX 76034 TEXAS FIRM NO. 15874 JOB NUMBER: ISSUE DATE: VIC20008 E N G I N E E R I N GVICTORY COPPELLJOHN D. GARDNER 138295 DATE: 06/29/2024 2/28/2023 PHASING PLAN GRAPHIC SCALE FEET012060 SCALE: 1" = 60'S BELTLINE RDPROJECT SITE HACKBERRY DRIVE RANCH TRAILLYNDON B JOHNSON FREEWAY EAST DIVIDEND DRIVE 635 VICINITY MAP N.T.S. LEGEND INFRASTRUCTURE PHASE PHASE 1 PHASE 2 BOUNDARY LINE * Fire lane easements and private fire hydrant system are required to be installed and preliminarily accepted by the City of Coppell prior to construction of buildings above foundations. 1 STORY? number of storys - your phase labels are blocking information/buildings. maybe it would be easier to make a table by lot # and add the phase # - add number of storys to each building - Salad and Go - Lot 5 has approved plans that are a little different in the lot shape and detail site plan. N can't make this out