Phasing Plan with RedlinesRetail/
Rest.
2,100 sf
1.07 ac
QSR
2,200 sf
0.80 AC QSR
1,800 sf
0.84 AC
RETAIL
3,000 sf
0.64 AC
FIRELANEFIRELANEFIRELANEFIRELANE FIRELANE FIRELANE FIRELANE
FIRELANEFIRELANEF
IRE
LAN
E
ONEWAY
DRIVETHRU DRIVETHRUONEWAYONEWAYFIRELANEFIRELANE FIRELANE FIRELANE FIRELANEFIRELANEFIRELANE
FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEDRIVETHRUFIRELANEFIRELANEFIRELANE FIRELANE FIRELANE FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEONEWAYDRIVETHRU DRIVETHRU DRIVETHRUONEWAYONEWAYRetail/
Restaurant
9,095 sf
1.70 ac Retail / Restaurant
16,780 sf
2.24 ac
Retail/
Restaurant
16,510 sf
2.17 ac
QSR
1,000 sf
0.99 ac
140 ROOMS
18,150 sf
2.96 acRetail/Restaurant
1 STORY
12,600 sf
1.89 ac
Retail/Restaurant
8,400 sf
1.46 ac
HOTEL
PROPOSED BUILDING 1
18,167 SF
LOT 8, BLOCK AFIRELANEFIRELANE
FIRELANELPTPEDRIM=536.1'SDRIM=525.9'SDRIM=527.9'SDRIM=526.7'SDRIM=529.5'SDRIM=528.5'RIM=522.5'CONC. MONUMENTSSFL BOX" =517.7'SDRIM=525.9'SDRIM=527.9'SDRIM=526.7'SDRIM=529.5'SDRIM=528.5'RIM=522.5'SDRIM=533.7'SDRIM=529.1'ONLYONLYONLYONLYONLYONLYONLYONLYHACKBERRY ROAD(VARIABLE WIDTH ROW)BELTLINE ROAD
(120' ROW, VOL. 4499, PAGE 159, D.R.D.C.T.)EAST DIVIDEND DRIVE(90' ROW, DOC.# 200900100537, O.P.R.D.C.T.)LOT 6, BLOCK A LOT 7, BLOCK A
LOT 8, BLOCK A
LOT 1, BLOCK A
LOT 2, BLOCK A
LOT 3, BLOCK A LOT 4, BLOCK A
LOT 5, BLOCK A
LOT 9, BLOCK A
LOT 11, BLOCK A
LOT 10, BLOCK A
PHASE 2
PHASE 1
PHASE 2
PHASE 2
PHASE 1PHASE 1
1 OF 1
FILENAME: PHASING PLAN_VIC20008_Coppell.dwgPLOTTED BY: Ricky CarrenoFULL PATH: K:\Jobs\VIC20008_Coppell\Drawings\03 - Production - NEWK:\Jobs\VIC20008_Coppell\Drawings\03 - Production - NEW\PHASING PLAN_VIC20008_CoppellPLOTTED DATE: 9/16/20242911 TURTLE CREEK
BLVD, STE 700
DALLAS, TX 75219
972-707-9555
SHEET:REV:DATE:DESCRIPTION:LOT 1-10, BLOCK ACITY OF COPPELLDALLAS COUNTY, TEXASKIRKMAN ENGINEERING, LLC
5200 STATE HIGHWAY 121
COLLEYVILLE, TX 76034
TEXAS FIRM NO. 15874
JOB NUMBER:
ISSUE DATE:
VIC20008
E N G I N E E R I N GVICTORY COPPELLJOHN D. GARDNER
138295
DATE: 06/29/2024
2/28/2023
PHASING
PLAN
GRAPHIC SCALE
FEET012060
SCALE: 1" = 60'S BELTLINE RDPROJECT SITE
HACKBERRY DRIVE
RANCH TRAILLYNDON B
JOHNSON
FREEWAY
EAST DIVIDEND DRIVE
635
VICINITY MAP
N.T.S.
LEGEND
INFRASTRUCTURE PHASE
PHASE 1
PHASE 2
BOUNDARY LINE
* Fire lane easements and private fire hydrant system are required to be
installed and preliminarily accepted by the City of Coppell prior to
construction of buildings above foundations.
1 STORY?
number of storys
- your phase labels are blocking
information/buildings. maybe it would be
easier to make a table by lot # and add
the phase #
- add number of storys to each building
- Salad and Go - Lot 5 has approved
plans that are a little different in the lot
shape and detail site plan.
N
can't make this out