Staff ReportITEM # 7
Page 1 of 3
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
Site Plan, Coppell Fire Station #3
P&Z HEARING DATE: February 19, 2026
STAFF REP.: Mary Paron-Boswell, AICP Senior Planner
LOCATION: 133 East Parkway Boulevard
SIZE OF AREA: A portion of Lot 2R, Block 1 (9.322 ac.)
CURRENT ZONING: TC (Town Center)
REQUEST: To approve a Site Plan to allow for an addition and renovation of the living quarters
portion of the building for Fire Station 3, located at 133 East Parkway Boulevard,
at the request of the City of Coppell, being represented by Ken Pope of PGAL, INC.
APPLICANT: Engineer: Owner’s Representative:
PGAL, Inc. City of Coppell
14135 Midway Rd. Suite G-200 265 E Parkway Blvd
Addison, TX 75001 Coppell, TX 75019
HISTORY: The original Site Plan and Final Plat for Fire Station #3 was approved in 1996. In
1999, a Site Plan Amendment was approved which permitted the construction of a
47-space parking lot just north of the Justice Center site, jointly used by the Coppell
Justice Center and the YMCA. In 2001, a Site Plan Amendment was approved
which allowed for a 775-sf addition and a 734-sf covered patio to the Coppell
Justice Center. In 2006, a Site Plan Amendment was approved to allow a 3,456-sf
expansion to the existing 7,728-sf Fire Station and an Amending Plat was approved.
The property was replatted in 2014, creating two lots, separating Town Center from
the Fire Station and Justice center.
HISTORIC COMMENT: This building has no historical significance.
TRANSPORTATION: Parkway Boulevard is a developed C4D, four-lane divided collector in an 88’-wide
right-of-way. The right-of-way of Veterans Way (previously Town Center
Boulevard) along the frontage of the proposed Fire Station #3 expansion is 66’-wide
with 66’-wide pavement width (including a 16’-wide median)
SURROUNDING LAND USE & ZONING:
North: Residential; SF-7 (Single-Family-7)
South: Coppell Justice Center; TC (Town Center)
ITEM # 7
Page 2 of 3
East: City Hall; TC (Town Center)
West: Commercial (CVS); TC (Town Center)
COMPREHENSIVE PLAN:
Coppell 2030, A Comprehensive Master Plan, shows this property as Mixed-Use
Community Center (without Residential) suitable for civic and institutional uses.
DISCUSSION: This request is to amend the existing Site Plan for an addition and renovation of
Fire Station 3. City Council approved the Request for Qualifications (RFQ) for
this project in September of 2025. The Fire Department will become compliant
with the National Fire Protection Association’s NFPA 1710, Standard for the
Organization and Deployment of Fire Suppression Operations, Emergency
Medical Operations, and Special Operations. The final impact will improve
service delivery and response times, as well as increase the health and safety for
personnel serving at Station 3.
Site Plan
The existing building east of the vehicle bays is proposed to be demolished, to be
replaced with new construction of 6,623-square feet, creating a total of 14,239-
square feet. The addition will expand the building to include private sleeping
quarters for fire personnel, including one for the Station Captain which includes a
private office. Other additions include:
• Air lock(s) between the living quarters and apparatus bays (positive pressure to
keep airborne diesel contaminates from entering).
• Restroom/shower facilities for personnel and one ADA accessible ½ bath near
the main station entrance for public.
• Kitchen/Dining Area,
• Living room,
• Fitness room,
• Watch office with computer workstations,
• Bunker gear storage room to accommodate 18 personnel,
• Laundry facilities,
• Decontamination room,
• Technology/infrastructure room,
• Medical supply closet,
• Complete building emergency back-up power generator (already provided).
There are 15 parking spaces, which are provided for the staff members proposed to
occupy the building. The fire apparatus will utilize the existing driveway on
ITEM # 7
Page 3 of 3
Veterans Way and Parkway Boulevard. A brick wall and landscaping will screen
the outdoor patio area being proposed adjacent to the building, facing the parking
lot.
Building Elevations & Signage
The building addition of 6,623-square feet will increase the total building size to
14,239 square feet. The new addition will be a combination of brown brick, beige
brick and CMU wainscoting. The materials will match the existing portion of the
building that is to remain. The eastern elevation will face the existing parking lot.
A station medallion will be placed on the side of the main door entrance which will
be the highest point of the building at 27’4”. The rest of the building will be 20’8-
1/2” in height. Aluminum letters will be placed on the building reading “COPPELL
FIRE DEPARTMENT STATION NO. 3”. The eastern portion of the site will also
house an outdoor patio area, screened with a wall and landscaping. The eastern and
northern elevations will have transom windows for additional light. The north
elevation will house the workout room and face Parkway Boulevard. This elevation
will also have the main entrance for civilians and a large “3”, for Fire Station No.
3. The western elevation will front Veterans Way and have four windows. The
area of signage proposed falls within the guidelines for signage.
Landscaping
The site sits at the corner of Parkway Boulevard and Veterans Way. The proposed
building addition extends towards Parkway Boulevard but still allowing for a
minimum 15-foot plus landscape buffer, which exceeds requirements. The building
addition along Veterans way also allows for a minimum 37-foot plus landscape
buffer. Three redbud trees are proposed along Veterans Way, along with two cedar
elms and a red oak along Parkway Boulevard, in addition to two existing trees.
Three additional red bud trees are proposed along the entry way to the front door
of the fire station. Additional plantings and ground cover line the entryway and
around the outdoor patio area. 22 needlepoint holly will be planted. The
landscaping to the south, surrounding the existing building will remain as is.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of the request with no outstanding conditions.
ALTERNATIVES:
1. Approval of the request
2. Denial of the request
3. Modification of the request
4. Take the case under advisement to a future date
ATTACHMENTS:
1. Detail Site Plan
2. Landscape Plan
3. Building Elevations & Signage
4. Addition Overview & Renderings