Loading...
CC approval on 10/11/05AGENDA REQUEST FORM COPPELL & DEP~: Planning DATE: October 11, 2005 ITEIV~ #: 16 ITEM CAPTION: Consider approval of the Denton Tap Development, Lot 3, Block A, Mifior Plat, to allow the construction of an approximate 11,700-square-foot day care facility on 1.68 acres of property located along the north side of Fitness Court, approximately 250-feet west of Denton Tap Road. GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve subject to condition 1 below M - Faught Vote - 7-0 4~s~c~ EXECUTIVE SUMMARY: Date of P&Z Meeting: September 15, 2005 Decision of P&Z Commission: Approval (6-0) with Commissioner~ Milosevich, Kittrell and Reese voting in favor. None opposed. Commi Approval is recommended, subject to the following condition: 1) Compliance with the attached Engineering comments. Staff recommends approval. Borchgardt, McCaffrey, Foreman, ~sion Hall left the meeting early. Agenda Request Form - Revised 09/04 ~ocument Name: ~5DTD, L3,BA,MP I-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Denton Tap Developmenh Lot 3~ B~ock A~ Minor Plat P & Z HEARING DATE: C.C. HEARING DATE: September 15, 2005 October 11, 2005 STAFF REP.: Matt Steer, City Planner LOCATION: Along the north side of Fitness Court, approximately 250-feet west of Denton Tap Road SIZE OF AREA: 1.68 acres of property CURRENT ZONING: C (Commercial) REQUEST: Minor Plat approval to allow the construction of a 15,020-square- foot day care facility APPLICANT: Mark Wainscott, Architect Head Conslruction, Inc. 3030 LBJ Freeway, Suite 700 Dallas, Texas 75234 (214) 722-7535 FAX (214) 722-7635 HISTORY: There has been no recent developme/3t history on the subject tract. TRANSPORTATION: Fitness Court is a local commercial street with variable right-of- way. Page 1 of 3 Item # 8 SURROUNDING LAND USE & ZONING: North - South East - West - Children's Courtyard & Market at Town Center; PD-178-C (Planned Development- 178-Corrqnercial) Ballet Academy under construction; PD-207-C (Planned Development-207-Commercial) & Taco Bell Restaurant; C (Commercial) Vacant Building (formerly Grandy's Restaurant), a Site Plan has been approved for Wachovi4 Bank; C (Commercial) Parking Lot for Everybody Fits gymnastics facility; C (Commercial) COMPREHENSIVE PLAN: The Comprehensive Plan of Mayi 1996 shows the property as suitable for neighborhood retail uses of which this use is acceptable. DISCUSSION: This is the companion piece to the zon: ng request for a Special Use Permit for a day care (Montessori Acade my). Two 24'-wide fire lanes will serve the building from the east and west sides. A 25'x25' utility easement is shown to cover the proposed, vaterline connection. This is a straightforward case, and only minor revk,.ions need to be made. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of this re~tuest, subject to the following conditions: 4. 5. 6. Remove the phone number~ from the utility company signature blocks. Ensure the phone and fax tumbers of the applicant and architect are correct. Include curve data table. Label all easements. Include the standard dedicatio:t verbiage. Compliance with the attached Engineering comments. ALTERNATIVES 1) 2) 3) Page 2 of 3 Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Item# 8 ATTACHMENT $: 1) Minor Plat 2) Engineering Comments Page 3 of 3 Item# 8 COPPELL Project ID MP~05-0038 Address 136 Fitness Ct CITY OF COPPELE 2nd DRC REPORT Proiect Name COPPELL Denton Tap Development, Lot 3, Block A Proiect Type Ao[~lication Date Case Manager Project Description Minor Plat 8/16/2005 Matt Steer To allow the construction of a 15,020 day care facility on 1.68 acres of property ¥cated on the south side of Fitness Court, west of Denton Tap A.qenc¥ Engineering 1 of 1 Comments 1. Include offsite drainage areas that affect the site How and where are these drainage areas drained? Be advised that the property to th~ east is being re-developed and has been being re-platted i 2. The ~ocation and configuration of the proposed f~re hydrant and utilities wiJl need to be revised. A second fire hydrant will be required on the site. Additional comments will be generated upon detailed engineering review. I