CC approval on 10/11/05AGENDA REQUEST FORM
COPPELL
&
DEP~: Planning
DATE: October 11, 2005
ITEIV~ #: 16
ITEM CAPTION:
Consider approval of the Denton Tap Development, Lot 3, Block A, Mifior Plat, to allow the construction of an
approximate 11,700-square-foot day care facility on 1.68 acres of property located along the north side of Fitness
Court, approximately 250-feet west of Denton Tap Road.
GOAL(S):
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
Motion to Approve subject
to condition 1 below
M - Faught
Vote - 7-0 4~s~c~
EXECUTIVE SUMMARY:
Date of P&Z Meeting: September 15, 2005
Decision of P&Z Commission: Approval (6-0) with Commissioner~
Milosevich, Kittrell and Reese voting in favor. None opposed. Commi
Approval is recommended, subject to the following condition:
1) Compliance with the attached Engineering comments.
Staff recommends approval.
Borchgardt, McCaffrey, Foreman,
~sion Hall left the meeting early.
Agenda Request Form - Revised 09/04
~ocument Name: ~5DTD, L3,BA,MP I-AR
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Denton Tap Developmenh Lot 3~ B~ock A~ Minor Plat
P & Z HEARING DATE:
C.C. HEARING DATE:
September 15, 2005
October 11, 2005
STAFF REP.:
Matt Steer, City Planner
LOCATION:
Along the north side of Fitness Court, approximately 250-feet
west of Denton Tap Road
SIZE OF AREA:
1.68 acres of property
CURRENT ZONING:
C (Commercial)
REQUEST:
Minor Plat approval to allow the construction of a 15,020-square-
foot day care facility
APPLICANT:
Mark Wainscott, Architect
Head Conslruction, Inc.
3030 LBJ Freeway, Suite 700
Dallas, Texas 75234
(214) 722-7535
FAX (214) 722-7635
HISTORY:
There has been no recent developme/3t history on the subject tract.
TRANSPORTATION:
Fitness Court is a local commercial street with variable right-of-
way.
Page 1 of 3
Item # 8
SURROUNDING LAND USE & ZONING:
North -
South
East -
West -
Children's Courtyard & Market at Town Center; PD-178-C
(Planned Development- 178-Corrqnercial)
Ballet Academy under construction; PD-207-C (Planned
Development-207-Commercial) & Taco Bell Restaurant; C
(Commercial)
Vacant Building (formerly Grandy's Restaurant), a Site Plan
has been approved for Wachovi4 Bank; C (Commercial)
Parking Lot for Everybody Fits gymnastics facility; C
(Commercial)
COMPREHENSIVE PLAN: The Comprehensive Plan of Mayi 1996 shows the property as
suitable for neighborhood retail uses of which this use is
acceptable.
DISCUSSION:
This is the companion piece to the zon: ng request for a Special Use
Permit for a day care (Montessori Acade my). Two 24'-wide fire lanes
will serve the building from the east and west sides. A 25'x25' utility
easement is shown to cover the proposed, vaterline connection. This is a
straightforward case, and only minor revk,.ions need to be made.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends APPROVAL of this re~tuest, subject to the following
conditions:
4.
5.
6.
Remove the phone number~ from the utility company
signature blocks.
Ensure the phone and fax tumbers of the applicant and
architect are correct.
Include curve data table.
Label all easements.
Include the standard dedicatio:t verbiage.
Compliance with the attached Engineering comments.
ALTERNATIVES
1)
2)
3)
Page 2 of 3
Recommend approval of the request
Recommend disapproval of the request
Recommend modification of the request
Item# 8
ATTACHMENT $:
1) Minor Plat
2) Engineering Comments
Page 3 of 3
Item# 8
COPPELL
Project ID MP~05-0038
Address 136 Fitness Ct
CITY OF COPPELE
2nd DRC REPORT
Proiect Name
COPPELL
Denton Tap Development, Lot 3, Block A
Proiect Type
Ao[~lication Date
Case Manager
Project Description
Minor Plat
8/16/2005
Matt Steer
To allow the construction of a 15,020 day care facility on 1.68 acres of property ¥cated on the south side of Fitness
Court, west of Denton Tap
A.qenc¥
Engineering
1 of 1
Comments
1. Include offsite drainage areas that affect the site How and where are these drainage areas
drained? Be advised that the property to th~ east is being re-developed and has been
being
re-platted i
2. The ~ocation and configuration of the proposed f~re hydrant and utilities wiJl need to be
revised. A second fire hydrant will be required on the site. Additional comments will be
generated upon detailed engineering review.