Loading...
P&Z letter of approval-9/15/05COl'FELL September 15, 2005 Mr. Mark Wainscott, Architect Head Construction, Inc. 3030 LBJ Freeway, Suite 700 Dallas, TX 75234 RE: Denton Tap Developmenh Lot 3~ Block Al Minor Plat Dear Mark: This letter is to inform you that the Denton Tap Development, Lot i3, Block A, Minor Plat, to allow the construction of an approximate 11,700-square-foot day care facility on ~.68~ acres of property located along the north side of Fitness Court, approximately 250-feet west of Denton Tapi Road, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, September 15, 2005, subject to the following conditions: 1) Remove the phone numbers from the utility company signature blocks. 2) Ensure the phone and fax numbers of the applicant and architect are correct. 3) Include curve data table. 4) Label all easements. 5) Include the standard dedication verbiage. 6) Compliance with the attached Engineering comments. The date scheduled for consideration by the Coppell City Council is Tuesday, October 11, 2005, at 7 p.m. A representative for this case must be present at this meeting, which will be !held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this applicatio*. City Council has instructed staff to include in its agenda packets only those items that accurately reflect condftions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department two (2) folded copies of the revised Minor Plat on or before 12 noon~ Wednesda¥~ September 28 . Also, please submit one (1) 8 72 x 11 paper reduction, along with one jpg, tiff, pdf or similar electronic file. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, Marcie"-Diamond Assistant Director of Planning Cc Building Inspection file /OF'FELL Pr~oject ID_ MP.05 0038 Address 136 F~tness Ct CITY OF GOPPEIFL 2nd DRC REPOR'¥ P~r_o jec] NaF}e COP'PELL PI oject '~pe ~plication Date Case ManaFler Proiect Description 8/!6/2008 Matt Steer ~ency Engineenng 1 of Comment~ 1 include offsite drainage areas that affect the sile How and where are these drainage areas being drained? Be advised that the property to the east is being re-developed and has been re-platted 2 The location and configuration of the proposedjfire hydrant and utilities will need to be revised A second fire hydrant will be required onithe site Additional comments will be generated upon detailed engineering rewew