Loading...
DRC commentsCC)FFF__,LL Project ID MP-05-0038 .Address 138 Fitness Ct CiTY OF COPPELL DRC REPORT Project Name COFFELL Denton Tap Development, Lot 3, Block A Proiect Type Application Date Case ManaRer Project Description Minor Plat 8/16/2005 Matt Steer To allow the construction of a 15,020 day care facility on 1,68 acres of property located on the south side of Fitness Court, west of Denton Tap Agency Building Inspection Electric and Gas Engineering 1 of 1 Reviewed By Review Date Greg Jones 8/18/2005 Jeff Curry 8/26/2005 Charlene La Mattina 8/23/2005 Fire Administration Tim Oates 8/23/2005 Parks and Recreation John Elias 8/23/2005 Planning Department Matt Steer 8/25/2005 1. No con~ments made on plat. No comments received. 1. Show tl~e "25' x 25' Utility Easement" on the plat as it is showri in the Civil Drawings. The DDC should be located in ithe utility easement. 2. Jnclude!offsite drainage areas that affect the site. Be advised t~at the property to the east is being re-develolped. 3. Will there be any fire hydrants or FDC's on the site? No comments regarding Plat. No comments. 1. Chang~ scale bar to reflect 1" = 20'. 2. Show Ii,nits of various segments within the east fire lane easement. 3. Depict i]ll existing and proposed easements. 4. Change TXU gas to Atmos and TXU Electric to TXU Electric D!elivery. 5. IncreaSe boldness of Point of Beginning within the Owner's Certificate. 6. Include 2nd half of the owner's certificate. 7. Show Floodplain Administrator on the same line. 8. Fill in olwneddeveloper information on bottom right corner. 9. Include "Vol. Page "on the bottom right corner oflPlat. COPPELL C(T¥ COPPELL 2nd DRC REPORT COPPELL ProjectlD MP~05-0088 Address 136 Fitness Ct Project N~mff Denton Tap Development, Lot 3, Block A Project Type Application Date Case Manager Project Description Minor Plat 8/16/2005 Matt Steer To allow the construction of a 15,020 day care facility on 1 68 acres of property located on the south side of Fitness Court, west of Denton Tap Agency Engineering 1 of 1 Comments 1. Include offsite drainage areas that affect the site. How and where are these drainage areas being drained? Be advised that the property to the east is being re-developed and has been re-pJatted. 2 The location and configuration of the proposed f!re hydrant and utilities will need to be revised. A second fire hydrant will be required on the site. Additional comments will be generated upon detailed engineering review.