Loading...
First Baptist-CS 930928AGENDA CITY COUNCIL ~G AGENDA REQUEST FORM Sen. t~mh~r ~R: ITEM NUMBER ITEM CAPTION: Consideration of approving a variance to the Subdivision Ordinance (Appendix A, Section I, item D.j, page 21), to allow 5" thick concrete pavement in the parking lot of First Baptist Church, at the church's request. SUBMIttED EVALUATION OF ITEM: STAFF REP.: Gnrv I,_ DilN~ctor of pInnnhl~ O~R ~.: DA~: See attached letter from First Baptist and the accompanying engineering report, f ~ ~t~ ~.-, ~ ,.~ ..... ~/...~,~_'r~ COMMENT~ LEGAL REVIEW BY: AGENDA REQUEST FORM REVISED 2/93 REVIEWED BY CM'-~-~ Wm. A. "Bill" Harrel Minister of Education & Administration September 16, 1993 Gary Sieb, Planning Director City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Variance request on parking lot construction Dear Gary: Enclosed is a parking lot site plan for proposed new construction at our church. This project entails the replacement ora portion of an asphalt parking area with concrete and the addition of approximately 60 new parking spaces. Also enclosed is an engineering report from Gee Consultants, Inc., regarding lime stabilization. Please accept this letter as a request for a variance to city codes to permit a concrete thickness of 5 inches as compared to 6 inches in the parking area. This area will be used primarily for cars and light trucks. It will be constructed with 3,000 psi concrete with number three rebar on 18 inch centers, with lime stabilization to a depth of 6 inches with a 4% hydrated lime mix. The fire lanes will be constructed with a concrete thickness of six inches. Should this request need to go before the City Council, I would appreciate being placed on the agenda as early as possible. Thank you in advance for your assistance. You may reach me at 462-1643 with any questions or comments. We will apply for appropriate city permits after the disposition of this request. Sincerely, Wm. A. "Bill" Harrel Business Administrator p.o. box 109 - coppell, texas 75019 - 214-462-1643 EOTECHNICAL E NGINEERING E ] NVIRONMENTAL GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 ° (214) 620-9791 ° Fax (214) 620-9794 September 1, 1993 Mr. Bill Harrell First Baptist Church of Coppell 590 S. Denton Tap Road Coppell, Texas 75019 Re: Project No. F-93-0106 Lime Series Test Results First Baptist Church of Coppell Coppell, Texas Dear Mr. Harrell: In accordance with your request, a representative of GEE Consultants, Inc. obtained seven (7) samples of the near surface soil materials at the proposed pavement subgrade areas at the above referenced project on August 25, 1993. The purgose of obtaining these samples w~ to determine the amount, of lime required to stabilize the subgrade soils prior to pavement construction. The samples were transported to the laboratory and classification tests were performed. The test results are as follows: Sample No.: Sample Location: Sample Description Liquid Limit: Plastic Limit: Plasticity Index: Percent Passing No. 200 Sieve: 1 50' S. and 27' E. of S.W. Comer of Building Dark brown sandy clay 30 13 17 57 First Baptist Church of Coppell Sample No.: Sample I.x~cation: Sample Description: Liquid Limit: Plastic Limit: Plasticity Index: Percent Passing No. 200 Sieve: Sample No.: Sample Location: Sample Description: Liquid Limit: Plastic Limit: Plasticity Index: Percent Passing No. 200 Sieve: Sep~mb~r It 1993 Sample No.: Sample Location: Sample Description: Liquid Limit: Plastic Limit: Plasticity Index: 2 50' S. and 21' E. of S.E. Comer of Building Dark gray sandy clay 31 12 19 59 Percent Passing No. 200 Sieve: 3 90' E. and 120' S. of N.E. Comer of Building Dark gray sandy clay 29 10 19 52 Sample No.: Sample Location: Sample Description: Liquid Limit: · Plastic Limit: Plasticity Index: 4 85' E. and 3' S. of N.E. Comer of Building Dark brown sandy clay with occasional asphalt fragments 29 12 17 42 Percent Passing No. 200 Sieve: 5 45' E. and 36' N. of N.E. Comer of Building Brown sandy clay 26 10 16 45 Sample No.: Sample Location: Sample Description: Liquid Limit: Plastic Limit: Plasticity Index: Percent Passing No. 200 Sieve: 6 36' N. and 15' W. of N.E. Comer of Building Yellowish brown and brown sandy clay 25 6 19 49 GI~ Consultants, Inc. Project No. F-93-0106 Page 2 F'wst Baotist Church of Coppell Sample No.: Sample Location: Sample Description: Liquid Limit: Plastic Limit: Plasticity Index: Percent Passing No. 200 Sieve: September 1~ 1993 7 30' N. and 81' W. of N.E. Comer of Building Yellowish brown and brown sandy clay 24 8 16 48 The results of the lime series tests performed on the subgmde soil with the highest plasticity index are as follows: SAMPLE NO. 2 Percent of Lime Liquid Limit Plasticity Index (by dry weigh0 (%) (%) 0 31 19 2 31 7 4 33 6 6 32 7 Based on the aforementioned test results, it is recommended that four (4) percent hydrated lime by dry weight be used to stabilize the subgrade softs within the area of the proposed pavement. Four (4) percent hydrated lime by dry weight would be equivalent to approximately 18 pounds per square yard, for a six (6) thick stabilized layer. The lime stabilization should be performed in accordance with the Texas State Department of Highways and Public Transportation Specifications and applicable city codes. We trust the information submitted herein is sufficiently detailed for your use. If you should have any questions or comments, please do not hesitate to contact us at your convenience. We appreciate your contacting us for this project. GEE Consultants, Inc. ~;~-~ ~r ~ ~ ~ President RWG/bf GEE Consultants, Inc. Project No. F-93-0106 Pnge 3