First Baptist-CS 930928AGENDA
CITY COUNCIL ~G
AGENDA REQUEST FORM
Sen. t~mh~r ~R:
ITEM NUMBER
ITEM CAPTION:
Consideration of approving a variance to the Subdivision Ordinance (Appendix A, Section I, item D.j,
page 21), to allow 5" thick concrete pavement in the parking lot of First Baptist Church, at the church's
request.
SUBMIttED
EVALUATION OF ITEM:
STAFF REP.: Gnrv I,_
DilN~ctor of pInnnhl~
O~R ~.:
DA~:
See attached letter from First Baptist and the accompanying engineering report, f ~ ~t~
~.-, ~ ,.~ ..... ~/...~,~_'r~
COMMENT~
LEGAL REVIEW BY:
AGENDA REQUEST FORM REVISED 2/93
REVIEWED BY CM'-~-~
Wm. A. "Bill" Harrel
Minister of Education & Administration
September 16, 1993
Gary Sieb, Planning Director
City of Coppell
255 Parkway Blvd.
Coppell, TX 75019
Re: Variance request on parking lot construction
Dear Gary:
Enclosed is a parking lot site plan for proposed new construction at our church. This project
entails the replacement ora portion of an asphalt parking area with concrete and the addition of
approximately 60 new parking spaces. Also enclosed is an engineering report from Gee
Consultants, Inc., regarding lime stabilization.
Please accept this letter as a request for a variance to city codes to permit a concrete thickness
of 5 inches as compared to 6 inches in the parking area. This area will be used primarily for cars
and light trucks. It will be constructed with 3,000 psi concrete with number three rebar on 18
inch centers, with lime stabilization to a depth of 6 inches with a 4% hydrated lime mix. The
fire lanes will be constructed with a concrete thickness of six inches.
Should this request need to go before the City Council, I would appreciate being placed on the
agenda as early as possible.
Thank you in advance for your assistance. You may reach me at 462-1643 with any questions
or comments. We will apply for appropriate city permits after the disposition of this request.
Sincerely,
Wm. A. "Bill" Harrel
Business Administrator
p.o. box 109 - coppell, texas 75019 - 214-462-1643
EOTECHNICAL
E NGINEERING
E ] NVIRONMENTAL
GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 ° (214) 620-9791 ° Fax (214) 620-9794
September 1, 1993
Mr. Bill Harrell
First Baptist Church of Coppell
590 S. Denton Tap Road
Coppell, Texas 75019
Re:
Project No. F-93-0106
Lime Series Test Results
First Baptist Church of Coppell
Coppell, Texas
Dear Mr. Harrell:
In accordance with your request, a representative of GEE Consultants, Inc. obtained seven (7)
samples of the near surface soil materials at the proposed pavement subgrade areas at the above
referenced project on August 25, 1993.
The purgose of obtaining these samples w~ to determine the amount, of lime required to stabilize
the subgrade soils prior to pavement construction. The samples were transported to the
laboratory and classification tests were performed. The test results are as follows:
Sample No.:
Sample Location:
Sample Description
Liquid Limit:
Plastic Limit:
Plasticity Index:
Percent Passing No. 200 Sieve:
1
50' S. and 27' E. of S.W. Comer of Building
Dark brown sandy clay
30
13
17
57
First Baptist Church of Coppell
Sample No.:
Sample I.x~cation:
Sample Description:
Liquid Limit:
Plastic Limit:
Plasticity Index:
Percent Passing No. 200 Sieve:
Sample No.:
Sample Location:
Sample Description:
Liquid Limit:
Plastic Limit:
Plasticity Index:
Percent Passing No. 200 Sieve:
Sep~mb~r It 1993
Sample No.:
Sample Location:
Sample Description:
Liquid Limit:
Plastic Limit:
Plasticity Index:
2
50' S. and 21' E. of S.E. Comer of Building
Dark gray sandy clay
31
12
19
59
Percent Passing No. 200 Sieve:
3
90' E. and 120' S. of N.E. Comer of Building
Dark gray sandy clay
29
10
19
52
Sample No.:
Sample Location:
Sample Description:
Liquid Limit:
· Plastic Limit:
Plasticity Index:
4
85' E. and 3' S. of N.E. Comer of Building
Dark brown sandy clay with occasional asphalt
fragments
29
12
17
42
Percent Passing No. 200 Sieve:
5
45' E. and 36' N. of N.E. Comer of Building
Brown sandy clay
26
10
16
45
Sample No.:
Sample Location:
Sample Description:
Liquid Limit:
Plastic Limit:
Plasticity Index:
Percent Passing No. 200 Sieve:
6
36' N. and 15' W. of N.E. Comer of Building
Yellowish brown and brown sandy clay
25
6
19
49
GI~ Consultants, Inc.
Project No. F-93-0106
Page 2
F'wst Baotist Church of Coppell
Sample No.:
Sample Location:
Sample Description:
Liquid Limit:
Plastic Limit:
Plasticity Index:
Percent Passing No. 200 Sieve:
September 1~ 1993
7
30' N. and 81' W. of N.E. Comer of Building
Yellowish brown and brown sandy clay
24
8
16
48
The results of the lime series tests performed on the subgmde soil with the highest plasticity
index are as follows:
SAMPLE NO. 2
Percent of Lime Liquid Limit Plasticity Index
(by dry weigh0 (%) (%)
0 31 19
2 31 7
4 33 6
6 32 7
Based on the aforementioned test results, it is recommended that four (4) percent hydrated lime
by dry weight be used to stabilize the subgrade softs within the area of the proposed pavement.
Four (4) percent hydrated lime by dry weight would be equivalent to approximately 18 pounds
per square yard, for a six (6) thick stabilized layer. The lime stabilization should be performed
in accordance with the Texas State Department of Highways and Public Transportation
Specifications and applicable city codes.
We trust the information submitted herein is sufficiently detailed for your use. If you should
have any questions or comments, please do not hesitate to contact us at your convenience.
We appreciate your contacting us for this project.
GEE Consultants, Inc.
~;~-~ ~r ~ ~ ~
President
RWG/bf
GEE Consultants, Inc. Project No. F-93-0106
Pnge 3