Loading...
P&Z 3/21/96 approval ltr. Coppell, Texas 75019 ~~TP~Oe' BCO~ty478With A Beautiful FutureCOppell, Texas 75019 214-462-0022 March 25, 1996 Catellus Development Corp. 4545 Fuller Drive, #100 living, TX 75038 RE: Gateway Business Park. Replat of Block 1 {Fritz Companies. Inc.) Dear Sir/Madam: This letter is to inform you that your request for approval of Gateway Business Park, Replat of Block 1 (Fritz Companies, Inc.), to create two new lots that will allow the development of a 307,872 square foot office warehouse distribution facility and a 169,444 square foot office warehouse building, located on the southwest corner of Freeport Parkway and Gateway Boulevard, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, March 21, 1996. The following conditions apply: (1) Compliance with Engineering comments (copy attached); (2) signature block reflect the Mayor, the Planning and Zoning Chairman, and the City Secretary; (3) identification of landscaping planting materials, and (4) subject to a parking special exception being granted on Lots 1 and 2 by the Board of Adjustment. The date scheduled for consideration by the Coppell City Council is Tuesday, April 9, 1996, at 7:30 p.m. A representative for this case must be present at this meeting. Failure to represent this item may result in the denial of this application. Sincerely, Pert Virtanen Assistant Director of Planning & Community Services cc: Jim Riley, Brockette/Davis/Drake Isabelle Moro, P&Z Coordinator Building Inspection DEVELOPMENT REVIEW COMMI'I TEE ENGINEERING COMMENTS ITEM: Gateway Business Park. Replat of Block I (Fritz Comtnmies. Inc.}. to create two new lots that will arrow the development of a 307,872 square foot office warehouse distrib;:~on facility and a 169,~?.~. square foot offie warehouse building, located on the southwest comer of Freeport Pkwy. and Gateway Blvd., at the request of Brockette/Davis/Drake, Inc. DRC DATE: February 29, 1996 and March 7, 1996 CONTACT: Ken Grifftn, P.E., Assistant City Manager/City Engineer 0o4-3679) PRELIMINARY REVISED AFTER P&Z Replat Comments 1. Show the zoning of adjacent properties. 2. Impact fees required. Block 1, Lot 1 Preliminary Site Plan 1. The intersection of Cotton road and Gateway Blvd. is a 3 leg intersection and not a 4 leg intersection as shown on Sheet L1.01 and Al.01., 2. Impact fees are required to be paid prior to final plat approval. 3. You should begin your driveway radius 20' from the inlet box. 4. Provide water and sanitary sewer plans. 5. Show the curb return radius. A larger radius should be provided for the truck court areas. 6. Show driveway widths. 7. Label fire lanes. Landscape/Irrigation Plan 1. Landscaping and irrigations plans should show the correct driveway layout at the northeast corner of the development. Block 1, Lot 2 Preliminary Site Plan 1. You should begin your driveway radius 20' from the inlet box. 2. Provide water and sanitary sewer plans.