Explanation of CC apprvl. ltr.From:
To:
Date:
Subject:
Gary Sieb
David C, Barker
11/11/2003 8:24:41 AM
Re: 660 Fritz Drive South Fence Approval
NOV i
David: When the Site Plan Amendment went to Council, your representative had agreed to a condition
which stated "Provide a landscaped decorative metal security fence with 18" minimum width stone
columns placed a minimum of 20 feet apart, on the south side. Provide a matching decorative metal
gate."
In submitting the approval letter to Abstract we did not repeat that condition because:
1 ) it had been agreed to
2) it was discussed at the Council public hearing
3) it was a condition of approvat
As I had indicated to you in an earlier conversation, you can construct one or both guardhouses at this
time, as welt as the decorative metal fencing on the south side of the building. One thing to keep in mind
is the fact that site plan approval is good for a maximum of two years. If you have not completed all
improvements approved by the Council within that time frame (October 13, 2005), you would be required
to reapply for site plan approval.
Sorry for any questions our approval letter raised and I trust the above stated information clarifies this
issue.
From:
To:
Date:
Subject:
"Barker, David C." <DCBarker(~ups-scs.com>
<gsieb@ci.coppell.tx.us>
1111012003 7:12:34 PM
660 Fritz Drive South Fence Approval
Gary:
Last week, I received the official City of Coppell acceptance letter, from
Abstract Construction, regarding our proposed south fence and guardhouses
(please see attachment). Curiously, it stated that our request for a
"chain-link" security fence had been approved. Is this accurate, or is it
just a misprint?
<<City of Coppell Approval.pdf>>
Thank you,
David C. Barker, MS, MBA
Southwest Area Facilities Engineer
UPS Supply Chain Solutions, Inc.
2275 E. Newlands Dr.
Femley, NV 89408-8908
Office: (775) 575-3732
Cell: (775) 287-8497
Fax: (775) 575-3795
dcbarker@ups-scs.com
COPPELL
October 15, 2003
Sheri Ablett/Perry Pitman
Abstract Construction
1157 Ables Lane
Dallas, TX 75229
RE: Gateway Business Park. Lot 1. Block 1~ Site Plan .~-~---~r~¢ne (UP~
Suoolv Clmh
Dear Ms. Abler and Mr. Pimmn:
This leV. er is to inform you that thc Oatewav Business Park. Lot 1. Block 1, Site
Plan Amendm~t (UPS Sum~lv Chain gahMnnsL to amend thc Site Plan to allow
for two guardhouses ami perimeter chain-link scc~--~ fencing; wilh landscaping, on
17.8 acres ofpropen'y located at 660-Fn'itz~)ri~, was approved by thc Coppell ciw
Council on Tuesday, October 14, 2003, with no conditions.
If you have any questions, please contact the Planning Department at (972) 304-
3678.
Sincerely,
l~ire~tor of Planning
Cc Building Inspection
file