P&Z apprv'l ltr. on 9/18/03T H E C I T Y 0 F
COPPELL
September 19, 2003
Sheri Ablett/Perry Pitman
Abstract Construction
1157 Ables Lane
Dallas, TX 75229
RE: Gateway Business Park~ Lot 1, Block 1~ Site Plan Amendment (UPS Supply Chain
Solutions)
Dear Ms. Ablett and Mr. Pitman:
This letter is to inform you that the Gateway Business Park, Lot 1, Block 1, Site Plan Amendment
£UPS Supply Chain Solutions), to amend the Site Plan to allow tbr two guardhouses and perimeter
chain-link security fencing, with landscaping, on 17.8 acres of property located at 660 Fritz Drive,
was recommended for approval by the Coppell Planning and Zoning Commission on Thursday,
September 18, 2003, subject to the following conditions:
1 ) Providing fencing (8'black-coated chain link), with landscaping, on the north side
of the building.
2)
Provide a landscaped decorative metal security fence with 18" minimum-width
stone columns placed a minimum of 20' apart, on the south side. Provide a
matching decorative metal gate.
3) The two guardhouses shall be solid stone.
4)
The guardhouse roofs shall have a minimum 4:12 pitch, with overhangs a
minimum of 12".
]'he date scheduled for consideration by the Coppell City Council is Tuesday, October 14, 2003,
at 7 p.m. A representative for this case must be present at this meeting, which will be held in
(ouncil Chambers at City Hall. Failure to represent this item may result in the denial of this
application. City Council has instructed staff to include in its agenda packets only those items that
accurately reflect conditions as recommended by the Planning and Zoning Conunission. Therefore,
please submit to the Planning Department three (3) folded copies of the Site Plan and guardhouse
elevations on or before 12 noon~ Monday~ September 29th. Also, please submit one (1) 8 % x 1 l
paper reduction of each exhibit, along with one jpeg, tif or similar electronic file.
lfyou have any questions, please contact the Planning Department at (972) 304-3678.
Sincerely,
Flirecto~ of Planning
Building Inspection
file