Loading...
DRC commentsCOFFELL Project ID SPR-03-0064 Address 660 Fritz Dr CITY OF COPPELL DRC REPORT Project Name COFFELL Gateway Business Park, Lot 1, Block 1, Site Pla Project Type Application Date Case Manager Project Description Site Plan Amendment (Revision) 8/20/03 Gary Sieb To amend the Site Plan to allow for two guard shacks and perimeter chain-link security fencing Agency Building inspection Electric and Gas Engineering Fire Administration Parks and Recreation 1 of 1 Reviewed By Review Date Greg Jones 8/26/03 Jeff Curry 8/28/03 Teresa Turner 8/28/03 Travis Crump 8/28/03 John Elias 8/26/03 Planning Department Gary Sieb 8~25~03 Comments No comments No comment No Comments. No Comment The Nellie R. Stevens screening shrub needs tobe 5' tall, spaced at 6' on centers. 1. Change "Rod" to "Wrought" on Site Plan 2. Indicate scale of Site Plan drawing 3. Can gated area on south side of building be moved east to correspond with landscape islands? 4. Add additonal Nellie Stevens plants on north fencing and south fencing. 5. Do bubble diagrams on Site Plan mean anything? 6. Elevations on guard house need lots of work--should mimick existing building. Please revise drawings 7. Please refer to guard "shack" as guard "house". 8. Color Board needed for guard house.