UntitledAGENDA REQUEST FORM
COPPELL
DEPT: Planning
DATE: September 9, 2003
ITEM #: 17
ITEM CAPTION:
PUBLIC HEARING:
Consider approval of the Gateway Business Park, No. 2, Lots IR1 and 2R1, Block C, Replat (Washington Mutual),
to allow 50 additional parking spaces on 12.027 acres of property located at 555 Dividend Drive.
GOAL(S):
EXECUTIVE SUMMARY:
APPROVED BY
CITY COUNCIL
ABOVE DATE
Motion to close Public
Hearing & Approve
M - Peters
S - Faught
Vote - 6-0
York absent
Date of P&Z Meetinm August 21, 2003
Decision of P&Z Commission: Approval (6-0) with Commissioners McCaffrey, Reese, Kittrell,
McGahey, Halsey and Foreman voting in favor. None opposed.
Approval is recommended, with no conditions.
Staff recommends approval.
DIR. REVIEW: FIN. REVIEW: ~. ~ ~ CM REVIEW:
Agenda Request Form - Revised 09/02
Document Name: @TGBP#2, Replat I-AR
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Gateway Business Park, No. 2, Lots 1R1 and 2R1,
Block C, Replat (Washington Mutual)
P & Z HEARING DATE:
C.C. HEARING DATE:
August 2 l, 2003
September 9, 2003
STAFF REP.:
Marcie Diamond, Assistant Planning Director
LOCATION:
555 Dividend Drive.
SIZE OF AREA:
12.027 acres of property
CURRENT ZONING:
LI-S-1202 (Light Industrial with Special Use Permit-1202, for
outside petroleum products storage).
REQUEST:
Replat approval to allow 50 additional parking spaces on 8.097 acres
of property, containing a 104,000-square-foot building.
APPLICANT:
Owner:
Robert McCann
Catellus Development
5720 LBJ Freeway # 190
Dallas, TX 75240
972-419-1907
972-419-1925
Surveyor:
Steve Miller
Miller Surveying
430 Mid Cities Blvd.
Hurst, TX 76054
817-577-1052
817-577-0922
Page 1 of 3
Item#9
HISTORY:
In December 1998, Council approved a site plan and preliminary
plat with three lots totaling 32.82 acres for this tract of property.
The final plat for 7.31 acres was approved by the Planning and
Zoning Commission in 1999. The approved site plan was for a
103,611 square-foot (2-story) office building, which has since been
constructed.
In March of 2002, Council approved a site plan amendment for
this office building, allowing for an emergency generator with
screening wall to be located in close proximity to the east end of
the building. As recommended by the Planning and Zoning
Commission, the screening wall was revised to incorporate
various design features of the existing office building (spandrel
glass and reveals). This approval was also subject to the
condition that in the event this generator is no longer needed, the
generator, screening walls and non-required landscaping shall be
removed.
TRANSPORTATION:
In August of 2002, Council approved Special Use Permit-1202 for
the subject tract to allow for a 4,000-gallon above-ground
gasoline storage tank for a proposed back-up generator. The site
plan was also revised to allow for 32 additional parking spaces.
This property was also replatted at that time to accommodate the
additional parking.
LBJ Freeway is a full-service freeway built to standard. This tract
may be accessed from the Freeport Parkway exit. Dividend Drive,
which contains enhanced pavement and landscaping and is the entry
road into the Gateway Business Park, was constructed with this
development and is located at the northeastern edge of this tract.
This street.
SURROUNDING LAND USE & ZONING:
North- vacant; LI (Light Industrial)
South - LBJ Freeway
East - Coppell Middle School West; C (Commercial)
West - vacant; LI (Light Industrial)
COMPREHENSIVE PLAN:
The Comprehensive Plan shows the property as suitable for
freeway commercial uses.
Page 2 of 3
Item #9
DISCUSSION:
As discussed in the HISTORY section, this area was
originally platted as a three-lot subdivision, one lot north
and two lots south of Dividend Drive and was replatted last
year to add approximately 13,200-square feet of property to
Lot 2R to allow for the construction of 32 parking spaces.
The current request is to add 50 more parking spaces to the
northeast side of this parking lot. To accommodate these
additional spaces, approximately 1/2 of an acre is being
added to Lot 2R1. This will result in a decrease in acreage
of Lot 1R2 from 4.41 to 3.930 acres and an increase of Lot
2R1 from 7.61 to 8.097 acres.
All easements and the fire lane have been brought forward
from the original plat and are correctly delineated on the
replat.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of Gateway Business Park, No. 2, Lots
1R1 and 2R1, Block C, Replat, with no conditions
ALTERNATIVES: 1) Recommend approval of the request.
2) Recommend disapproval of the request
3) Recommend modification of the request
ATTACHMENTS:
1) Replat of Gateway Business Park, No. 2, Lots 1R1 and 2R1, Block C
Page 3 of 3
Item//9