Loading...
CC approval on 9/9/03COFPELL AGENDA REQUEST FORM DEPT: Planning DATE: September 9, 2003 ITEM #: 16 ITEM CAPTION: Consider approval of the Gateway Business Park, No. 2, Lot 2R1, Block C, Site Plan Amendment (Washington Mutual), to amend the Site Plan to allow 50 additional parking spaces on 8.097 acres of property located at 555 Dividend Drive. APPROVED BY CITY COUNCIL ON ABOVE DATE GOAL(S): Motion to Approve M - Tunnell S - Raines Vote - 6-0 ~'ork absent EXECUTIVE SUMMARY: Date of P&Z Meeting: August 21, 2003 Decision of P&Z Commission: Approval (6-0) with Commissioners McCaffrey, Reese, Kittrell, McGahey, Halsey and Foreman voting in favor. None opposed. Approval is recommended, with no conditions. Staff recommends approval. Agenda Request Form - Revised 09/02 CM REVIEW: signed by ch=Jim Document Name: C~,6GBP#2, SPA I-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Gateway Business Park, No. 2, Lot 2R1, Block C Site Plan Amendment (Washington Mutual) P & Z HEARING DATE: C.C. HEARING DATE: August 21, 2003 September 9, 2003 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: 555 Dividend Drive. SIZE OF AREA: 8.097 acres of property CURRENT ZON1NG: LI-S-1202 (Light Industrial with Special Use Permit-1202, for outside petroleum products storage). REQUEST: Amend the Site Plan to allow 50 additional parking spaces on 8.097 acres of property, containing a 104,000-square-foot building. APPLICANT: Owner: Robert McCann Catellus Development 5720 LBJ Freeway #190 Dallas, TX 75240 972-419-1907 972-419-1925 Architect: Terrance J. Wright Wright Group 1110 S. Elm Street Carrollton, TX 75006 972-242-1015 972-446-8013 Page 1 of 3 Item #8 HISTORY: TRANSPORTATION: In December 1998, Council approved a site plan and preliminary plat with three lots totaling 32.82 acres for this tract of property. The Planning and Zoning Commission approved the f'mal plat for 7.31 acres in 1999. The approved site plan allowed for the construction of the 103,611 square-foot (2-story) office building. In March of 2002, Council approved a site plan amendment for this office building, allowing for an emergency generator with screening wall to be located in close proximity to the east end of the building. As recommended by the Planning and Zoning Commission, the screening wall was revised to incorporate various design features of the existing office building (spandrel glass and reveals). This approval was also subject to the condition that in the event this generator is no longer needed, the generator, screening walls and non-required landscaping shall be removed. In August of 2002, Council approved Special Use Permit-1202 for the subject tract to allow for a 4,000-gallon above-ground gasoline storage tank for a proposed back-up generator. The site plan was also revised to allow for 32 additional parking spaces. This property was also replatted at that time to accommodate the additional parking. LBJ Freeway is a full-service freeway built to standard. This tract may be accessed from the Freeport Parkway exit. Dividend Drive, which contains enhanced pavement and landscaping and is the entry road into the Gateway Business Park, was constructed with this development and is located at the northeastern edge of this tract. SURROUNDING LAND USE & ZONING: North- vacant; LI (Light Industrial) South - LBJ Freeway East - Coppell Middle School West; C (Commercial) West - vacant; LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for freeway commercial uses. Page 2 of 3 Item//8 DISCUSSION: This is very similar to the previous site plan amendment that was approved last year on this tract. At that time, the site plan and plat were revised to allow for 32 additional parking spaces. This time, the applicant is requesting an additional 50 spaces to serve the needs of the tenant of the north half of the building, which is Washington Mutual. Given that this additional parking crosses an existing lot line, replatting is required. The expanded parking lot will be landscaped with the same materials as the original lot, and these parking spaces will be accessed through the existing parking lot and driveways. RECOMMENDATION TO THE PLANNING AND ZON1NG COMMISSION: Staff recommends APPROVAL the revised site and landscape plans for Gateway Business Park, No. 2, Lot 2R1, Block C, with no conditions. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Overall Site Plan 2) Enlarged Site Plan of expanded parking lot 3) Landscape Plan Page 3 of 3 Item#8 Gateway I Office Building Additional Parking 555 Dividend Drive Coppell, Texas 75019 Gateway I Office Building Add/t/ona/ Parking 555 Dividend Drive Coppell, Texas 75019 1 I~I i~1 Gateway I Off, ce Building 555 Dividend Drive Coppell, Texas 75019