Loading...
DRC commentsCO PPELL Proiect ID SPR-03-00§~ Addros~ 555 Dividend CITY OF COPPELL DRC REPORT Project Name Project Type Application Date Case Manager Project Description Site Plan Amendment (Revision) 7/22J03 Marcie Diamond to amend the Site Plan to allow 50 additional parking spaces COPPELL Gateway Business Park, No. 2, Lot 2R1, Block C Agency Building Inspection Electric and Gas Engineering Fire Administration Parks and Recreation Planning Department 1 of Reviewed By Review Date Greg Jones 7/31/03 Jeff Curry 7/31/03 Teresa Turner 7/31/03 Travis Crump 7/29/03 John Elias 7/30/03 Maroie Diamond 7/28/03 Comments No Comments made. No Comments Received 1. The alternate paving plan will be acceptable. No comment No Comments Gateway: Sheet A101 -Overall dimension of new parking area needs to be 62' (19' + 24' + 19') Sheet A102 -1. Minimum required parking stall length is 19' 2. It appears that the two of the eastern most, proposed landscape islands, are less than the required 150 square feet. Sheet L101-1. Need to add a line indicating the location of the the 3rd new Cedar Elm along the north property line. 2. In appears that the two, eastern most proposed landscaped islands are less than the required 150 square feet in size. 3. Specify the type of ground cover/gress that will be used. Sheet C102~ Do not resubmit this sheet, Comments for the City of Coppell Development Review Cmm~fittee August 4, 2003 Gateway Business Park, No. 2, Lot 2R1, Block C, Site Plan Amendment Site Plan Acceptable JeffCurry Sg~-J $00/900d OZ6-1 O~t~O~Z~8 93d ig~]N] ~OONO-$O~J edO0:~O £00Z-~0-80