The proposed tree removal mitigation plan at Canterbury Court proposes the removal of 261 inches of
protected trees at the initial stage of development (streets, utility extensions), with 264 inches replaced on
site at the lots not containing trees. Reparation will then be made for the removal of trees due to the
development of the individual lots as development progresses. The developer estimates that an
additional 366 inches of trees may be removed as the lots are graded, and homes are built. This
reparation will be made by the home builder paying into the Reforestation and Naturalization Fund in the
amount stipulated in the ordinance.
Though the proposal to allow for trees to be mitigated on individual
residential lots is prohibited in the Tree Preservation Ordinance, it may be
acceptable if the developer agrees to ensure the maintenance and
replacement, when necessary, of the new trees for a period of two years.
The developer should not be allowed to plant the trees and walk
away without commitment to the health of the trees. This stipulation
is placed on Commercial properties, where landscape credits are
allowed. Also, it is recommended the developer show an estimated size,
location and minimum elevation for a potential slab on each lot where
trees are scheduled for preservation. The elevation at which the homes
are built could have a dramatic impact on the long term survivability of
the preserved trees.
The developer's plan to allow for the mitigation of trees on the individual lots on a lot-by-lot basis does not
meet the spirit or intent of the Tree Preservation Ordinance. This is an obvious attempt to minimize
up-front cost incurred by the developer. However, the Tree Mitigation Plan includes a table of the
estimated reparation schedule on a per lot basis. If this table is included on the final plat document, so
that the lot purchasers are made aware of these financial commitments as well as the number of trees that
are required to be preserved, then it may also be acceptable. ~
Brad Reid :'~) '*- y. ~j "~ e~' ~czJ. t~.~' -
From:
To:
Date:
Subject:
Brad Reid
Marcie Diamond
Thu, Sep 14, 2000 6:06 PM
Canterbury Court Proposal
Marcie,
The proposed tree removal mitigation plan at Canterbury Court proposes the removal of 261 inches of
protected trees at the initial stage of development (streets, utility extensions), with 264 inches replaced on
site at the lots not containing trees. Reparation will then be made for the removal of trees due to the
development of the individual lots as development progresses. The developer estimates that an
additional 366 inches of trees may be removed as the lots are graded, and homes are built. This
reparation will be made by the home builder paying into the Reforestation and Naturalization Fund in the
amount stipulated in the ordinance.
Though the proposal to allow for trees to be mitigated on individual
residential lots is prohibited in the Tree Preservation Ordinance, it may be
acceptable if the developer agrees to ensure the maintenance and
replacement, when necessary, of the new trees for a period of two years.
The developer should not be allowed to plant the trees and walk
away without commitment to the health of the trees. This stipulation
is placed on Commercial properties, where landscape credits are
allowed. Also, it is recommended the developer show an estimated size,
location and minimum elevation for a potential slab on each lot where
trees are scheduled for preservation. The elevation at which the homes
are built could have a dramatic impact on the long term survivability of
the preserved trees.
The developer's plan to allow for the mitigation of trees on the individual lots on a lot-by-lot basis does not
meet the spirit or intent of the Tree Preservation Ordinance. This is an obvious attempt to minimize
up-front cost incurred by the developer. However, the Tree Mitigation Plan includes a table of the
estimated reparation schedule on a per lot basis. If this table is included on the final plat document, so
that the lot purchasers are made aware of these financial commitments as well as the number of trees that
are required to be preserved, then it may also be acceptable.
Brad Reid