Prestwick Crt/PP-CS000923TREE MITAGATION PLAN
~ TIlE RiGHT-OF-WAY:
1. All trees within the proposed fight-of-way and utility
easements will be removed.
2. l~p~ trees (minimum of 4" c~iper end 7' height)
will be planted, utilizing q)proved planting me~mde to
$. Replaceammt of those trees removed from the right-of-way
will be located accordin~ to th~ following schedule:
Tree Repl~cemmt 8chMuk
R~r Ymi 10
Fmat Yml lO
Treesm~ ~ (~ per Ia} Included m ~o C~y',
Rmr Yanl s Api~oved ~ ~
FromYmi 8 Will bo Pbmed
Front Ymi 2
TOTAL, Mnqlld~ 'fT~E33S R~PLA~EI)
(~ 4.0 mi_n~u~ m"' d~ 66 x 4)
ov~!
Removed
ON INDIVIDUAL [~OTS:
1. Trees on individual lots will bo assessed on a lo~-by-lot
basis a~ time of buildi~ l~m~it Tr~ mmov~ win be
minim/zed on each lot
Individual lot owners will pay reparation for those trees
actually removed. Final reparations may not be ns
estimated on the current plan. Based on the current plan,
it is estimated that reparations will be made as follows:
Tree Reparation Schedule
t~ ~ ~
3 is
5 10 Sit000
6 8~
7 79 ~,900
8 ~65
9 16 Sl,600
TOTAL 366 S36,600
Pt/or to land development, all ~ trees shall b~ ii. ged with
bright, fluorescent ribbon ~t a height of four feet (4') above natural
grade.