Loading...
P&Z letter of approval on 8/17/2006 THE'CiTY.OF COPPELL +-~:~c~f;~~, ,~jf}g!/f;l:'<-;,~ "~.,,,~.~ ~;;<.. .~-:;:;. q 'C ">fIiI"":/~"~ x II b \ II August 18, 2006 The Reverend Byung Shin ARK Church 517 E. Sandy Lake Road Coppell, Texas 750]9 RE: Strin2fellow Addition, Lot 1, Block B, Reolat Dear Mr. Shin: This letter is to inform you that Stringfellow Addition, Lot !, Block B, Replat, to allow the construction of a 4,255-square-foot church on approximately 0.6 acres of property located at 5] 7 Sandy Lake at the southwest corner of Holly Street, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, August 17,2006, subject to the following conditions: 1) Contact Larry Redick at 972-323-89] 7 to discuss easement requirements. 2) Remove "Minor Plat" from the title block. 3) Indicate what type of easement is proposed to be dedicated on the western property line. 4) Comply with all Engineering comments (attached). The date scheduled for consideration by the Coppell City Council is Tuesday, September 12, 2006, at 7 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department three (3) folded copies of the revised Replat on or before 12 noon, Wednesday, AU1!ust 30th, Also, please submit one (l) 8 ~ x ] 1 paper reduction, along with one jpg, tiff, pdf or similar electronic file. If you have any questions, please contact the Planning Department at 972.304.3678. Sincerely, JlciJ1CSS-t- Matt Steer, AICP City Planner c: Ralph Martinez, RGM Architects Engineering Department Building Inspection ,jFile 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 _0rPELL '~~' .'" ~ '.. .. r < ' . ~ ." -t ~ ,') \ ill CITY OF COPPELL 2nd ORe REPORT Proiect 10 RP-06-0036 Address 517 Sandy Lake Rd Proiect Name Stringfellow Addition, Lot 1 , Block B Proiect Tvpe Replat Application Date 7/20/2006 Case ManaCler Matt Steer Proiect Description to allow the construction of a 4,255-square-foot 1 of Aqency Engineering Comments 1. Utility Plans indicate re-using the existing water/sewer services. Are these adequately sized for the new facility? 2 Drainage should be collected on-site and conveyed to the inlet/collection system in Holly Street underground 3. A permit will be required from the Engineering Dept for construction of the parking lot and utilities. This will require Engineering Plans. 4. Impact fees will be assessed based on the capacity of the new facility, and any expanded utility service.