Loading...
CC approval on 7/12/05AGENDA REQUEST FORM COPPELL DEPT: Planning DATE:! July 12, 2005 ITEM #: 17 ITEM CAPTION: PUBLIC HEARING: Consider approval of the Stringfellow Addition, Lot 1 R, Block A, Replat, (I~ationwide insurance), being a replat of Tract 1, Block A, to allow the construction ora 3,028-square-foot office l~uilding on 0.42 of an acre of property located at the southwest corner of Sandy Lake and Moore Roads. GOAL(S): APPROVED BY i CITY COUNCIL ON ABOVE DATE EXECUTIVE SUMMARY: Date of P&Z Meeting: June 16, 2005 Decision of P&Z Commission: Approval (6-0) with Commissioners Foreman, Milosevich and Kittrell voting in favor. None opposed. Approval is recommended, subject to the following conditions: 1) Contact Larry Redick at 972-323-8917 to discuss electric ease: 2) Compliance with the attached Engineering comments. Staff recommends approval. Motion to close Public Hearing and Approve subject to conditions 1 & 2 below M - Hinojosa-Flores S - York Vote - 6-0 ,/i~2~ ~7, Tunnell absent ~'~ Borchgardt, Hall, McCaffrey, nent requirements. Agenda Request Form - Revised 09/04 Document Name: ~6Stringfellow Rep I-AR CASE: P & Z HEARING DATE: C.C. HEARING DATE: STAFF REP.: LOCATION: SIZE OF AREA: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Stringfellow Addition Lot (Nationwide Insuran June 16, 2005 July 12,2005 Matt Steer, City Planner Southwest comer of Sandy Lake an~ 0.42 of an acre of property lock Replat ce) I Moore Roads. CURRENT ZONING: REQUEST: PD-203-R (Planned Development-243-Retail) Replat approval to allow the construction of a 3,028-square-foot office building. / APPLICANT: HISTORY: Page 1 of 3 Applicant: David King Nationwide Insurance 110 W Sandy Lake #116 Coppell, TX 75019 Phone: (972) 393-3311 Fax: (972) 393-4945 Engineer: Jim Dewey, Jr. JDJR Engineers 2500 Texas Dr. #100 Irving, TX 75062 Phone: (972) 252-5357 Fax: (972) 252-8958 This property is currently Lot 1, Block A, ol residential subdivision filed in November 1961. different portions have been replatted. Nash Mano into multiple lots, and the Stringfellow Additio between Lots 4 & 5, Block B. In August 2004, a Council for this lot; however, it was not filed and Item # 9 rchitect: .ob Anderson lan Solutions Architects 73 E Las Colinas Blvd #169 ving, TX 75039 hone: (972) 373-9999 ax: (972) 373-9001 the Stringfellow Addition, a Since the initial subdivision, divided one of the original lots Replat amended the lot line 'eplat was approved by the City aas since expired. At that time, the property was rezoned to PD-203-R to allow square-foot building with 12 parking spaces. TRANSPORTATION: Sandy Lake Road has recently 1 divided thoroughfare, built gener~ way. Moore Road is a two-lane within 60-feet of right-of-way. SURROUNDING LAND USE & ZONING: North - Medical/Office building; C (Comn South - Residential; SF-12 (Single Family- East - Retail shopping center with gas pure West - Residential; SF-12 (Single Family-I florist to occupy a 2,700- ~een improved to a fourqane lly within 95-feet of right-of- tndivided collector street, built tercial) t2) ps; R (Retail) 2) COMPREHENSIVE PLAN: The Comprehensive Plan oIMay 1996 shows the property as suitable for Neighborhoo~ Retail. DISCUSSION: The purpose of this replat is to add drain Because this is a residential replat, a owners within 200' within the existing s~ notification was sent out to four additior subdivision. None of the notices were retu tge easements and a fire lane. aotification to those property tbdivision was required. This al property owners within the reed in favor or opposition. The current drainage of the surrounding ~roperty to the south and west is through this lot. The applicant is proposin,g, drainage improvements on the west property line; therefore, ~ 20 drainage easement is proposed. ~ RECOMMENDATION TO THE PLANNING AND ZONING CO~MISSION: Smteatf:f recommends APPROVAL of the Replat, subject tolthe following conditions being 1) Please contact Larry Redick at 972-323-8911 to discuss electric easement requirements. I / 2) Ensure all easements shown on the plat are s~own on the site plan and vice versa. Page 2 of 3 Item # 9 3) Refer to the attached Engineering Comments. ALTERNATIVES 1) 2) 3) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request ATTACHMENTS: l) Engineering comment sheet 2) Replat Item # 9 Page 3 of 3 COPPELL Pt'oiect Tvoe Replat Am~catioe Date 5/18/2005 Case Mar~__ _ Proiect De~ CITY OF COPPEL£ 2nd DRC REPOR'I COPPELL St~ngfellow Add, LtlR BIkA, Replat A refl~ ol' Tract 1, Bilk A, to allow lhe ce~l~ud~t o~ a 3,~ ,:=e4~t e~ce on 0.42 ~ an ac~e ~ prope~ A.qency Engineering I of 1 Comments Grading and Paving Plan 1. The surPace drainage from drainage areas B1 arid C2 should not sheet flow to the street. Pick up this flow and convey it on s~te to the storm ~ system_ >- Z (]VO~l 3MOOR 'S ~