Loading...
CC approval on 11/8/05AGENDA REQUEST FORM COPPELL DEPTt Planning DATE: November 8, 2005 ITEM#: 14 ITEM CAPTION: PUBLIC HEARING: Consider approval of the Wynnpage Plaza North, Lot 1 R, Block B, Replat and Lots 2 and 3, Block B, Final Plat, to allow the reconfiguration of a fire lane and mutual access easement on Lot IR, containing .68 of an acre of property, the development of an approximate i6,000-square-foot two-stOXY building on Lot 2, containing 1.10 acres of property, and an approximate 3,500-square-foot one-sto]2¢ office b{uilding on Lot 3, containing 1.13 acres of property located along the west side of Denton Tap Road, approximately 180 feet no~ch of Wynnpage Drive. GOAL(S): EXECUTIVE SUMMARY: APPROVED BY q CITY COUNCIL ON ABOVE DATE Motion to close the Public Hearing & Approve subject ~o conditions 1,2,3&4 below M - Tunnell S - York ~/ote - 6-0 ' L~IY~¥ "a~ Suhy absent ~.~:~*:~2- Date of P&Z Meeting: October 20, 2005 Decision of P&Z Commission: Approval (7-0) with Comm~ssionersiBorchgardt, Hall, McCaffrey, Foreman, Haas, Kittrell and Reese voting in favor. None opposed. Approval is recommended, subject to the following conditions: l) Submit verification if the Board of Adjustment grants the following variances to the Zoning Ordinance: ~ ' ~ / a. Deleting the perimeter landscaping requirement fbr Lots 1 and 2, Block B. '~ b. Allowing a minimum 11 '-side yard setback for Lo~ 2, Block B. c. Allowing a minimum 11 '-front/side yard setback fCr Lot 1, Block B. q r ' 2) Provide a final cross-parking agreement between these two Woperties. 3) SuBmit revised Site and Landscape Plans with proposed lot lines shown, if approved through the ' Board of Adjustment process. 4) Compliance with the attached Engineering comments. Staff recommends approval. Agenda Request Form - Revised 09/04 Document Name: ~3Wynpge PIz,Rep&FP bAR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Wynnpage Plaza North, Lot 1. R, iBlock B, Replat, and Lots 2&3, Block B, Fma~ Plat P & Z HEARING DATE: C.C. HEARING DATE: October 20, 2005 November 8, 2005 STAFF REP.: Matt Steer, City Planner LOCATION: West side of Denton Tap oad, approximately 180' north of Wyrmpage Drive. SIZE OF AREA: 2.91 acres of property CURRENT ZONING: C (Commercial) REQUEST: Replat and Final Plat approval to aliow the reconfiguration of a fire lane and mutual access easement o~a Lot IR, the development of a two-story building on Lot 2 and a on~-story office building on Lot 3. APPLICANT: Applicant: Engineer: SCI-Wynnpage I & II, L.P. Bentley Engineering, Inc. Greg Yancey Marc Bentle3~, P.E. 722 S. Denton Tap Rd., Ste. 230 4125 Broad~ay Blvd., Ste. A250 Coppell, TX 75019 Garland, TX 75043 Phone: (972) 745-9080 Phone: (972)i240-4821 Fax: (972) 745-0799 Fax: (972) 240-0922 Page 1 of 3 Item # 8 HISTORY: TRANSPORTATION: The subject property was originally i~latted as part of the 14-lot 25.65 acre DTC Business Center, which ~as filed on January 6, 1987. On March 26, 1991, Council approved the rezoning of the residential property to the west from C , (Wynnpage single-family subdivi development of the Wynnpage re Business Center plat was vacated, 2002, a Preliminary Plat for three k for Lot 1, Block B, were approved. but never filed, consisted of a Final of the preliminary platted lots into lane and mutual access easement of to retain the two preliminary platter Denton Tap Road is a P6D, six-lan, to standard in a 110-foot right-of-w~ Commercial) to PD-115-SF-7 sion). As a result of the fidential subdivision, the DTC ~n May 8, 1992. In November ts and a Site Plan and Final Plat A previous proposal, approved Plat and Replat, combining two one, and reconfiguring the fire Lot 1, Block B. This proposal is lots, forming one flag lot at the rear, and to again propose a replat~f Lot 1, Block B, in order to reconfigure the fire lane and mutual ~ccess easement. 1 ~ divided concrete roadway built y. SURROUNDING LAND USE & ZONING: North - undeveloped; C (Commercial) South - office building under construction; East - CISD Administration Building and West - Wynnpage residential subdivision; COMPREHENSIVE PLAN: DISCUSSION: Page 2 of 3 The Comprehensive Plan c suitable for mixed-use, whic (Commercial) edical office; C (Commercial) D-115-SF-7 (Single-Family 7) May 1996 shows the property as ~ includes office and retail uses. As mentioned in the HISTORY section, t preliminary platted lot lines as previously de a 55' strip to provide frontage for the rear lc be replatted in order to reconfigure the fire 1 The applicant has obtained permission: regulating the 50'-gas easement to realign easement and to be allowed to park withi would not recommend approval of a fl~ multiple access points in close proximity o irregularly-shaped lot with mutual access Item# 8 tis proposal is to keep the three picted, except for now including t. Lot 1, Block B, is proposed to me and mutual access easement. i'om the current gas company the fire lane and mutual access a the easement. Normally, staff g lot, due to the potential for gone another. Because this is an 3eing provided at one curb cut, we can recommend approval, subject to the Board of Adjustment granting the following variances to the Zoning Ordinance: 1. Deleting the perimeter landscaping requirement for Lots 1 and 2, Blbck B. 2. Allowing a minimurh 11 '-side yard setback for Lot 2, Block B. 3. Allowing a minimur~ 11 '-front/side yard setback for Lot 1, BlBck B. On the previously approved Site Plani the two proposed northern buildings were to be served by a total df 103 parking spaces for both buildings. These met the requirements foi parking with the rear building being devoted solely as medical office t~se (3,500-square feet with 20 spaces required). The parking for the front two-story building was calculated as follows: · Restaurant space - 1,700-t;quare feet with 17 spaces required, · Outside patio - 940-square fee! with 9 spaces required, · Retail - 6,000-square feet withi30 spaces required, and · Second-floor office 8,000-square feet with 27 spaces required. With the division of property, the previously approved number of parking spaces per lot changed. There are now ~ 6 additional spaces on Lot 1, Block B (rear building) and 16 less on l~ot 2, Block B (front two-story building); therefore, the applicant will b~ required to provide a cross- parking agreement between these two properties to ensure the total parking provided meets the total required for both l~uildings. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of Wyrmpage Plaza North, Lot IR, Block B, Replat and Lots 2&3, Block B, Final Plat, subject to the following cogditions being met: 1) Revise vicinity map to reflect entire property beiOg platted. 2) Submit verification if the Board of Adjustment grants the following variances to the Zoning Ordinance: a. Deleting the perimeter landscaping reqgirement for Lots 1 and 2, Block B. b. Allowing a minimum 1 l'-side yard setlSack for Lot 2, Block B. c. Allowing a minimum 1 l'-front/side yard setback for Lot 1, Block B. Page 3 of 3 Item # 8 3) Provide a cross-parking agreement between these two properties. 4) Submit revised Site and Landscape Plans with proI ~osed lot lines shown, if approved through the Board of Adjustment proce~ 5) Compliance with the attached Engineering comm~ nts ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request ATTACHMENTS: 1) Site Plan with New Lot Line 2) Final PlaffReplat 3) Engineering comments Item # 8 Page 4 of 3 ,I ,I COPPELL Proiect ID FP-05-004O Address CITY OF COPPELL 2nd DRC REPORT Project Name COPPELL Wynnpage Plaza North, Lot 1R, 2 Block B, RP & M Project Tv~e ADDlication Date Case Manaqer Proiect Description Final Plat 9/21/2005 Matt Steer To allow the reconfiguration of a fire lane and mutual access easement on .68 of an acm of property on Lot 1R, and the development of an approximate 16,000-square-foot two-story building on Lot 2, containing 1.10 acres of properly, and an approximate 3,500-square-foot one-story office building on Lot 3 on 1.13 acres of property. Af:lency Engineering 1 of 1 Comments 1. All utilities that cross property lines should be located within private utility easements. 2. Provide a Property Association Agreement between Lots 1R, 2 and 3, Block B for the maintenance of the shared utilities. The agreement should include maintenance of the lift station. 3. The portion of the service line that provides water to Lot 2 and is located on Lot 3 should be located within a private utility easement. 4. Locate the fire hydrant and FDC currently shown on Lot 2 to the parking island located on the east side of the 24' x 29.5' Access Easement. These should be placed within a private utility easement. 5. What is the intent of providing a water stub to the property to the north? 6. Flows to the north from the proposed flume should not be concentrated when they enter the adjacent property. Drainage will be further evaluated upon detailed Engineering Review. Additional comments may be generated upon detailed Engineering Review.