CC approval on 11/8/05AGENDA REQUEST FORM
COPPELL
DEPTt Planning
DATE: November 8, 2005
ITEM#: 14
ITEM CAPTION:
PUBLIC HEARING:
Consider approval of the Wynnpage Plaza North, Lot 1 R, Block B, Replat and Lots 2 and 3, Block B, Final Plat, to
allow the reconfiguration of a fire lane and mutual access easement on Lot IR, containing .68 of an acre of
property, the development of an approximate i6,000-square-foot two-stOXY building on Lot 2, containing 1.10
acres of property, and an approximate 3,500-square-foot one-sto]2¢ office b{uilding on Lot 3, containing 1.13 acres
of property located along the west side of Denton Tap Road, approximately 180 feet no~ch of Wynnpage Drive.
GOAL(S):
EXECUTIVE SUMMARY:
APPROVED BY
q CITY COUNCIL
ON ABOVE DATE
Motion to close the Public
Hearing & Approve subject
~o conditions 1,2,3&4 below
M - Tunnell
S - York
~/ote - 6-0 ' L~IY~¥ "a~
Suhy absent ~.~:~*:~2-
Date of P&Z Meeting: October 20, 2005
Decision of P&Z Commission: Approval (7-0) with Comm~ssionersiBorchgardt, Hall, McCaffrey,
Foreman, Haas, Kittrell and Reese voting in favor. None opposed.
Approval is recommended, subject to the following conditions:
l) Submit verification if the Board of Adjustment grants the following variances to the Zoning
Ordinance:
~ ' ~ / a. Deleting the perimeter landscaping requirement fbr Lots 1 and 2, Block B.
'~ b. Allowing a minimum 11 '-side yard setback for Lo~ 2, Block B.
c. Allowing a minimum 11 '-front/side yard setback fCr Lot 1, Block B.
q r ' 2) Provide a final cross-parking agreement between these two Woperties.
3) SuBmit revised Site and Landscape Plans with proposed lot lines shown, if approved through the
' Board of Adjustment process.
4) Compliance with the attached Engineering comments.
Staff recommends approval.
Agenda Request Form - Revised 09/04 Document Name: ~3Wynpge PIz,Rep&FP bAR
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Wynnpage Plaza North, Lot 1. R, iBlock B, Replat,
and Lots 2&3, Block B, Fma~ Plat
P & Z HEARING DATE:
C.C. HEARING DATE:
October 20, 2005
November 8, 2005
STAFF REP.:
Matt Steer, City Planner
LOCATION:
West side of Denton Tap oad, approximately 180' north of
Wyrmpage Drive.
SIZE OF AREA:
2.91 acres of property
CURRENT ZONING:
C (Commercial)
REQUEST:
Replat and Final Plat approval to aliow the reconfiguration of a fire
lane and mutual access easement o~a Lot IR, the development of a
two-story building on Lot 2 and a on~-story office building on Lot 3.
APPLICANT:
Applicant: Engineer:
SCI-Wynnpage I & II, L.P. Bentley Engineering, Inc.
Greg Yancey Marc Bentle3~, P.E.
722 S. Denton Tap Rd., Ste. 230 4125 Broad~ay Blvd., Ste. A250
Coppell, TX 75019 Garland, TX 75043
Phone: (972) 745-9080 Phone: (972)i240-4821
Fax: (972) 745-0799 Fax: (972) 240-0922
Page 1 of 3
Item # 8
HISTORY:
TRANSPORTATION:
The subject property was originally i~latted as part of the 14-lot 25.65
acre DTC Business Center, which ~as filed on January 6, 1987. On
March 26, 1991, Council approved the rezoning of the residential
property to the west from C ,
(Wynnpage single-family subdivi
development of the Wynnpage re
Business Center plat was vacated,
2002, a Preliminary Plat for three k
for Lot 1, Block B, were approved.
but never filed, consisted of a Final
of the preliminary platted lots into
lane and mutual access easement of
to retain the two preliminary platter
Denton Tap Road is a P6D, six-lan,
to standard in a 110-foot right-of-w~
Commercial) to PD-115-SF-7
sion). As a result of the
fidential subdivision, the DTC
~n May 8, 1992. In November
ts and a Site Plan and Final Plat
A previous proposal, approved
Plat and Replat, combining two
one, and reconfiguring the fire
Lot 1, Block B. This proposal is
lots, forming one flag lot at the
rear, and to again propose a replat~f Lot 1, Block B, in order to
reconfigure the fire lane and mutual ~ccess easement.
1
~ divided concrete roadway built
y.
SURROUNDING LAND USE & ZONING:
North - undeveloped; C (Commercial)
South - office building under construction;
East - CISD Administration Building and
West - Wynnpage residential subdivision;
COMPREHENSIVE PLAN:
DISCUSSION:
Page 2 of 3
The Comprehensive Plan c
suitable for mixed-use, whic
(Commercial)
edical office; C (Commercial)
D-115-SF-7 (Single-Family 7)
May 1996 shows the property as
~ includes office and retail uses.
As mentioned in the HISTORY section, t
preliminary platted lot lines as previously de
a 55' strip to provide frontage for the rear lc
be replatted in order to reconfigure the fire 1
The applicant has obtained permission:
regulating the 50'-gas easement to realign
easement and to be allowed to park withi
would not recommend approval of a fl~
multiple access points in close proximity o
irregularly-shaped lot with mutual access
Item# 8
tis proposal is to keep the three
picted, except for now including
t. Lot 1, Block B, is proposed to
me and mutual access easement.
i'om the current gas company
the fire lane and mutual access
a the easement. Normally, staff
g lot, due to the potential for
gone another. Because this is an
3eing provided at one curb cut,
we can recommend approval, subject to the Board of Adjustment granting
the following variances to the Zoning Ordinance:
1. Deleting the perimeter landscaping requirement
for Lots 1 and 2, Blbck B.
2. Allowing a minimurh 11 '-side yard setback
for Lot 2, Block B.
3. Allowing a minimur~ 11 '-front/side yard
setback for Lot 1, BlBck B.
On the previously approved Site Plani the two proposed northern
buildings were to be served by a total df 103 parking spaces for both
buildings. These met the requirements foi parking with the rear building
being devoted solely as medical office t~se (3,500-square feet with 20
spaces required). The parking for the front two-story building was
calculated as follows:
· Restaurant space - 1,700-t;quare feet with 17 spaces
required,
· Outside patio - 940-square fee! with 9 spaces required,
· Retail - 6,000-square feet withi30 spaces required, and
· Second-floor office 8,000-square feet with 27 spaces
required.
With the division of property, the previously approved number of parking
spaces per lot changed. There are now ~ 6 additional spaces on Lot 1,
Block B (rear building) and 16 less on l~ot 2, Block B (front two-story
building); therefore, the applicant will b~ required to provide a cross-
parking agreement between these two properties to ensure the total parking
provided meets the total required for both l~uildings.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends APPROVAL of Wyrmpage Plaza North, Lot IR, Block B, Replat and
Lots 2&3, Block B, Final Plat, subject to the following cogditions being met:
1) Revise vicinity map to reflect entire property beiOg platted.
2) Submit verification if the Board of Adjustment grants the following variances to
the Zoning Ordinance:
a. Deleting the perimeter landscaping reqgirement for Lots 1
and 2, Block B.
b. Allowing a minimum 1 l'-side yard setlSack for Lot 2, Block B.
c. Allowing a minimum 1 l'-front/side yard setback for Lot 1, Block B.
Page 3 of 3
Item # 8
3) Provide a cross-parking agreement between these two properties.
4) Submit revised Site and Landscape Plans with proI ~osed lot lines shown, if
approved through the Board of Adjustment proce~
5) Compliance with the attached Engineering comm~ nts
ALTERNATIVES 1) Recommend approval of the request
2) Recommend disapproval of the request
3) Recommend modification of the request
ATTACHMENTS: 1) Site Plan with New Lot Line
2) Final PlaffReplat
3) Engineering comments
Item # 8
Page 4 of 3
,I
,I
COPPELL
Proiect ID FP-05-004O
Address
CITY OF COPPELL
2nd DRC REPORT
Project Name
COPPELL
Wynnpage Plaza North, Lot 1R, 2 Block B, RP & M
Project Tv~e
ADDlication Date
Case Manaqer
Proiect Description
Final Plat
9/21/2005
Matt Steer
To allow the reconfiguration of a fire lane and mutual access easement on .68 of an acm of property on Lot 1R, and the
development of an approximate 16,000-square-foot two-story building on Lot 2, containing 1.10 acres of properly, and
an approximate 3,500-square-foot one-story office building on Lot 3 on 1.13 acres of property.
Af:lency
Engineering
1 of 1
Comments
1. All utilities that cross property lines should be located within private utility easements.
2. Provide a Property Association Agreement between Lots 1R, 2 and 3, Block B for the
maintenance of the shared utilities. The agreement should include maintenance of the lift station.
3. The portion of the service line that provides water to Lot 2 and is located on Lot 3 should be
located within a private utility easement.
4. Locate the fire hydrant and FDC currently shown on Lot 2 to the parking island located on the
east side of the 24' x 29.5' Access Easement. These should be placed within a private utility
easement.
5. What is the intent of providing a water stub to the property to the north?
6. Flows to the north from the proposed flume should not be concentrated when they enter the
adjacent property. Drainage will be further evaluated upon detailed Engineering Review.
Additional comments may be generated upon detailed Engineering Review.