Appl. letter re Eng. commentsProvident Company, Inc.
REAL ESTATE SE[~VlCES
POST OFFICE BOX 1790
COPPELL, TEXAS 75019
TE~, (214) 215-9400
FAX (214) 276-1709
EMAIL gregyancey~verizon.net
November 19, 2005
Mr. Matt Steer
City Planner
City of Coppell
P. O. Box 9478
Coppell, Texas 75019
RE: Wynnpage Plaza I1 / SC1-Wyrmpage I & I1, LP
Dear Matt:
Regarding your letter dated November 9 about the above-referenced replat, please
consider our exception to the City's cond tion that we accept t.l),e engineering comments.
Engineering comment six should not be a condition for this re
sheet drainage to the Ardinger tract was satisfactorily resolved
City's instructions. Upon the request of the City engineering s
approval letter from Mr. Ardinger with his consent to allow th
Daniel of Nathan D. Maier Engineers represented Mr. Arding~
Engineering design which remains unchanged.
As indicated in the engineering comments throughout the orig
undertaken last spring, this issue was fully resolved with the C
Ardinger written consent. SCI-Wynnpage subsequently closed
upon the City's conditions.
1 attempted to resolve this matter with the engineer assigned tc
Mattina, explaining that the Engineering Department had appa
adding this comment which was included in your October 21 1
~lat. This issue regarding
six months ago per the
aft; we furnished an
,' drainage as drawn. Mike
r and approved the Bentley
hal replatting process
ity upon delivery of the
on the property relying
our project, Charleen La
'ently made a mistake by
:tter. She indicated that
there was no mistake and that the issue remains unresolved.
I explained that the Engineering Department was unreasonabl~ using this replat process
to create a new issue after closing. I asked that the comment bq removed prior to the City
Council meeting, but Charleen replied that she isn't the only or~e to decide the issue.
I was not asked to accept any conditions at the City Council n eeting prior to their vote
approving the replat. Had 1 been asked, I would have unequiw ~cally rejected this
interjection by the Engineering Department.
! ask that the City remove this condition and respond in writing that this issue is
completely resolved. We wish to break ground on this project ~ts soon as possible, adding
an additional $3 million dollars in value to the tax rolls. /
!
Si ~nc/erely yours,
cc: John Gesek
Jay Turner