Eng. response re Eng. comments T H E - C I T Y - 0 F
COP? i E
MEMORANDUM
TO:
CC:
FROM:
DATE:
REF:
Matt Steer, City Planner
Greg Yancey
Ken Griffin, Director of Engineering and Public WOrks
Charlene La Mattina, Graduate Engineer ~t~
November 30, 2005
Wynnpage Plaza II
This memorandum is in response to a letter from Greg Yanc~y dated November 19, 2005
regarding Engineering comments for the above referenced additiog.
The Engineering comment in question has been reviewed and its i~tent is clarified herein. The
property Association Agreement between Lots 1 R, 2, and 3 shoul~clearly describe that
stormwater runoff from Lot 2 is allowed to sheet flow across Lot ~to the discharge point.
Additionally, the maintenance responsibility for the discharge poims located on Lot 3 should be
shared by both lot owners.
This clarification has been conveyed verbally to Mr. Yancey via t41ephone conversation with Mr.
Griffin.