Loading...
Eng. response re Eng. comments T H E - C I T Y - 0 F COP? i E MEMORANDUM TO: CC: FROM: DATE: REF: Matt Steer, City Planner Greg Yancey Ken Griffin, Director of Engineering and Public WOrks Charlene La Mattina, Graduate Engineer ~t~ November 30, 2005 Wynnpage Plaza II This memorandum is in response to a letter from Greg Yanc~y dated November 19, 2005 regarding Engineering comments for the above referenced additiog. The Engineering comment in question has been reviewed and its i~tent is clarified herein. The property Association Agreement between Lots 1 R, 2, and 3 shoul~clearly describe that stormwater runoff from Lot 2 is allowed to sheet flow across Lot ~to the discharge point. Additionally, the maintenance responsibility for the discharge poims located on Lot 3 should be shared by both lot owners. This clarification has been conveyed verbally to Mr. Yancey via t41ephone conversation with Mr. Griffin.