Loading...
P&Z letter of approval 10/20/05COPPELL October 21, 2005 Mr. Greg Yancey SCI-Wynnpage I & I1, L.P. 722 S. Denton Tap Road, Suite 230 Coppell, TX 75019 RE: Wvnnl}aee Plaza North~ Lot IR, Block Bt Replat aPd Lots 2&3~ Block Bt Final Plat ' Dear Greg: This letter is to inform you that the Wynnpage Plaza North, ]Lot 1R, Block B Replat and Lots 2 and 3, Bock B, Final Plat, to allow the reconfigurati~bn of a fire lane and mutual access easement on Lot 1R, containing .68 of an acre of prol~_erty, the development of an approximate 16,000-square-foot tv, o-story building on Lot 21, containing 1.10 acres of property, and an approximate 3,500-square-foot one-storyi office building on Lot 3, containing 1.13 acres of property located along the west bide of Denton Tap Road, approximately 180 feet north of Wynnpage Drive, was recon~mended for approval by the Coppell Planning and Zoning Commission on Thursday, OctOber 20, 2005, subject to the following conditions: 1) Revise vicinity map to reflect entire property beiflg platted. 2) Submit verification if the Board of Ad. i ustment g}'ants the following variances to the Zoning Ordinance: a. Deleting the perimeter landscaping requirement for Lots I and 2, Block B. b. Allowing a minimum 11 i-side yard setback for Lot 2, Block B. c. Allowing a minimum 11 -fronl/side yard setback for Lot 1, Block B. 3) Provide a cross-parking agreement between these two properties. 4) Submit revised Site and Landscape Plans with proposed lot lines shown, if approved through the Board of Ad ustment procel~s. 5) Compliance with the attached Engineering comments The date scheduled for consideration by the Coppell City Council is Tuesday, November 8, 2005, at 7 p.m. A representative tbr this case must be present at this meeting, which will be held in Council Chmnbers at City }lall. Failure to represen~ this item may' result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department two (2) folded copies of revised plans on or before 12 noon~ Wednesday~ October 26th. Also, please submit one (1) 8 ~/2 x 11 paper reduction, along with one jpg, iiff, pdf or similar electronic file. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, Matt Steer City Planner Cc Marc Bentley, P.E., Bentley Engineering, Inc. Buildi.ng Inspection file _ OFFELL Pr~oject ID FP 05 0046 Address ?~ect Type_ Final Plat A~pplication Date 9/21/2005 Case Manaqer Matt Steer _Project Description CITY OF COPPELL 2nd DRC REPORT project I lame_ COFFEL WynnpagePlaza North Lot 1R,2Brock B, RP&IV, To allow the reconflgurahon of a fire !ane and mutual access easernen[ on 68 ~f an acre o p operty on Lot 1 R, and the development of an approxtmale 16000 squareJootlwo stoP/building on Lot2 containing 0acres of property, and an approximate 3,500-square-foot one story off~ce bu¢ldmg on Lot 3 on 1 13 acres of property A~ency Engineering 1 of 1 Comment_s 1 All utilities that cross property lines should be Io( 2 Provide a Property Association Agreement betw, maintenance of the shared utilities The agreemenl 3 The portion of the serwce line that provides wat~ located within a private utility easement ' 4 Locate the fire hydrant and FDC currently shown'on Lot 2 to the parking island located on the east side of the 24'x 29 5' Access Easement The ,;e should be placed within a private utility easement 5 What is the intent of providing a water stub to th( properly to the north? 6 Flows to the nodh from the proposed flume should not be concentrated when they enter the adjacent property Drainage will be further evaluate upon detailed Engineering Review Additional comments may be generated upon detail 9d Engineering Review. ated within private utility easements. ;eh Lots 1R, 2 and 3, Block B for the should include maintenance of the lift station r to Lot 2 and is located on Lot 3 should be