P&Z letter of approval 10/20/05COPPELL
October 21, 2005
Mr. Greg Yancey
SCI-Wynnpage I & I1, L.P.
722 S. Denton Tap Road, Suite 230
Coppell, TX 75019
RE: Wvnnl}aee Plaza North~ Lot IR, Block Bt Replat aPd
Lots 2&3~ Block Bt Final Plat '
Dear Greg:
This letter is to inform you that the Wynnpage Plaza North, ]Lot 1R, Block B Replat and
Lots 2 and 3, Bock B, Final Plat, to allow the reconfigurati~bn of a fire lane and mutual
access easement on Lot 1R, containing .68 of an acre of prol~_erty, the development of an
approximate 16,000-square-foot tv, o-story building on Lot 21, containing 1.10 acres of
property, and an approximate 3,500-square-foot one-storyi office building on Lot 3,
containing 1.13 acres of property located along the west bide of Denton Tap Road,
approximately 180 feet north of Wynnpage Drive, was recon~mended for approval by the
Coppell Planning and Zoning Commission on Thursday, OctOber 20, 2005, subject to the
following conditions:
1) Revise vicinity map to reflect entire property beiflg platted.
2)
Submit verification if the Board of Ad. i ustment g}'ants the following
variances to the Zoning Ordinance:
a. Deleting the perimeter landscaping requirement for Lots I and 2,
Block B.
b. Allowing a minimum 11 i-side yard setback for Lot 2, Block B.
c. Allowing a minimum 11 -fronl/side yard setback for Lot 1, Block B.
3) Provide a cross-parking agreement between these two properties.
4) Submit revised Site and Landscape Plans with proposed lot lines shown, if
approved through the Board of Ad ustment procel~s.
5) Compliance with the attached Engineering comments
The date scheduled for consideration by the Coppell City Council is Tuesday, November 8,
2005, at 7 p.m. A representative tbr this case must be present at this meeting, which will be
held in Council Chmnbers at City }lall. Failure to represen~ this item may' result in the
denial of this application. City Council has instructed staff to include in its agenda packets
only those items that accurately reflect conditions as recommended by the Planning and
Zoning Commission. Therefore, please submit to the Planning Department two (2) folded
copies of revised plans on or before 12 noon~ Wednesday~ October 26th. Also, please
submit one (1) 8 ~/2 x 11 paper reduction, along with one jpg, iiff, pdf or similar electronic
file.
If you have any questions, please contact the Planning Department at (972) 304-3678.
Sincerely,
Matt Steer
City Planner
Cc Marc Bentley, P.E., Bentley Engineering, Inc.
Buildi.ng Inspection
file
_ OFFELL
Pr~oject ID FP 05 0046
Address
?~ect Type_ Final Plat
A~pplication Date 9/21/2005
Case Manaqer Matt Steer
_Project Description
CITY OF COPPELL
2nd DRC REPORT
project I lame_
COFFEL
WynnpagePlaza North Lot 1R,2Brock B, RP&IV,
To allow the reconflgurahon of a fire !ane and mutual access easernen[ on 68 ~f an acre o p operty on Lot 1 R, and the
development of an approxtmale 16000 squareJootlwo stoP/building on Lot2 containing 0acres of property, and
an approximate 3,500-square-foot one story off~ce bu¢ldmg on Lot 3 on 1 13 acres of property
A~ency
Engineering
1 of 1
Comment_s
1 All utilities that cross property lines should be Io(
2 Provide a Property Association Agreement betw,
maintenance of the shared utilities The agreemenl
3 The portion of the serwce line that provides wat~
located within a private utility easement '
4 Locate the fire hydrant and FDC currently shown'on Lot 2 to the parking island located on the
east side of the 24'x 29 5' Access Easement The ,;e should be placed within a private utility
easement
5 What is the intent of providing a water stub to th( properly to the north?
6 Flows to the nodh from the proposed flume should not be concentrated when they enter the
adjacent property Drainage will be further evaluate upon detailed Engineering Review
Additional comments may be generated upon detail 9d Engineering Review.
ated within private utility easements.
;eh Lots 1R, 2 and 3, Block B for the
should include maintenance of the lift station
r to Lot 2 and is located on Lot 3 should be