Loading...
DRC commentsCOl'FELL COPPELL ProiectlD FP-05-0046 Address Project Type Application Date Case Manager Proiect Descrintion Agency Building Inspection Electric and Gas Engineering CITY OF COPPELL DRC REPORT Project N~ Final Plat 9/21/2005 Matt Steer TO allow the reconfiguration of a fire lane and mutual access easement on .68 ( development of an approximate 16,000-square-foot two-story building on Lot 2 an approximate 3,500-square-foot one-story office building on Lot 3 on 1.13 ac~ 1 of Reviewed By Review Date Greg Jones 9/26/2005 Jeff Curry 9/30/2005 Charlene La Mattina 9~29~2005 Fire Administration Tim nates 9/27/2005 Parks and Recreation John Elias 9/27/2005 Planning Department Matt Steer 9/29/2005 1. No cor Plat Unac 972-323-~ 1. All utilit located w 2. Provide Lots 1 R, ,; shared uti rnaintenal 3. The po Lot 2 anc a private 4. Locate Lot 2 to ti' the 24' x; placed wi' 5. What i.~ property t 6. Flows t not be co~ property. detailed E Additiona Engineer No corem No corem 1. Revise platted. 2. Becau., recomme Adjustme Zoning O a. Perim me Wynnpage Plaza North, Lot 1R, 2 Block B, RP & r, f an acre of property on Lot 1R, and the containing 1.10 acres of property, and .~s of property. tments made. ;eptable, Please contact Larry Redick at 917 to discuss easement requirements. 9s that cross property lines should be lhin private utility easements. a Property Association Agreement between and 3, Block B for the maintenance of the ities. The agreement should include ce of the lift station. lion of the service line that provides water to is located on Lot 3 should be located within Jtility easement. :he fire hydrant and FDC currently shown on 9 parking island located on the east side of 9.5' Access Easement. These should be bin a private utility easement. the intent of providing a water stub to the ) the north? ) the north from the proposed flume should ~centrated when they enter the adjacent )rainage will be further evaluated upon ngineering Review. comments may be generated upon detailed ng Review. mrs. vicinity map to reflect entire property being e this is an irregularly shaped lot, we can ~d approval, subject to the Board of it granting the following variances to the dinance: .~ter landscaping variance. b. Side ~ard setback requirements. 3. The applicant will be required to provide a cross parking a~]reement between these two properties. 4. Submitlrevised site and landscape plans with proposedllot lines shown, Jf approved through the Board of Adjustment.