DRC commentsCOl'FELL
COPPELL
ProiectlD FP-05-0046
Address
Project Type
Application Date
Case Manager
Proiect Descrintion
Agency
Building Inspection
Electric and Gas
Engineering
CITY OF COPPELL
DRC REPORT
Project N~
Final Plat
9/21/2005
Matt Steer
TO allow the reconfiguration of a fire lane and mutual access easement on .68 (
development of an approximate 16,000-square-foot two-story building on Lot 2
an approximate 3,500-square-foot one-story office building on Lot 3 on 1.13 ac~
1 of
Reviewed By Review Date
Greg Jones 9/26/2005
Jeff Curry 9/30/2005
Charlene La Mattina 9~29~2005
Fire Administration Tim nates 9/27/2005
Parks and Recreation John Elias 9/27/2005
Planning Department Matt Steer 9/29/2005
1. No cor
Plat Unac
972-323-~
1. All utilit
located w
2. Provide
Lots 1 R, ,;
shared uti
rnaintenal
3. The po
Lot 2 anc
a private
4. Locate
Lot 2 to ti'
the 24' x;
placed wi'
5. What i.~
property t
6. Flows t
not be co~
property.
detailed E
Additiona
Engineer
No corem
No corem
1. Revise
platted.
2. Becau.,
recomme
Adjustme
Zoning O
a. Perim
me
Wynnpage Plaza North, Lot 1R, 2 Block B, RP & r,
f an acre of property on Lot 1R, and the
containing 1.10 acres of property, and
.~s of property.
tments made.
;eptable, Please contact Larry Redick at
917 to discuss easement requirements.
9s that cross property lines should be
lhin private utility easements.
a Property Association Agreement between
and 3, Block B for the maintenance of the
ities. The agreement should include
ce of the lift station.
lion of the service line that provides water to
is located on Lot 3 should be located within
Jtility easement.
:he fire hydrant and FDC currently shown on
9 parking island located on the east side of
9.5' Access Easement. These should be
bin a private utility easement.
the intent of providing a water stub to the
) the north?
) the north from the proposed flume should
~centrated when they enter the adjacent
)rainage will be further evaluated upon
ngineering Review.
comments may be generated upon detailed
ng Review.
mrs.
vicinity map to reflect entire property being
e this is an irregularly shaped lot, we can
~d approval, subject to the Board of
it granting the following variances to the
dinance:
.~ter landscaping variance.
b. Side ~ard setback requirements.
3. The applicant will be required to provide a cross
parking a~]reement between these two properties.
4. Submitlrevised site and landscape plans with
proposedllot lines shown, Jf approved through the
Board of Adjustment.