P&Z letter of approval 3/17/05T H E i C i T Y , o ~
COPPELL
March 18, 2005
Mr. John Gesek
Silverhawk Capital, Inc.
722 S. Denton Tap Road, Suite 220
Coppell, TX 75019
RE: Wynnoage Plaza North~ Lot 2~ Block Bt Site Plan
Dear John:
This letter is to inform you that the Wynnpage Plaza North, Lot 2,
development of an approximate 3,500-square-foot one-story offi(
16,000-square-foot two-story building on 2.234 acres of property
Denton Tap Road, approximately 180 feet north of Wynnpage
approval by the Coppell Planning and Zoning Commission on Th~
to the following conditions:
Block B, Site Plan., to allow the
e building and an approximate
located along the west side of
Drive, was recommended for
trsday, March 17, 2005, subject
1) Ensure the lighting meets the glare and lighting standhrds of the Zoning
Ordinance.
2) Showy how' the sidewalk ties in with the parking area ~n the east
side of the westernmost building.
3) Provide a tree between the westernmost bmld]ng and lhe carport, as one
is required at the end of each parking bay.
4) Ensure 6' screening wall does not conflict with any existing utilities
within the alley.
5) Depict the distance between the drive north of this prc~perty and the drive
located along the eastern property line.
6)
Coordinate with Lone Star Gas for permission to have the parking spaces,
fire lane and mutual access drive crossing the 50' Lon~ Star Gas easement.
7) The attached signs are depicted at 14" maximum height. Note that the
sign widths shall not extend beyond the axvning widih.
8)
Include a legend within the black and white elevatiohs outlining the
building materials.
9) Compliance with the attached Engineering and Fire Department comments.
The date scheduled for consideration by the Coppell City Council ils Tuesday, April 12, 2005, at 7
p.m. A representative for this case nurst be present at this meeting, which will be held in Council
Chambers at City Hall. Failure to represent this item may result lin the denial of this application.
City Council has instructed staff to include in its agenda packets only those items that accurately
reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please
submit to the Planning Department three (3) folded copies of ali revised plans on or before 12
noon~ Wednesdav~ March 30th. Also, please submit one (1) 8 V2 ~ 11 paper reduction, along wi'~
one jpg, tiff, pdf or similar electronic file.
If you have any questions, please contact the Planning Department at (972) 304-3678.
Sincerely,
Marcie D}amond
Assistant Director of Planning
Attachment
Cc Greg Yancey, Provident Company, Inc.
Bob Anderson, Plan Solutions
Building Inspection
file
.,OFFELL
P_ r_ole<=t ED SPA-05q3005
Address 305 S Def~lon Tap Rd
CITY OF COPPELL
Znd DRC REPOR1
Proied Ni
Project Type
Application Date
Case Manaqer
_Project Descriptmn_
S~te Plan Approval
715/2005
Mat1 Steer
to allow the development of an appro~mate 3,500 square-foot one-story office bu
square-foot two- story building
Agen_c~
Fire Administration
Engineering
1 of 1
Comments
1. indicate fire hydrant and FDC locations; must be
same s~de of the fire lane
Site Plan:
Sheet C2:
1 Does the agreement with the property owner to t
proposed from the flume?
Sheet C3:
1 Show location of FDC and minimum 4 ' diameter
as the F.H.
Additional requirements may be identified during fu
COFFELL
rne Wynnpage Plaza North, Lot 2, Block
Iding, and an approximate 16,000
vithin 50 feet of each other and on the
nodh allow concentration of flow as
ping FDC shall be on same side of fire lane
engineering plan review.