Loading...
P&Z letter of approval 3/17/05T H E i C i T Y , o ~ COPPELL March 18, 2005 Mr. John Gesek Silverhawk Capital, Inc. 722 S. Denton Tap Road, Suite 220 Coppell, TX 75019 RE: Wynnoage Plaza North~ Lot 2~ Block Bt Site Plan Dear John: This letter is to inform you that the Wynnpage Plaza North, Lot 2, development of an approximate 3,500-square-foot one-story offi( 16,000-square-foot two-story building on 2.234 acres of property Denton Tap Road, approximately 180 feet north of Wynnpage approval by the Coppell Planning and Zoning Commission on Th~ to the following conditions: Block B, Site Plan., to allow the e building and an approximate located along the west side of Drive, was recommended for trsday, March 17, 2005, subject 1) Ensure the lighting meets the glare and lighting standhrds of the Zoning Ordinance. 2) Showy how' the sidewalk ties in with the parking area ~n the east side of the westernmost building. 3) Provide a tree between the westernmost bmld]ng and lhe carport, as one is required at the end of each parking bay. 4) Ensure 6' screening wall does not conflict with any existing utilities within the alley. 5) Depict the distance between the drive north of this prc~perty and the drive located along the eastern property line. 6) Coordinate with Lone Star Gas for permission to have the parking spaces, fire lane and mutual access drive crossing the 50' Lon~ Star Gas easement. 7) The attached signs are depicted at 14" maximum height. Note that the sign widths shall not extend beyond the axvning widih. 8) Include a legend within the black and white elevatiohs outlining the building materials. 9) Compliance with the attached Engineering and Fire Department comments. The date scheduled for consideration by the Coppell City Council ils Tuesday, April 12, 2005, at 7 p.m. A representative for this case nurst be present at this meeting, which will be held in Council Chambers at City Hall. Failure to represent this item may result lin the denial of this application. City Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department three (3) folded copies of ali revised plans on or before 12 noon~ Wednesdav~ March 30th. Also, please submit one (1) 8 V2 ~ 11 paper reduction, along wi'~ one jpg, tiff, pdf or similar electronic file. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, Marcie D}amond Assistant Director of Planning Attachment Cc Greg Yancey, Provident Company, Inc. Bob Anderson, Plan Solutions Building Inspection file .,OFFELL P_ r_ole<=t ED SPA-05q3005 Address 305 S Def~lon Tap Rd CITY OF COPPELL Znd DRC REPOR1 Proied Ni Project Type Application Date Case Manaqer _Project Descriptmn_ S~te Plan Approval 715/2005 Mat1 Steer to allow the development of an appro~mate 3,500 square-foot one-story office bu square-foot two- story building Agen_c~ Fire Administration Engineering 1 of 1 Comments 1. indicate fire hydrant and FDC locations; must be same s~de of the fire lane Site Plan: Sheet C2: 1 Does the agreement with the property owner to t proposed from the flume? Sheet C3: 1 Show location of FDC and minimum 4 ' diameter as the F.H. Additional requirements may be identified during fu COFFELL rne Wynnpage Plaza North, Lot 2, Block Iding, and an approximate 16,000 vithin 50 feet of each other and on the nodh allow concentration of flow as ping FDC shall be on same side of fire lane engineering plan review.