Loading...
Metal bldgs. Structural Report STRUCTURAL REPORT FOR PRE-ENGINEERED METAL BUILDINGS LOCATED IN COPPELL, TEXAS OWNERS JOHNNY J. E. THOMPSON, ADRIAN F. MOORE, AND STEVE KIMBREL PREPARED BY TRANS TEXAS CONSULTANTS SURVEYING AND ENGINEERING DALLAS, TEXAS ~ ! '"'~ NOVEMBER 26, 1991 STRUCTURAL REPORT FOR PRE-ENGINEERED METAL BUILDINGS LOCATED IN COPPELL, TEX~S OWNERS JOHNNY J. E. THOMPSON, ADRIAN F. MOORE, AND STEVE KIMBREL INDEX I. Introduction II. Building No. 1. A. General description. B. Main building framing. C. Lean-to framing. D. Extension framing. E. Floor and foundation. III. Building No. 2. A. General description. B. Building framing. C. Floor and foundation. IV. Building No. 3. A. General description. B. Building framing. C. Floor and foundation. V. Conclusion. APPENDIX A. Capacity chart-Building No. 1. B. Capacity chart-Building No. 2. C. Capacity chart-Building No 3. STRUCTUI~L REPORT FOR PRE-EN~NEEREDI,~ET~L BUiLDiNgS LOC&TED IN COPPELL, TEX~S I. Introduction. A site assessment was performed on November 23, 1991, to determine the structural conditions of the buildings located on a 10.059 acre tract of land located on Beltline Road at the Elm Fork of the Trinity River, in Coppell, Dallas County, Texas. The property is owned by Johnny J. E. Thompson, Adrian F. Moore, and Steve Kimbrel. The buildings are numbered as shown on Exhibit "A" attached hereto for simplification of identification. II. Building No. 1. A. General description. Building No. 1 is a pre-engineered metal building measuring 60'x 60' with a 27'-6" eave height and a 30'-0" ridge height with a 30' lean-to constructed on the easterly side and an extension of 3 bays constructed on the northerly side. The lean-to has an eave height of 12'-0" with a ridge height of 14'-6" and the extension has an eave height of 16'-0" with a ridge height of 18'-5". The building is constructed on a concrete foundation and floor slab. The super-structure and all components are in generally good structural condition. There is no evidence of foundation failure, and the floor is level, integral, and surface tight. B. Main building framing. The structural framing for the main building consists of 50 ksi yield steel tapered columns with rigid connection to 50 ksi yield steel tapered beams at frame lines 2 and 3. The columns have 1/2" A-36 steel base plates designed for shear and bearing transfer welded to steel plates embedded in the concrete foundation. The beams have rigid connections at the eaves and at the ridge line and have 1 on 12 roof slope. The end frames have W8x13, 50 ksi yield steel columns at frame lines 1 and 4 with 1/2" A-36 steel base plates anchor bolted to the foundation. The wall girts are 8"x2 1/2" 16 gauge, 55 ksi yield steel zee's at less than 6' spacing with double girts at the mid-height of the building. The roof purlins are 8"x 2 1/2" 16 gauge, 55 ksi yield steel zee's at less than 6' spacing with short laps and with double girts at the roof quarter points. The building is diagonally braced in the middle bay in the west wall and roof with 1/2" A-36 steel round bar. The metal skin consists of 36" wide "A" type 26 gauge, 80 ksi yield steel panels on the walls and on the roof. The structural components are generally in good condition except for the inside flange of the west column at framing line 3, as shown on Exhibit "B". The flange is buckled at about 4' above finish floor and should be repaired prior to occupancy. C. Lean-to framing. The lean-to framing consists of WSx28, 50 ksi yield steel columns with 1/2" A-36 steel base plates anchor bolted to the concrete foundation and rigidly connected to S15x50, 50 ksi yield steel roof beams on 1 on 12 pitch at framing lines 2 and 3. The end framing at lines 1 and 4 consists of 8"x4", 14 gauge, 55 ksi yield steel structural cee's. Wall girts consist of 8"x2 1/2", 16 gauge, 55 ksi yield steel zee's and are located at 8" and 7'-4" above finish floor. The roof purlins consist of short lap 8"x2 1/2", 16 gauge, 55 ksi yield steel zee's and are on less than 6' spacing. The metal skin consists of 36" wide "A" type, 26 gauge, 80 ksi yield steel panels on the walls and on the roof. The structural components are in good condition. D. Extension framing. The building extension consists of 50 ksi yield steel tapered columns with bases anchor bolted to the concrete foundation and rigidly connected to tapered 50 ksi yield steel roof beams at the two interior framing lines. The roof beams have 1 on 12 slopes with rigid connections at the ridge line. The end wall framing consists of 8"x 4", 14 gauge, 55 ksi yield steel cee's anchor bolted to the concrete foundation. The wall girts are located at the building mid-height and consist of 8"x2 1/2", 16 gauge, 55 ksi yield steel zee's. The roof purlins are short lap 8"x2 1/2", 16 gauge, 55 ksi yield steel zee's on less than 6' spacing. The metal skin consists of 36" wide "A" type, 26 gauge, 80 ksi yield steel panels on the walls and on the roof. The structural components are in good condition. E. Floor and foundation. The floor and foundation of building No. 1 is steel reinforced concrete approximately 2900 psi minimum strength, level, integral and with a tight even surface. There are no visible cracks on the floor and no evidence of foundation settlement. The floor has carried light truck and vehicle traffic without displacement or damage. III. Building No. 2. A. General description. Building No. 2 is a pre-engineered metal building measuring 50'x 280' with a 16'-0" eave height and an 18'-0" ridge height constructed on a concrete foundation and floor slab. The super-structure and all components are in good structural condition. There is no evidence of foundation failure, and the floor is level, integral, and surface tight. B. Building framing. The structural framing of Building No. 2 consists of 50 ksi yield steel tapered columns on 20' spacing, anchor bolted to the concrete foundation and rigidly connected to S15x50 50 ksi yield steel roof beams which are rigidly connected at the ridge line. The end wall framing consists of 8"x4" 14 gauge, 55 ksi yield steel cee's anchor bolted to the concrete foundation. The wall girts are located at the mid-height of the building and consist of 8"x2 1/2" 16 gauge, 55 ksi yield steel zee's. The roof purlins consist of 8"x2 1/2" 16 gauge, 55 ksi yield steel zee's located at less than 6' spacing. The metal skin consists of 36" wide "R" type, 26 gauge, 80 ksi yield steel panels on the walls and on the roof. The structural components are in good condition. C. Floor and foundation. The floor and foundation of Building No. 2 is steel reinforced concrete approximately 2900 psi minimum strength, level, integral and with a tight even surface. There is no evidence of foundation settlement. The floor has carried light truck and vehicle traffic without displacement or damage. IV. Building No. 3. A. General description. Building No. 3 is a pre-engineered metal building measuring 50'x 200' with a 16'-0" eave height and an 18'-0" ridge height constructed on a concrete foundation and floor slab. The su~er-structure and all components are in good structural condition. There is no evidence of foundation failure, and the floor is level, integral, and surface tight. B. Building framing. The structural framing of Building No. 3 consists of 50 ksi yield steel tapered columns on 25' spacing, anchor bolted to the foundation and rigidly connected to S15x50 50 ksi yield steel roof beams which are rigidly connected at the ridge line. The end wall framing consists of $"x4" 14 gauge, 55 ksi yield steel cee's anchor bolted to the concrete foundation. The wall girts are located at the mid-height of the building and consist of 8"x2 1/2" 16 gauge, 55 ksi yield steel zee's. The roof purlins consist of 8"x2 1/2" 16 gauge, 55 ksi yield steel zee's located at less than 6' spacing. The metal skin consists of 36" wide "R" type, 26 gauge, 80 ksi yield steel panels on the walls and on the roof. The structural components are in good condition. C. Floor and foundation. The floor and foundation of Building No. 3 is steel reinforced concrete a~proximately 2900 psi minimum strength, level, integral and with a tight even surface. There are no visible cracks on the floor and no evidence of foundation settlement. The floor has carried light truck and vehicle traffic without displacement or damage. V. Conclusion. The site assessment conducted on November 23, 1991, revealed three metal buildings on a 10.059 acre site on the north side of Beltline Road just west of the Elm Fork of the Trinity River in Coppell, Texas, which were in good structural condition with the exception of slight buckling found on the lower portion of the west building column of Building No. 1 at framing line 3 as shown on attached Exhibit "A". The concrete foundations and floor slabs were all in good condition without any evidence of foundation settlement or concrete deterioration. It is only necessary that the damaged column be repaired by replacing the damaged portion with a new undamaged portion of column or repairing the damage by reinforcing the buckled flange with two sections of 3"x3"x3/8" 50 ksi yield steel angles welded at the damaged portion and extending 12" minimum beyond the damage. I hereby certify on this 26th day of November, 1991, that this report is a true and correct evaluation of the structural integrity of the buildings found at the site as determined by my personal inspection and evaluation. Xavier Chapa~ P.E. date ~ ~ ~' ~.,..~ Appendix A. Capacity Chart for Building No. 1. Item. Description Allowable loads metal skin 26 ga, "A" panels 80 ksi yield steel roof ,, 20 psf walls ,, 20 psf wall girts 14 ga. 8"x2 1/2" 138 plf 55 ksi yield steel zee's roof purlins 14 ga. 8"x2 1/2" 138 plf 55 ksi yield steel zee's end wall framing 14 ga. 8x4C 55 ksi 150 plf yield steel cee's main bay framing 55 ksi yield steel 240 plf 6"x3/$" flange tapered column and beams foundation and slab 2900 psi concrete 6000 psf reinforced with No. 4 Gr. 40 rebar Maximum wind and live load anticipated for Dallas County is 20 psf wind and live load. Appendix B. Capacity Chart for Building No. 2. Item. Description Allowable loads metal skin 26 ga, "A" panels 80 ksi yield steel roof " 20 psf walls " 20 psf wall girts 14 ga. 8"x2 1/2" 138 plf 55 ksi yield steel zee's roof purlins 14 ga. 8"x2 1/2" 138 plf 55 ksi yield steel zee's end wall framing 14 ga. 8x4C 55 ksi 150 plf yield steel cee's main bay framing 55 ksi yield steel 240 plf 6"x3/8" flange tapered column and beams foundation and slab 2900 psi concrete 6000 psf reinforced with No. 4 Gr. 40 rebar Maximum wind and live load anticipated for Dallas County is 20 psf wind and live load. Appendix C. Capacity Chart for Building No. 3. Item. Description Allowable loads metal skin 26 ga, "A" panels 80 ksi yield steel roof " 20 psf walls " 20 psf wall girts 14 ga. 8"x2 1/2" 138 plf 55 ksi yield steel zee's roof purlins 14 ga. 8"x2 1/2" 138 plf 55 ksi yield steel zee's end wall framing 14 ga. 8x4C 55 ksi 150 plf yield steel cee's main bay framing 55 ksi yield steel 240 plf 6"x3/8" flange tapered column and beams foundation and slab 2900 psi concrete 6000 psf reinforced with No. 4 Gr. 40 rebar Maximum wind and live load anticipated for Dallas County is 20 psf wind and live load.