Metal bldgs. Structural Report STRUCTURAL REPORT
FOR
PRE-ENGINEERED METAL BUILDINGS
LOCATED IN
COPPELL, TEXAS
OWNERS
JOHNNY J. E. THOMPSON, ADRIAN F. MOORE,
AND STEVE KIMBREL
PREPARED BY
TRANS TEXAS CONSULTANTS
SURVEYING AND ENGINEERING
DALLAS, TEXAS
~ ! '"'~
NOVEMBER 26, 1991
STRUCTURAL REPORT
FOR
PRE-ENGINEERED METAL BUILDINGS
LOCATED IN
COPPELL, TEX~S
OWNERS
JOHNNY J. E. THOMPSON, ADRIAN F. MOORE,
AND STEVE KIMBREL
INDEX
I. Introduction
II. Building No. 1.
A. General description.
B. Main building framing.
C. Lean-to framing.
D. Extension framing.
E. Floor and foundation.
III. Building No. 2.
A. General description.
B. Building framing.
C. Floor and foundation.
IV. Building No. 3.
A. General description.
B. Building framing.
C. Floor and foundation.
V. Conclusion.
APPENDIX
A. Capacity chart-Building No. 1.
B. Capacity chart-Building No. 2.
C. Capacity chart-Building No 3.
STRUCTUI~L REPORT
FOR
PRE-EN~NEEREDI,~ET~L BUiLDiNgS
LOC&TED IN
COPPELL, TEX~S
I. Introduction.
A site assessment was performed on November 23, 1991, to
determine the structural conditions of the buildings located
on a 10.059 acre tract of land located on Beltline Road at
the Elm Fork of the Trinity River, in Coppell, Dallas County,
Texas. The property is owned by Johnny J. E. Thompson,
Adrian F. Moore, and Steve Kimbrel. The buildings are
numbered as shown on Exhibit "A" attached hereto for
simplification of identification.
II. Building No. 1.
A. General description.
Building No. 1 is a pre-engineered metal building measuring
60'x 60' with a 27'-6" eave height and a 30'-0" ridge height
with a 30' lean-to constructed on the easterly side and an
extension of 3 bays constructed on the northerly side. The
lean-to has an eave height of 12'-0" with a ridge height of
14'-6" and the extension has an eave height of 16'-0" with a
ridge height of 18'-5". The building is constructed on a
concrete foundation and floor slab. The super-structure and
all components are in generally good structural condition.
There is no evidence of foundation failure, and the floor is
level, integral, and surface tight.
B. Main building framing.
The structural framing for the main building consists of 50
ksi yield steel tapered columns with rigid connection to 50
ksi yield steel tapered beams at frame lines 2 and 3. The
columns have 1/2" A-36 steel base plates designed for shear
and bearing transfer welded to steel plates embedded in the
concrete foundation. The beams have rigid connections at the
eaves and at the ridge line and have 1 on 12 roof slope. The
end frames have W8x13, 50 ksi yield steel columns at frame
lines 1 and 4 with 1/2" A-36 steel base plates anchor bolted
to the foundation. The wall girts are 8"x2 1/2" 16 gauge, 55
ksi yield steel zee's at less than 6' spacing with double
girts at the mid-height of the building. The roof purlins
are 8"x 2 1/2" 16 gauge, 55 ksi yield steel zee's at less
than 6' spacing with short laps and with double girts at the
roof quarter points. The building is diagonally braced in
the middle bay in the west wall and roof with 1/2" A-36 steel
round bar. The metal skin consists of 36" wide "A" type 26
gauge, 80 ksi yield steel panels on the walls and on the
roof.
The structural components are generally in good condition
except for the inside flange of the west column at framing
line 3, as shown on Exhibit "B". The flange is buckled at
about 4' above finish floor and should be repaired prior to
occupancy.
C. Lean-to framing.
The lean-to framing consists of WSx28, 50 ksi yield steel
columns with 1/2" A-36 steel base plates anchor bolted to the
concrete foundation and rigidly connected to S15x50, 50 ksi
yield steel roof beams on 1 on 12 pitch at framing lines 2
and 3. The end framing at lines 1 and 4 consists of 8"x4",
14 gauge, 55 ksi yield steel structural cee's. Wall girts
consist of 8"x2 1/2", 16 gauge, 55 ksi yield steel zee's and
are located at 8" and 7'-4" above finish floor. The roof
purlins consist of short lap 8"x2 1/2", 16 gauge, 55 ksi
yield steel zee's and are on less than 6' spacing. The metal
skin consists of 36" wide "A" type, 26 gauge, 80 ksi yield
steel panels on the walls and on the roof.
The structural components are in good condition.
D. Extension framing.
The building extension consists of 50 ksi yield steel tapered
columns with bases anchor bolted to the concrete foundation
and rigidly connected to tapered 50 ksi yield steel roof
beams at the two interior framing lines. The roof beams have
1 on 12 slopes with rigid connections at the ridge line. The
end wall framing consists of 8"x 4", 14 gauge, 55 ksi yield
steel cee's anchor bolted to the concrete foundation. The
wall girts are located at the building mid-height and consist
of 8"x2 1/2", 16 gauge, 55 ksi yield steel zee's. The roof
purlins are short lap 8"x2 1/2", 16 gauge, 55 ksi yield steel
zee's on less than 6' spacing. The metal skin consists of
36" wide "A" type, 26 gauge, 80 ksi yield steel panels on the
walls and on the roof.
The structural components are in good condition.
E. Floor and foundation.
The floor and foundation of building No. 1 is steel
reinforced concrete approximately 2900 psi minimum strength,
level, integral and with a tight even surface. There are no
visible cracks on the floor and no evidence of foundation
settlement. The floor has carried light truck and vehicle
traffic without displacement or damage.
III. Building No. 2.
A. General description.
Building No. 2 is a pre-engineered metal building measuring
50'x 280' with a 16'-0" eave height and an 18'-0" ridge
height constructed on a concrete foundation and floor slab.
The super-structure and all components are in good structural
condition. There is no evidence of foundation failure, and
the floor is level, integral, and surface tight.
B. Building framing.
The structural framing of Building No. 2 consists of 50 ksi
yield steel tapered columns on 20' spacing, anchor bolted to
the concrete foundation and rigidly connected to S15x50 50
ksi yield steel roof beams which are rigidly connected at the
ridge line. The end wall framing consists of 8"x4" 14 gauge,
55 ksi yield steel cee's anchor bolted to the concrete
foundation. The wall girts are located at the mid-height of
the building and consist of 8"x2 1/2" 16 gauge, 55 ksi yield
steel zee's. The roof purlins consist of 8"x2 1/2" 16 gauge,
55 ksi yield steel zee's located at less than 6' spacing.
The metal skin consists of 36" wide "R" type, 26 gauge, 80
ksi yield steel panels on the walls and on the roof.
The structural components are in good condition.
C. Floor and foundation.
The floor and foundation of Building No. 2 is steel
reinforced concrete approximately 2900 psi minimum strength,
level, integral and with a tight even surface. There is no
evidence of foundation settlement. The floor has carried
light truck and vehicle traffic without displacement or
damage.
IV. Building No. 3.
A. General description.
Building No. 3 is a pre-engineered metal building measuring
50'x 200' with a 16'-0" eave height and an 18'-0" ridge
height constructed on a concrete foundation and floor slab.
The su~er-structure and all components are in good structural
condition. There is no evidence of foundation failure, and
the floor is level, integral, and surface tight.
B. Building framing.
The structural framing of Building No. 3 consists of 50 ksi
yield steel tapered columns on 25' spacing, anchor bolted to
the foundation and rigidly connected to S15x50 50 ksi yield
steel roof beams which are rigidly connected at the ridge
line. The end wall framing consists of $"x4" 14 gauge, 55
ksi yield steel cee's anchor bolted to the concrete
foundation. The wall girts are located at the mid-height of
the building and consist of 8"x2 1/2" 16 gauge, 55 ksi yield
steel zee's. The roof purlins consist of 8"x2 1/2" 16 gauge,
55 ksi yield steel zee's located at less than 6' spacing.
The metal skin consists of 36" wide "R" type, 26 gauge, 80
ksi yield steel panels on the walls and on the roof.
The structural components are in good condition.
C. Floor and foundation.
The floor and foundation of Building No. 3 is steel
reinforced concrete a~proximately 2900 psi minimum strength,
level, integral and with a tight even surface. There are no
visible cracks on the floor and no evidence of foundation
settlement. The floor has carried light truck and vehicle
traffic without displacement or damage.
V. Conclusion.
The site assessment conducted on November 23, 1991, revealed
three metal buildings on a 10.059 acre site on the north side
of Beltline Road just west of the Elm Fork of the Trinity
River in Coppell, Texas, which were in good structural
condition with the exception of slight buckling found on the
lower portion of the west building column of Building No. 1
at framing line 3 as shown on attached Exhibit "A". The
concrete foundations and floor slabs were all in good
condition without any evidence of foundation settlement or
concrete deterioration.
It is only necessary that the damaged column be repaired by
replacing the damaged portion with a new undamaged portion of
column or repairing the damage by reinforcing the buckled
flange with two sections of 3"x3"x3/8" 50 ksi yield steel
angles welded at the damaged portion and extending 12"
minimum beyond the damage.
I hereby certify on this 26th day of November, 1991, that
this report is a true and correct evaluation of the
structural integrity of the buildings found at the site as
determined by my personal inspection and evaluation.
Xavier Chapa~ P.E. date ~ ~ ~' ~.,..~
Appendix A.
Capacity Chart for Building No. 1.
Item. Description Allowable loads
metal skin 26 ga, "A" panels
80 ksi yield steel
roof ,, 20 psf
walls ,, 20 psf
wall girts 14 ga. 8"x2 1/2" 138 plf
55 ksi yield steel
zee's
roof purlins 14 ga. 8"x2 1/2" 138 plf
55 ksi yield steel
zee's
end wall framing 14 ga. 8x4C 55 ksi 150 plf
yield steel cee's
main bay framing 55 ksi yield steel 240 plf
6"x3/$" flange
tapered column and
beams
foundation and slab 2900 psi concrete 6000 psf
reinforced with
No. 4 Gr. 40 rebar
Maximum wind and live load anticipated for Dallas County is
20 psf wind and live load.
Appendix B.
Capacity Chart for Building No. 2.
Item. Description Allowable loads
metal skin 26 ga, "A" panels
80 ksi yield steel
roof " 20 psf
walls " 20 psf
wall girts 14 ga. 8"x2 1/2" 138 plf
55 ksi yield steel
zee's
roof purlins 14 ga. 8"x2 1/2" 138 plf
55 ksi yield steel
zee's
end wall framing 14 ga. 8x4C 55 ksi 150 plf
yield steel cee's
main bay framing 55 ksi yield steel 240 plf
6"x3/8" flange
tapered column and
beams
foundation and slab 2900 psi concrete 6000 psf
reinforced with
No. 4 Gr. 40 rebar
Maximum wind and live load anticipated for Dallas County is
20 psf wind and live load.
Appendix C.
Capacity Chart for Building No. 3.
Item. Description Allowable loads
metal skin 26 ga, "A" panels
80 ksi yield steel
roof " 20 psf
walls " 20 psf
wall girts 14 ga. 8"x2 1/2" 138 plf
55 ksi yield steel
zee's
roof purlins 14 ga. 8"x2 1/2" 138 plf
55 ksi yield steel
zee's
end wall framing 14 ga. 8x4C 55 ksi 150 plf
yield steel cee's
main bay framing 55 ksi yield steel 240 plf
6"x3/8" flange
tapered column and
beams
foundation and slab 2900 psi concrete 6000 psf
reinforced with
No. 4 Gr. 40 rebar
Maximum wind and live load anticipated for Dallas County is