Loading...
PL-Building Elevationsv Z O Z m 9o0c 9@b kXRD I INCA i'3ta11_i71NCs 14 EXISTING MASONRY EXISTING CANOPY T( AS REQUIRED FOR N EXISTING BUILDING I EXISTING DOORS TO EXISTING WINDOWS Te., ems... „a, AXIS [ INCY E3tal!_ PINCt IU NEW ROOF TO MATCH H' SLOPE TO DRAINAGE Z EXISTING CANOPY TO f AS REQUIRED FOR NEW INSTALL NEW BRICK 0 STUD FRAMING. REF W SHEET A5. NEW EXTER EXISTING MATERIALS EXISTING %%'wo;"I"L0000)E"'H �. '; /' %Now&, NEW EiLat`t VAT I ON 04 EXISTING MA50NRY TC EXISTING CANOPY TO AS REQUIRED FOR NE EXISTING WINDOWS TC EXISTING MASONRY C, SUPPORT COLUMNS TC 05 EX15TING FRONT ELEVATION 0 EXISTING BUILDING TO REMAIN NEW ROOF TO MATCH HT_ OF EXISTING AND SLOPE TO DRAINAGE AT REAR OF BUILDING EXISTING CANOPY TO REMAIN — MODIFY AS REQUIRED FOR NEW CONSTRUCTION ___--_...___—.__—.._._—_._._—___—.__ € € EXISTING CANOPY TO REMAIN I I — MODIFY AS REQUIRED FOR I I NEW CONSTRUCTION I € I € I € INSTALL NEW 5RICK OVER SHEATHING j B AND STUD FRAMING. REF WALL SECTION € 1 4 DETAILS SHEET A5. NEW EXTERIOR I € SHALL MATCH EXISTING MATERIALS I l I € I € I I ! 1 6 € III AWL NEW FRONT ELEVATION A-5.13 ---------------------------- -------------- ______________._.______—___— € , € € l € € I € I i € € € € l 1 € I € € I l f I I 6 € l € € I € i i € € l 1 € t.O. 51..,43 INSTALL NEW 5RICK OVER SHEATHING AND STUD FRAMING. REF WALL SECTION # DETAILS SHEET A5. NEW EXTERIOR SHALL MATCH EXISTING MATERIALS. NEW ALUM. GLASS ENERGY—COMPLIANT DOORS — VERIFY PREFERRED SECURITY HARDWARE EXISTING 5UILDING TO REMAIN EXISTING MASONRY VENEER TO REMAIN EXISTING CANOPY TO REMAIN — MODIFY AS REQUIRED FOR NEW CONSTRUCTION — EXISTING WINDOWS TO REMAIN EXISTING BUILDING TO REMAIN NEW ROOF TO MATCH HT. OF EXISTING AND SLOPE TO DRAINAGE AT REAR OF BUILDING EXISTING CANOPY TO REMAIN — MODIFY AS REQUIRED FOR NEW CONSTRUCTION — INSTALL NEW 5RICK OVER SHEATHING AND STUD FRAMING. REF WALL SECTION t DETAILS SHEET A5. NEW EXTERIOR SHALL MATCH EXISTING MATERIALS EXISTING 51DE ELEVATION 61,011 NEW 51DEt ELEVATION 3/1611 2 11-01