Loading...
P&Z letter re approval 2/17/00 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 972-462-0022 P.O. BOX 478 COPPELL, TEXAS 75019 February 18, 2000 S 1341 W. Mockingbird Lanel Suite 500 Dallas, TX 75147 RE: S-1173~ Sprint PCS Antenna Dear Madam/Sir: This letter is to inform you that Case No. S-1173, Sprint PCS Antenna, zoning change request from C (Commercial) to C-S.U.P. (Commercial, Special Use Permi0 to allow the construction of a 65'-high monopole to accommodate the Sprint PCS wireless communication antennae and CISD two-way radio antennae, as well as 4 equipment cabinets at the base of the tower at Coppell Middle School West Campus, 1301 Wrangler Road, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, February 17, 2000, subject to the following conditions: 1. A full 24' wide fire lane is required to this site. A temporary fire lane will be acceptable provided the fire lane is constructed of asphalt capable of supporting a 40,000 lb. load. Also, if any additional buildings are added at a later date, a full 24' wide concrete fire lane will be required. 2. A notarized statement by the applicant that the tower will accommodate collocation of any additional antennae for furore users must be submitted prior to Council approval. 3. Provide a legal description of the property. 4. Adjust the Landscape Plan to indicate a green vinyl coated chair-link fence with no barbed wire. 5. Submission of an Irrigation Plan. The date scheduled for consideration by the Coppell City Council is Tuesday, March 14, 2000, at 7:30 p.m. A representative for this case must be present at this meeting. Failure to represent this item may result in the denial of this application. Please revise and submit 17 copies of the Vicinity Map, Parent Tract & Access Easement Detail, Tower Elevation Drawing and Landscape Plan by 12 noon~ Wednesday~ March Ist, in order to forward your case on to Council. If you have any questions, please contact me at (972) 304-3675. cb, A.I.C.P. E~rector of Planning & community Services Ce Peter Kavanagh, Zone Systems, Inc. Isabelle Moro, AICP, City Planner Building Inspection S-1173~ Sprint PCS Antenna Staffnow could support the construction ora 65'-high monopole subject to 5 conditions: 1. A full 24' fire lane is required to this site. A temporary fire lane will be acceptable provided that the fire lane is constructed of asphalt capable of supporting a 40,000 lb. Load. Also, if any additional buildings are added at a later date a full 24' concrete fire lane will be required. 2. A notarized statement by the applicant th_at the tower will accommodate collocation of any additional antennas for future users. 3. Provide a legal description. 4. Adjust the Landscape Plan to indicate a green vinyl coated chain link fence w/no barbed wire. 5. Submission of irrigation plan.