Loading...
PD91R-CS000816 Zoning Application City bf Coppell Planning Department 255 Parkway Blvd. Coppell, TX 75019 (972) 304-3678/Fax: (972) 304-3570 Date: Name of Applicant: fftcHa~zh ~ ~',~,3~-eo/' Address: -72-3 ~o.;At-t_a~o Telephone Number: (9-72-) ~3-Odo~/ Fax Number: Zoning Requested: Total Number of Acres: Property Location: -7 Z~ ~c,3~--t~O x~a~c,- Reason(s) for Zoning Ch~ge: ~q~ ~o-~ ~U~c~ Note: Applicant is responsible for erecting, maintaining and removing a sign to notify the public of the.pending zoning application. The sign shall be posted ten (10) days prior to the Planning Commission meeting and shall be removed after the City Council's approval or disapproval of the application. Failure to erect the sign at least ten (10) days prior to the Planning Commission hearing will result in postponement of the zoning case until this condition is met. A deposit in the amount of one hundred ($100.00) will be required of the applicant when he or she requests a sign. The deposit will be refunded by mail if the sign is returned in good condition to the Planning Department. Name of Representative: Name of Owner: ~-~xc,~ ,AJ~L ~'~"~cC~V Owner's Signature: %~~~ Date: ~ -/b - ~ Richard & Kimberly Stacey 723 Swallow Drive Coppell, TX 75019 July 5, 2000 Attachment 1 - Brick Distributors Contacted Western Brick Company 1606 N. I35E Carrollton, TX Contact: Eric Phone: (972) 2454747 M~ro Brick Company 15301 Addison Road Addison, TX Contact: Don Phone: (972) 9914488 Brick Studio (Boral Brick) 1400 N. Broadway Carrollton, TX Contact: Don Phone: (972) 245-1542 Acme Brick 11261 Shady Trail Dallas, TX Contact: Dee (salesman), Susan Tabor (manager) Phone: (972) 241-1000 Landmark Brick 129 N. Murphy Road Murphy, TX Contact: Dottie Phone: (972) 578-8585 Richard & Kimberly Stacey 723 Swallow Drive Coppell, TX 75019 July 5, 2000 Board of Adjustment City of Coppell Dear Board of Adjustment, We built our home here in Coppell on Swallow Drive in June of 1985. We are in the midst of remodeling our home to include a 2~a floor above the garage. Due to several unfortunate tums, we respectfully request a variance to the city code requiring 80% of new homes / remodeled homes to include 80% brick / masonry. In early February of this year when we began our remodeling we were unaware of the 80% code. When our Architect, Gary, Oliver of Oliver Architectural Construction Company, checked with the city in the process of obtaining the necessary permits, he learned the requirement. Mr. Oliver reworked the plans to include brick on the east and west walls of the addition, including bricking the west side of the garage which was originally siding, and we received our permit. Our home faces north with an alley on the south. Our contractor, Rich Merrill of Metro Leisure Construction, contacted a local Acme Brick distributor and was informed they had the brick in stock. Mr. Merrill poured a concrete slab, widening our garage and set the slab to the cowect dimensions to include brick. When the second floor was framed, it too was built to include brick. Mr. Merrill arranged for the bricklayers to begin work on our home on June 16. The week of June 12, Mr. Merrill contacted the acme distributor about delivery and discovered that they had sold the brick they had in stock. Additionally, he discovered that our brick, Autumn Blend, had been discontinued approximately 10 years ago. Mr. Merrill contacted several other brick distributors, detailed below, searching for Autumn Blend and found they too were sold out. Although, Acme has since produced another brick with the same name, it does not match the original Autumn Blend. We have searched for a brick similar enough as to not detract from our homes' appearance with no luck. We have also considered stone, but discounted this option for several reasons, no small part of which is no other homes in our neighborhood have stone. There are several homes in our neighborhood with 2nd story additions that have been completed without brick or stone. In conclusion, we respectfully request a variance that would allow us to complete the construction of our addition with Hardi-plank, instead of brick. Sincerely, Richard & Kimberly Stacey PROP~ DESCRI~ON ~ ADDR~S: 723 ~ DR~ LOT 2, IN BLDCK 1~, OF NO~E WOOD--DS ~ P~E II, ~ ~OmON TO. ME C~ OF COPPE~ D~ COUP, ~, ~CORDING TO ME ~ OR P~T ~EREOF RECORDED IN VOLUME 83112, P~E · 20B, ~ RECORDS, DA~ COUP, ~. BUILDING RESTRICTION UNES PROPERTY UNES 20' Al I Fy ENCROACHMENTS BUILDING  (SBg'37'4¢"W 74.00') 75.65' · (74.~°) W~D DECK N89'55'26"E 75.65' IRF 2 · "~, ,, ,, IRF 1/2' 6' WOOD ·" FENCE X ........ ED ~" ~_u').. I'-, /J,. ... z.-ira. I LOT 3 ~ ~ ~1-- l.....:.~:~ ............ t'"~'"~i'~ '-I I 0 ,-- LOT 1 · ----.JL1 0 ' ~,~ a o ' o 3.3 x """ '" '" ? ? I "723 I I 0 0 o o I (;Mol [.~- ~,~,.., 0 0 .......... Z Z (/~ ~/} I I+ BRICK LOT 2 · I I " BLOCK I I .~ _i ...... ~g J/r--~m.. _ ~' 158 I IRF '1/2"(NBO'37'44"E 74.00') 74.02' IRF 1/2' BASIS OF BEARING SWALLqW DRIVE Th~ und~mkjn~l do~ h~mb¥ ¢~rU~ that thl~ ~1~ mpm~nta ~n ~umt~ m~d~ ~n th, ground, and th~ boundoH~ ~ located ~¢~rdln~ to th~ r~¢~rd~d r,ff~mn¢~- ,,h~n. E~¢~pt a~ -h~wn, thi- ~m~ h~ to ~nd from ~ public madw~, and them am no ~.ibla ~nfli~, enc~chmen~, overlapping of impmvemen~ or ea~men~. NI me.aummen~ am in f~t. ~is au~ is for the pum~e and parle..hown, unauthorized uae. ~ Mhem will be at theirbelow.Own flak. ~i. ia n~ an ~cial document unle~ an original aign~um app~m B~R: ~AC~ ~ CO.; ~ ~ G.F. NO: gB~4gg7 Al~ L UHC~ R.P.LS. NO.: ~5~ IRF Iron Rod Found DA~: 12-17-08 IRS Iron Rod S~ ~.~.mm. · ~ BRL Buildingu.. m~ction I DAI I ~] D~ON [ D~SU~: ~:E.K.K.O. EM ee~col Me~r 57E8 g 8. ]. ~my, ~ etO GM Go. Meier D~u, T~ 75~-8338 IMPR~M~ ~CH ~: G.M. ( ) Reco~ or deed (~?e) e8~-~6 ~: (g?e) <~-?B67 SU~ JOB NO.: 12-165-98 I