Loading...
PD108-CS 890215Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS Centerpoint Two Suite 400/616 Six Flags Drive Arlington, Texas 76011 - Metro 640-8535 February 15, 1989 Mr. Russell Doyle, P.E. City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Re: The Springs of Coppell Mr. Doyle: I have enclosed 22 sets of bluelines of the preliminary plans revised as per the comments from the DRC meeting last Friday. Several comments could not be addressed on the plans. I have the following explanations for the questions asked by the DRC: 1. Park Road is already dedicated. No improvements are planned for Park Road. An extra 10' of R.O.W. will be reserved for future improvements by the City. 2. The drainage areas along Denton Tap Road do coincide with drainage areas shown on the plans for Denton Tap Road prepared by Ginn, Inc. A drainage area map will be submitted with the construction plans. The only off-site drainage enters the site through Grapevine Creek. 3. The median openings shown on Denton Tap were obtained from the plans prepared by Ginn, Inc. 4. No investigation has been done on the bridge on Bethel Road at this point in the design process. The existing open ditches can be eliminated when Bethel Road is improved. 5. The water and sanitary sewer lines were sized in accordance with the proposed PD-LI zoning. 6. The proposed sanitary sewer lines were extended based on anticipated lot sizes. Sanitary sewer lines shall be extended as necessary to serve all users. e The existing sanitary sewer and water lines shown were obtained from the City layout maps obtained from the engineering department. Mr. Russell Doyle, P.E. February 15, 1989 Second Page 8. Existing sanitary sewer elevations will be verified in the field prior to preparation of construction plans. The park site is laid out to include the WPA improvements. Thank you for your e If ! may be of further assistance, please contact me. cooperation. Si ncerely, GRAHAM ASSOCIATES, IN~ W. Jeff Williams, P.E. Project Manager WOW/cc