Loading...
PD104-CS 870630 CONSULTING ENGINEERS, INC. June 30, 1987 Ms. Taryon Bowman Planning and Zoning Coordinator City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, TX 75019 Re: Creek View Addition - Development Plan NDM No.: 87-5-62 Dear Ms. Bowman: Pursuant to staff comments regarding the Creek View Development Plan submittal, the following reponses apply: Paving of 37' has been addressed on the revised Development Plan. Building lines have been addressed on the revised Development Plan. - Landscape maintenance has been noted on the revised Development Plan. - Variances have been noted on the revised Development Plan. - Zoning districts have been designated on the revised Development Plan. - The accompanying narrative has been revised to reflect the revised Development Plan. Street names to courts have been changed per staff comments. The following reclamation issues were discussed in a telephone conver- sation of June 27, 1987, between Mr. Dennis Johnson, NDMCE, and Mr. Steve Horton, City of Coppell: 1. A Section 404 wetlands determination by U.S. Army Corps of Engi- neers personnel is scheduled for July I a: :he sl:e. I: is no: anticipated that a persit will be required for this project; how- ever, the necessary steps will be taken to comply with Corps resu- lations. 2. We have had several meetings with Mr. Carl Anderson, Anderson Engineers, to discuss the proposed City of Coppell watershed plan and have obtained the necessary hydraulics and hydrology models for Grapevine Creek. 3. Based on the models obtained from Anderson Engineers, we are preparing a proposed hydraulics model and report for review an~ approval by the Federal Emergency Management Agency (FEMA). The Three NorthPark/8800 N. Central Expwy./Suite 300/Dallae, Texam 75231/(214) 739-4741 Ms. Taryon Bowman June 30, 1987 Page 2 proposed plan. will provide for fill only in the flood fringe, and no encroachments are planned on the existing lO0-year floodway. Preseveratton of the natural Grapevine Creek channel is proposed under this plan. 4. The two tributary streams - one at the west end of the site, and theother at the east end - are proposed to drain in a natural s~ate. We a-~e currently preparing HEC-2 backwater models to establish theil00-yea~ flood limits on these tributaries. We trust ~hts addresses aY of the issues on the Development Plan as necessa~ to ~ceed to the Planning and Zoning Commission. If there are any questions, please call at any time. : -- Sincerely, 'A NATHAN D. MAIm t CONSULTING ~GINE~S, INC. Peter Staks PS/r~ cc: Bill ~o~son Mark Hu~y Michael Allen