PD108R2-DR 980528 (6) lltELEC TR IC
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat
Date
__Preliminary/Final Plat is not acceptable.
C//'Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
LX/Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
~Other co~ents '~
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234