PD118-CS 9108028214 ;VESTCHESTI~R, SUITE
DALLAS, TEXAS 7>ZZ5
214:363.~615
AugUst 2, 1991
ViA FAX NO
Mr. Gary L. Mieo
Director Of Planning & Com~nun!ty Services
city o~ Coppell
P. O. Box 478
Coppell, Texas '~5019
Dear Gary:
Pursuant to o~ work session ye~tercla~, following is a summary of
how we ~ould propose deal_ins with the landscaping and maintenance
of the linear p~rk, as well as the other issues raised at the worR
~e~sion.
As discussed, we would propose to turn the llnear park into a green
~pace area. This area would be seeded, as necessary, and mowed on
a regular basis. W~ wou;d propose to do this in conjunction with
the development of the f~rst parcel of the property in question,
which, actually, abuts th~ linear park. Thereafter, the
maintenance of the linear park wouid be assumed by the existing
homeowners' association.
With respect to the second access road to Belt LAne Road (Fairway
Drive}, wlltch was or[g~nally contemplated to be located east of Mac
Arthur Boulevard, we believe that this j. ssue should De addressed at
the time that the parcel abutting this proposed street is
developed.
With respeot to the other commitments origiDally made by Terra to
the City in 1985, conc~rninq this development, the general decline
in real estate v-alues over the last five years, and the reality of
the market today, make ilt difficult, if not impossible, for any new
developer to assume these commitments, to the extent t~at they
exceed current zoning, landscaping, and other requirements of the
city. According, with the exception of the £oregoing, we would,
respectfully, request that no special requirements be imposed upon
this development.
sincerely,
SLJ COMPANY, TRUSTEE
By: '~~, Director
kSL/js