PD129R2-DR010531DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-129-R2, Parks of Coppell, Tract III (Huntington Ridge), zoning change
request fi.om PD-129-R to PD-129-R2, to allow the construction of a masonry
wall and revise monument signs to add raised planting beds on approximately
26.177 acres of property located at the southwest comer of Parkway Boulevard
& Denton Tap Road, at the request of the Huntington Ridge Homeowner's
Association.
DRC DATE:
CONT/I CT:
May 31, 2001 & June 7, 2001
Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STATUS: ,/PRELIMINARY
The proposed screening wall is shown to be constructed in an existing 20' drainage easement,
which was dedicated when the property was developed. As per the notes on the plat "no
buildings, fences, trees, shrubs or other improvements or growths shall be constructed or
placed upon, over or across the 'Utility Easements'".
MAY a 1 2001