PD133R-DR 971030 (3) I/
/ /
~IE LE C TR I C
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat for
Date
Preliminary/Final Plat is not acceptable.
~//Easements will be required for proposed electric facilities. A plat with easement
requirements will be provided to the developer.
Load information (size of structure, AC/Heat Load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 losey Lane Farmers Branch, Texas 75234