Loading...
PD133R-DR 971030 (3) I/ / / ~IE LE C TR I C Comments for the City of Coppell Development Review Committee Preliminary/Final Plat for Date Preliminary/Final Plat is not acceptable. ~//Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, AC/Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 losey Lane Farmers Branch, Texas 75234