PD152R-CS 970806Midcrest Properlies, Inc. To: Mr. Pert Virtanen Fro~ Ken Lambert, PE ~,~te~ August 6, 1997 Upper Image car wash DRC response. Pert; Attached is the check list for our response to Staff cOrnmen~s. The following is an explanation of our position on the items we feel need further discussion at tlie meeting. 1. Removal of the front drive. This front drive is necessary to provide circulation around our facility, Our deed restrictions call for an acoees drive to be p~vided .between all three sites along McCarthur. At the request of you and Gary we have deleted the crossing between our site and Sonic. The Sonic owners agree to closing the connection. The City garage .owner has also agreed to allow closing of the connect'ion between our site and Sonic. We need the drive along the front of our building to allow our customers to have an two egress routes as they i~ave our wash bays. 2. Dwad lilyturf, We requeSt you add this ground cover to your approved plant liSt in order to give us a little more variation in the plant material. If you do not want this material we will simply change to the Big blue Iilytud. 3. Landscaping on the Utility easement. We have in,ailed the harms and trees on this easement because we felt it would make a much nicer street ,s~cape than the previously approved landscape plan for the "Speedy Lube". The utiliflesare already installed and they are in the R.O.W. for McCarthur. We requeSt permission to install the landscaping as shown on our plans. 4. Drying shed. We have requested that the revised irear yard be set at 10' to allow construction of the drying shed roof over this area. 5. Landscape shortage. 'l'he common area north of City Garage was provided to make up for landscape shortages for all three of the tracts. We ere proposing to make sut:~tanttal improvements and upgrades to that area in conjunction with our car wash proiecti 6. Number of stories. The area over the equipment I~utlding on the front wilt be two Story for storage/office use. The area over the wash beys will be one Story only. we respectfully request staff approval of our plans and ioo1( forward to working with you as we complete the zoning, plating, and conStruction process. We will be available at your meeting to answer any further questions. mail 0 D O [] [] D O [] 0 i-1 0 0 [] O n I ~j ' I II I II I I r'l