Loading...
PD156-DR 960328 (6)Date I 1 "~,~ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. V/Other comments ~_~ ~ ~ (~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234