PD136R-CS 981019 (2) Pipeline , ervice. s'
Randy J. Lash (972) 579-3744
Field Construction Coordinator
Metroplex Region- Dallas District
1931 East 6th Street
Irving, Texas 75060
To: Coppell / Zoning Commission
Date: 10/19/98
Re: DFW Trade Center Measuring Station
We are proposing to add a station in this area due to the excessive growth in Coppell,
Grapevine and Flower Mound areas. This location will enable Lone Star Gas to tie their
facilities together to meet the immediate demands of this growth. We have secured a lot
on the North end of Freeport Pkwy. at the DFW Trade Center addition. The buildings in
this area are the large pre-engineered concrete. The one beside this proposal is a light
gray color. We propose wood fencing due to the flexibility of removing walls in the
event we need to get digging equipment in to make emergency repairs or future upgrades.
The entrance gate will be on the west side of this station and is close to the edge of the
road. We generally put crushed rock all weather surface inside the station and any drive
area. A water hydrant located on the comer of Freeport Pkwy. and Patriot Dr. which is
approximately 350 to 400' from the station. Thank you for looking at this and please call
if you need additional information for this request.
Sincerely;
Randy J.
CC: T.W. Rudd