Loading...
PD145R2-DR 990902 DE VEL OPMENT RE VIE W COMMITTEE BUILDING INSPECTION COMMENTS ~: 130 Pinyon DRC DATE: Sq,tember 2, ~999 CONTACT: Greg Jone~ Cblef Building ~ (304-3500) PREI~IMINARY FINAL 1. It is our understanding that the main structure will not be affected by this addition. 2. Engineered structural will need to be submitted with building permit application. 3. Building Permit will need to be applied for separate~ if approval of PD is grantea~ drc12345 ALJ62TI999