Loading...
PD134R-DR 960425 (5) m m FUELEC TR IC Comments for the City of Coppell Development Review Committee Preliminary/Final Plat for ~'~ -'~.-~-~ ~ Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ~V//Other comments /~ ~ ~9/--~/~ ~./~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234