Loading...
PD147(CH)-DR 950928 (4) " ELEC TRIC Comments for the City of Coppell Development Review Committee P~l"'~n~rv/Ft~al F].~t for Date Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ~Othercomments ~Cr~~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234